Requests Additional Information to Continue Review of the Quality Assurance Program for Plant Operation and Proposed Change to Add an Access Platform to the Refueling Bridge Structure
ML17037C532
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/26/1973
From: Ziemann D
US Atomic Energy Commission (AEC)
To: Raymond P
Niagara Mohawk Power Corp
References
Download: ML17037C532 (12)


Text

JUL 2 6 1973 Docket Ho. 50-220 Niagara Hohawk Power Corporation ATTN: Hr. Philip D. Raymond Vice President - Engineering 300 Zxie Boulevard 'Pest

Syracuse, Hew Yorlc 13202 Gentlemen:

To continue our review of two considerations related to Hine Hoyle Point Nuclear Station Unit 1, additional information is necessary.

The two considexations under present review

.are:

(a) the Quality Assurance program for plant operation, and (b) your proposed change to add an Access Platform to the refueling bridge structure.

Our 1etter to you dated ofay 21, 1973, requested that you submit within 90 days a description of your QA progran responsive to current guides.

To preclude unneCessary iterations in this matter, we have identified particular QA information which we need to complete oux review.

There-fore, you axe requested to provide this additional information in your response to our Hay 21, 1973 lettex ox as an addition to that xesponse.

All of this information, including that previously requested, should be submitted by Hovember 23, 1973.

Your proposed change to Nine Hile Point Unit 1 requested by letter dated Januaxy 11, 1973, involves adding an Access Platform to the refueling bridge structure to expedite the refueling operation and also improve personnel safety.

Our review of this proposal has included a meeting on June 6, 1973, with your representatives to discuss structural and mechanical considerations reLated to this change.

At this meeting, we indicated that we would require additional information.

,This additional information is identified in the enclosure.

This information should be submitted within 45 days of the date of this letter in order for us. to, complete our review on a schedule compatible with your next xefueling outage.

i O.

I P. 4 4

~h 4]i If 4.

ii fi 4J I

4

]j I

UJ 4

'I

, Ii IU 4

I i

U I 'I i

'4

'I I

I I'

4

.I

\\

4 4I I

I IP"

'I

Hiagara Mohawk PoT3er Corpdxation JUL 8 6 1973 Please provide the requested additional QA information in three signed and notarised originals and thixty-seven additional copies.

The requested additional information regarding the Access Platform should be provided in one signed original and thirty-nine copies.

Sincerely, Original Signed by:1 Rennes,L; Ziemann Dennis L. Ziemann, Chief Operating Reactors Branch IJI2 Directorate of Licensing

Enclosure:

Request for Additional Xnformation cc w/enclosure!

J. Bruce HacDonald, Esquire Deputy Commissioner and Counsel New York State Depaxtment of Commerce and Counsel to the Atomic Energy Council 99 Washington Avenue Albany, He's York 12210 Arvin E. Upton, Esquire LeBoeuf, Lamb, Lad.by

& 8acRae 1821 Jefferson Place, H. Mi Washington, D. C.

20036 cc v/enclosure and HNP ltr dtd 1/11/73:

Dr. william Seymour New York State Atomic Energy Council Mew York /tate Department of Commerce 33.2 State Street Albany, mew York 12207 Disczibuciou Dockec F11e ABC PDR Local PDR RP Reading Branch Reading JRBuchanan, ORNL DJSkovholt, L:OR

TJCarter, L:RP ACRS (16)

RO (3)

BBordenick, OGC

LShao, L:SSB CLong, L:APCSB CJDeBevec, L:ORB II2 DLZiemann, L:ORB //2 RMDiggs, L:ORB 732 Oswego City Library 120 E.

Second Street

Oswego, New York 13126 OFFICE Ib SURNAME >

L:ORB //2 X74o3+cg~

CJDeSeyec:sj L:ORB /Z eee DLZiemagg.

7(25(73

...?J.25(73........24-4.

J3----

DATE Ie ceo e43 10 Sl4aI I EI~18 Fotm AEC-318 IRcv. 9-53) hECM 0240

I It I~

I I

~

'I t

NXME HXLZ POX'UCLEAR STATXOM UNIT 1 EST ZOR ADDITION. uroaHATIom A

UALITYASSURMCE PROGKhH 70R 'OPERATION To complete our evaluation, ve xequesC the following information relative to the QA program for operations for Hine Hile Paint 1.

l.

Provide organizational charts and descriptions of the organi-zational structure Tshich show and describe the corporate and plant organizational positions, individuals, and groups responsible for performing the QA functions as defined in Appendix B of 10 CPR 50 for the activities related Co opera-tion, maintenance, repair, modification, and xefueling of the Kine Hile Point 1 station.

2.

Provide a description of the responsibilities, authority, and independence of those individual positions or groups vithin ltiagara 'Y~havk responsible for formulating5 estab-

1ishing, and implementing QA related policies, procedures, and instructions fox Che operational phase.

Identify Che organizational positions respdnsible for originating, reviewing, and approving the QA program policies, procedures, and instructions for operation, maintenance,

repair, and modifi-cation activities.

Include both corporate and station activities.

3.

Define Niagara Hohavk's quaUfication requirements fox the positions that: manage or supervise the corporate and station QA activities.

4.

Describe Che duties, authority, and independence for the organi-zational positions and groups >which,perform reviev, inspection, and auditing activici'es for the QA functions in accordance arith 10 CPR 50, Appends.'B.

