ML17037C507
| ML17037C507 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 07/22/1974 |
| From: | Raymond P Niagara Mohawk Power Corp |
| To: | Ziemann D US Atomic Energy Commission (AEC) |
| References | |
| Download: ML17037C507 (6) | |
Text
AEC DI IBUTION FOR PART 50 DOCKET MAr IAL (TEMPORARY FOIQf)
CONTROL NO:
FROM:
Niagara. Mohawk Power Corporations Syracuse,"New York Philip D. Raymond DATE OF DOC 4-22-74 DATE REC'D 4-26-74
'FILE:
Dennis L. Ziemann ORIG 1 si ned CC OTHER SENT AEC PDR SENT LOCAL PDR CLASS UNCLASS PROP INFO INPUT NO C S REC'D DOCKET'O:
DESCRIPTXON:
ENCLOSURES:
50-220 Ltr re our ltr 3'-25-74 )urn info to support their request for withholdinguo( their 1-15-74
- trans, "Part 2-Proprietary Response" 90 NOT REMOVE
.gKKNOWLEDGED
. NINE MILE POINT UNIT 81 FOR ACTION/INFORMATION 4"26"74 GMC BUTLER(L)
W/
Copies CLARK(L)
W/
Copies PARR(L)
~r) rr
-~
W/
IJA)@*CD KNIEL(L)
W/
Copies SCHWENCER(L)
W/
Copies STOLZ(L)
W/
Copies VASSALLO(L) rrl r.
~
W /
L)IJP J.VD PURPLE (L)
W/
Copies V ZIEMANN(L)
W/ 9 Copies DICKER(E)
W/
Copies KNIGHTON(E) "
TT/
L)L/PA.&K)
YOUNGBLOOD(E)
W/
Copies INTERNAL DISTRIBUTION REGAN(E)
W/
Copies W/
Copies w/
COP i+is W/
Copies
- iOGC, ROOM P<<506A MUNTZING/STAFF CASE GIAMBUSSO BOYD MOORE (L) (BWR)
DEYOUNG(L) (PWR)
SKOVHOLT (L)
GOLLER(L)
P, COLLINS DENISE
/REG OPR
.V FILE & REGION(3)
MORRIS STEELE TECH REVIEW HENDRIE SCHROEDER MACCARY KNIGHT PAWLXCKI SHAO S TELLO HOUSTON NOVAK ROSS IPPOLXTO TEDESCO LONG LAINAS BENAROYA VOLIMER DENTON GRIMES GAMMXLL KASTNER BALLARD SPANGLER ENUIRO MULLER DICKER KNIGHTON YOUNGBLOOD REGAN PROJECT LDR HARLESS
'IC ASST B//DIGGS (L)
GEARXN (L)
GOULBOURNE (L)
LEE (L)
MAIGRET (L)
REED (E)
SERVICE (L)
SHEPPARD (L)
SLATER (E)
SMITH (L)
TEETS (L)
WADE (E)
WILLIAMS (E)
WILSON (L)
A/T IND BRAIIMAM SALTZMAN B.
HURT PLANS MCDONALD DUBE w/Input INFO C,
MXLES B.
KING {E/W-358)
KLECKER EISENHUT EXTERNAL DISTRIBUTION 1 - LOCAL PDR OSWEGO Y
Jl " TIC (ABERNATHY)
(1) (2)(10)-NATIONAL LAB' I/1 - NSIC(BUCHANAN) 1-ASLBP(E/W Bldg,Rm 529) 1 - ASLB
~
1-W.
PENNINGTON, Rm E>>201 GT Po Ro DAVXS (QEROJET NUCLEAR) 1 CONSULTANT S f16 " CTS ACRS HOLDING NEtR1ARK/BLUME/AGBABXAN Sent to Lic Asst Diggs 4-26-74 1-GERALD ULRIKSON...Oft.
1-B & M.SWINEBROAD, Rm E-201 1-PDR-SAN/LA/NY 1-GFRALD LELLOUCHE BROOKHAVEN NAT. LAB 1"AGMED(Ruth Gussman)
RM"B-127, GT.
1-RD..MULLER.,F-309 GT GT
~
c
-4.
H 4
I v
I'I H
'Ill'I
NIAGARA MOHAWK POWER CORPORATION
.I>II%i, NIAGARA~
MOHAWK 300 ERIE BOUI.EVARO WEST SYRACUSE, N. Y. IMOR April 22, 1974 Mr. Dennis L. Ziemann, Chief Operating Reactors Branch
//2 Directorate of Licensing United States Atomic Energy Commission Washington, D. C.
20545 II g///p
. CCPAj/C ~ ~f.~
IQ Pp~<glq, '@$gCy
Dear Mr. Ziemann:
Re:
Nine Mile Point Unit 1 Docket No. 50-220 Your letter dated March 25, 1974 requested further information concerning "Part 2 Proprietary Response" attached to our letter of January 15, 1974.
Based on a request made by the General Electric
- Company, we requested proprietary treatment of that portion of the re-sponse.
General Electric requested that the information contained in Supplements B and C to the Nine Mile Point Unit 1 reload license submittal be'withheld from public disclosure.
This information is available only on a 'need to know'asis to General Electric employees.
It has not been released outside the company except through limited releases designated as proprietary and strictly controlling its use.
For example, the manufacturing specifications and tolerances shown are based on extensive experience and experimental data gained at General Electric's expense.
Public. release could, allow competitors to dupli-,
cate all or part of the fuel without similar expense.
Public disclosure of the getter characteristics would substantially decrease the commercial advantage which General Electric has developed in this area at its con-siderable expense.
The neutron fluxes and,fuel rod pressures have been determined from proprietary models developed at General Electric's expense.
3 "II4HEC faAEC APR 26j97y
>~8<<ATOH,Y DOCKET FILF, COPY-CGCIIEg g)EII'It e~
9 6
n~
4 I5>
Dennis L. Ziemann April 22, 1974 Niagara Mohawk therefore requests that this material be treated as proprietary by the AEC and protected from disclosure under the provisions of 10 CFR 2.790.
Philip D. Raymond Vice President Engineering
/sz
'0 H
M'l
'I 41