ML17037C487
| ML17037C487 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 03/18/1974 |
| From: | Ziemann D US Atomic Energy Commission (AEC) |
| To: | Raymond P Niagara Mohawk Power Corp |
| References | |
| Download: ML17037C487 (8) | |
Text
MAR 1 8 1974 Docket No. 50-220 Niagara Ihhawk Power Corporation ATPil:
I~ir. Philip D. Rayonnd Vice President Engineering 300 )Me Boulevard Nest
- Syracuse, Nevi York 13202 b
Gentleaen:
Distribution Docket +le AEg PDR Local PDR Branch Resiny JRBuchanan EGSkovholt TJCarter ACRS (16)
RO (3)
OGC DLZiemann CJDeBevec HNDiggs SVarga RTedesco To continue our review of your application notarized June 27, 1972, for conversion of Provisional Operating License No. DPB-,17 to a full-term operating license for Nine Kile Point Unit 1 (NbP-l), additional information is required.
The information requested is described in the enclosure to this letter and pertains to the financial information which is required to enable us to evaluate the financial qualifications of Niagara Mohawk Power Corporation to operate the MP-1 facility.
You are requested to provide this information on or before April 26, 1974, as an amendment to your application with three signed and notarized originals and nineteen additional copies.
Sincerely, roriginal. Signed by Dennis I. Ziemann
~s L. Ziemann, Chief Operating Reactors Branch P2 Directorate of Licensing
Enclosure:
List of Additional Financial Info cc w/enclosure:
See next page OFFICE >
SURNAME D DATEb L:ORB $2
QvP-----
CJDeBevec:rwg r
3/ 18 /74 L:0 s
3//$ /74 DLZiemann 3//g /74 Form hKC-318 (Rev. 9-53) hKCM 0240 V ~ 5 ~
OOYC RNIICII T I'IIIN T INC OFF I CC 197 I 443 50S
I.
V v
IY
~ Y<
<-i%iagara Mohawk Power Corporation 2-MAR 1 8 1974:
cc w/enclosure:
J. Bruce MacDonald, Esquire Deputy Commissioner and Counsel
'ew York State Department of Commerce and Counsel to the Atomic Energy Council 99 Washington Avenue
- Albany, New York 12210 Arvin E. Upton, Esquire
- LeBoeuf, Lamb, Leiby 6 MacRae 1757 N Street, N. W.
Washington, D.
C.
20036 Dr. William Seymour Staff Coordinator New York State Atomic Energy Council New York State Department of Commerce 112 State Street
- Albany, New York.12207 Aui.hvny Z. Roisman, Esquire Berlin, Roisman and Kessler 1712 N Street, N.
W.
Washington, D. C.
20036 Oswego City Library
Cl
a ADDITIONAL FINANCIAL'NF0RMATION RE UIRED CONVERSION OF PROVISIONAL TO FULL-TERN OPERATING LICENSE NINE i<ILE POINT NUCLEAR STATION UNIT 1
DOCKET NO. 50-220 2.
3.'ndicate'the annual costs to operate the subject facility for at least the five-year period subsequent to the conversion of the provisional operating license to. a full-term operating license.
The types of cost included in the estimate should be indicated and should include (but not necessarily be limited to) op ration and maintenance expenses with fuel costs shown separately, depreciation,
- taxes, and required return on investment.
Indicate the source or sources of funds to cover all oi the estimated costs.
(Attached is a form which may be used for each year of the five-year period)
Indicate the estimated costs of permanently shutting down the facility, a listing of what is included in these costs, the assumptions made in estimating the costs,, the type of shutdown contemplated, and the source of funds to cover these costs.
Provid an estimate of'he annual cost to maintain the shutdown facil'ity in a safe condi.tion; Indicate what is included in the estimate, assump-tions made in estimating the costs, the type of shutdown conte- -'-."-d avid i.he source oi funds to cover these costs.
?.
Provide a copy of the prospectus for a recent security issue.
Provide copies of the 1973. if available, annual reports to stock-holders and the most recent balance
- sheet, income statement, and statement of sources and application of funds.
Indicate if Niagara Hohawk Power Corporation
{NHPC) expects to be able to sel.l power produced by the subject facility at a rate which will cover all costs of production plus a reasonable return on invested capital.
Provid a copy of the most recent Officer's Certificate prepared by NNPC in connection with the issuance of mortgage bonds and showing interest coverage and debt ratio calculations pursuant to the applicable bond in-denture.
B.
Provide any other information which would be needed to determine he. finan-cial ability of Ni~iPC to operate the reactor 'and to shut down the reactor and maintain it in a safe condition.
el~'STT~ilhTHO AN'.EQUAL COST OP OPI;RATTNG NUCLL'Al,'l:.."H'4%T'Ill<
UNIT:
X'Oii T!i! CALEiiDA)'l'.ARl9 (thousands of dollars)
~0 -notion nol mainoonan-e a~poses Nuclear fuel expense (plant fac Other operating e"penses.......
?Jaintcnance expens s...........
Total nuclear po:rer C i/'I
>>J
~
~ ~
~
~
~
5>>
~ ~ ~ ~
to-
~
~
~ ~
~
~
~
~
~
~
~
~
~ ~
~
~ ~ ~ >>
~
~
~
~ ~ ~
~
~
~
~
~
~ >>
~
~
~
~ >> ~ ~ >>>>>>>>>>
~ >> e generate.on.................
Transmissxon expenses...'.........................
~
~ ~
~
~
~
~ >>
~ >>
Adminisoxooive and ~enezsl expenses Property and liability insurance Other. A.GG.
exp nses..
~s>>
's a
e Aotal E'Le old ~ expells'es>>
~ e>>
e
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
>> ~
~ ~
~
~ >>
~
~
~ >>
~
~
~
~ ~ ~ ~ >>
~ ~
TOTAL Our HZPrHSES..................
>> ~ ~ ~
~ ~
~ ~
~
Deprecxatxon expense...........,........
~
~ ~
~
~
~ ~ >>>>
~
~
~ ~ ~
Ta..es other than incor::e taxes Proper tj taxes
~
~
~
~
~
~
~ >>
~ >>
~ ~ ~
~ >> ~
~
~
~
~
~
0'ther
~
~ >>
~
~
~
~ >>>>
~
~ ~
~ >>>>
~
~
~ >>
~ ~
~ ~
~
~
~
~
~
~
Total taxes other than incone
'taxes
~ ~
~
~
~
~
~
~
1
~
~ ~ >>
~
~
~
~ >>
~
~ ~ ~
~
~ ~
~
~ ~
~
~ ~
~
~
~ ~ >> ~
~
Xncop1e taxes Federal..
~
~
~
~ ~
~
~
~
~ >>
Xllco Ae taxes 0 t)1er>>
~
~
~
~
~
~
~
~
~
~
~
~ ~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
Deferred income taxes net....
~
~
~
~
~
~
~ ~ >>>>>>>>>>
~
~
invests".ent tax credit adjustn;eats net...............
)'e turn (ra te nf re turn-
/3
~
~
\\
~ ~
~
~
~ >> ~
~
~
TOTh:!. AtiNU1L COST 0".OP)""ATTOi'
~
)I
~ ~ ~
$>>/ >>>>'/