5.

Provide n cross indm chart or a listing which shoes each QA pxogram procedure with the applicable critexia of 10 CPR 50, Appendix B.

Identify Che responsible individual or group who originates,

@ho reviews, and +ho approves each pxocedure.

OFFICE P SURNAME >

DATE>

Form hKC-518 (Rcv. 9-53) AKCt4 0240 ohio AS-lC Sli05-I A~Id

)'K I

I I

II II )

I I

I I

)

IlJL'I I

J P

W I

'1 I

I I I

2 6.

Provide a description of the ma)or attxibutes, including purpose and scope, of those QA procedures which assure that the activities

'f opex'ating, maintaining, repairing, and modifying the Nine Mle Point 1 station comply with the criteria of 10 CPR 50, Appendix S.

7, 'Provide a listing or tabulation of those stxuctures,

systems, and components which willbe controlled by the QA pxogram.

8.

Identify and describe those provisions within the QA program which demonstrate compliance with the'uidelines in Regulatory Guide 1.39, "Quality Assurance Program Requirements for Operations".

Identify any exceptions and )ustify alternate pxoposala.

10.

12.

13.

Descxibc the formal indoctrinational and training program which has been or willbe established for all those personnel performing QA related activities which will assure proficiency of implementation of QA policies, procedures, and Xnstructions.

If the pxogram does not alxeady exist, provide a date for implementation.

Identify those individual position(s) or group(s) xesponsible, for reviewing and approving the QA'programs and QA'manuals

'or contxactors and vendors.

k Describe the administrative controls (document'ontxol systems) which assure that the QA program policies, procedures, and instructions, including changes

thereto, are distributed and

'mplemented in a timely manner by the responsible individuals or groups for thc activities related to the operation, maintenance,

~

repair, and modification of the Nine lLLle,Point 1 station in'ccordance with 10 CPR 50, AppencU.x 3.

Describe those procedures which identify quality related records to be rotained, the retention period, the storage location, and the assigned responsibility.

Identify and describe those audits performed by corporate management which confirm independent evaluation and assurance of the QA program policics, activities, and,procedures.

The purpose of these audits is to assure effective> meaningful compliance with corporate policy and 10 CFR 50, AppendQc D

on a pex'iodic, scheduled basis.

Identify the organizational positions which wi11 perform thc audit, list xeport distribution, and state audit schedule.

OFFICE D SURNAME >

DATE >

Potion hEC-318 (Rcv,9-$ 3) hECM 02CO ohio c4310 SILOS-1 44~18

0

. l C

I i

IJ P

3 'J g.9~7 4

W I'p C

(

1 S

I 1

I r,

t V

P II P

14.

Identify aad describe those independent, scheduled audits vhich provide a comprehensive verification and evaluation of all phases of the, QA program activities and procedures to confirm on a continuous basis Chat a meaningful and effective QA program is in effect.

Identify the organizational positions which ldll perform the audit, state audit schedule, and Riot report cKstribution.

Bo THE ACCESS PLATFORM ADDITXOH TO THE REPUEL'IMG BRIDGE STRUCTURE 1.

Since the Refueling Bridge Structure >rill be extensively remodeled and altered, provide the fpllcF9d.ng'.

Design criteria which should include a list of design loads and load combination equations.,

b, Design methods.

Limiting values of stresses and/or strains.

d.

List of codes, standards, aad specifications used.

Describe the areas of the design which exceed the minimum code requirements.

e.

List of structural matarials used, including melding methods and codes r~uh.'ed.

Include Che list of materials used in the retained portioncI of tho original structux'o that vill be included in tho extensively remodeled gantry crane.

f.

Quality control methods to be used including fabrication and eroction tolorances.

g.

Eton-Destructive Examinations (HDE) to be porformed during fabrication, final assembly, preopexatioa, and XIormal operation'.

Since the mechanical arrangemeat of the monorail Md th@ proposed access platform have added Co and extensively altered tho stability and load handling oyotem used in tho originaX. crane structure, provide tho followlag:

a.

. State tho performance,requirements for gantry travel, tx'olloy travel, monorail travel, encl vex'tical lift, fox tho maintenance platform.

This should include all ll

'FFICE W

SURNAME>,...........---

~- --~--

DATE0 Form hEC-318 (Rev. 9-53) hECht 0240 ohio ers-r0 dlr05-I 445%78

4 l

'D il 1

i J

f i

kI'L F

I f

1 ill lt i

t, Jl

loadings and the individual and parallel loading conditions of the platfoxm, monorail, or trolley and indicate erich are used separately ox in combination and the velocities involved c b.

Specifically state the standards,

codes, and speoifkcationa used in design end manufacture (i.ec, CHAA70-AXSE-6, AXSC).

Indicate the areas of design or manufacture that exceed tho gd.nimum requirements of the otandaxds used for the mechanical design of the access platform.

c~

Define the operational control, euergency and safety featuxes provided for the crane handling systems.

'Xhis should include itens such as brakes, limit bitches, stops,

bumpers, and, fail clamps.

Stato uhnt occurs at time of power failure, inadvertent opexation, and nLLfunction of the individual items of each of the crane handling systems.

d.

An outline of the general operational procedux'es for the new gantry crane handling system.