Category:Letter
MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01
[Table view] |
Text
AEC DISTRIBUTION FOR PART 50 DOCKET MATFRIAL (TEMPORARY FORM) CONTROL NO:
I'4 4> g%
FILE. ENVIRON FROM: DATE OF DOC DATE REC'D LTR MEMO RPT OTHER New York State Dept. of Environ Conservation Albany,'.Y. 12201'r.
J.L. Bi ane 10-12-73 10-18-73 TO: ORIG CC OTHER SENT AEC PDR XXX R.C. Clancy 1 SENT LOCAL PDR XXX CLASS UNCLASS PROP INFO INPUT NO C S REC'D DOCKET NO:
XXX 50-22 410 DESCRXPTXON: ENCLOSURES:
Ltr furn info regarding Water Certification for Nine Mile Point Units & 2... . K. ~
ACKNOWLEDGED PLANT NAME: NiKe Mile Point 1 6 2 DO NOT REMOVE FOR ACTION/INFORMATION 10<<19-73 JB BUTLER(L) SCHWENCER(L) ZXEMANN(L) ~REGAN(E)
W/ Copies W/ Copies W/ Copies W/g Copies CLARK(L) STOLZ(L) DICKER(E)
W/ Copies W/ Copies W/ Copies fl/ Copies GOLLER(L) VASSALLO(L) '/
KNIGHTON(E) "
Copies Copies
'/
W/ Copies Copies W/
KNXEL(L) SCHEMEL(L) YOUNGBLOOD(E)
W/ Copies W/ Copies W/ Copies W/ Copies XNTERNAL DISTRIBUTION REG FILE CQ, TECH REVIEW DENTON A/T IND AEC HENDRIE GRIMES LIC ASST BRAI'QUAN
+OGC, ROOM P<<506A SCHROEDER GAMMXLL DIGGS (L) SALTZMAN ss/ MUNTZXNG/STAFF MACCARY KASTNER GEARIN (L)
CASE KNIGHT V'BALLARD GOULBOURNE (L) PLANS GXAMBUSSO PAWLICKI SPANGLER LEE (L) MOD ONALD BOYD SHAO MAIGRET (L) DUBE
~MOORE (L) (BWR) S TELLO ENPLRO SERVICE (L)
DEYOUNG (L) (PWR) HOUSTON MULLER SHEPPARD (E) INFO y/ SKOVHOLT (L) NOVAK DICKER ~SMITH, (L) C, MILES P. COLLINS ROSS KNIGHTON TEETS (L) emann~
PREG OPR IPPOLITO TEDESCO YOUNGBLOOD REGAN WADE (E)
WILLIAMS (E)
~ gtolz.
FILE 6 REGION(3) LONG PROJECT LDR WXLSON (L)
MORRIS- LAINAS STEELE Ns'ENAROYA N HARLESS VOLIMER EXTERNAL DISTRIBUTION 1 - LOCAL PDR Oswe o N.Y.
P 1 -
DTXE(ABERNATHY) ~(l) ~~NATIONAL LAB'~A4 1-R.Schoonmaker,OC,GT,D-323 1-PDR-SAN/LA/NY 1-GERALD LELLOUCHE 1 NSIC(BUCHANAN) 1 - ASLB(YORE/SAYRE/ ~.l-W. PENNINGTON, Rm E-201 GT BROOKHAVEN NAT. LAB WOODARD/"H" ST. 1-CONSULTANT'S 1-AQ LED (WALTER KOES TER 16 - CYS ACRS HOLDING NEWARK/BLUtiE/AGBABIAN RM-C-427-GT 1-GERALD ULRIKSON...ORNL 1-RD..MULLER..F-309 GT
~ II ~
~ ~
I 4
~ ~ ~ ~ ~
NevI'York State Department of Environmental Conservation Henry L. Diamond, Albany, N. Y. 12201 Connnissioner October 12, l973 Mr. Richard C. Clancy Manager, Environm=ntal Engineering Niagara Mohawk Power Corporation 300 Erie Boulevard I'r'est Syracuse, New-York 13202
Dear Mr. Clancy:
Ne have reviewed your application of January 5, 1973, pur'uant to Section 401 of the Federal I'later Pollution Control Act Amendments of 1972 (the "Act"),
Based upon the foregoing, and that public notice was duly given pursuant to . art 608.16 of the Official Compilation of Codes, Rules and 3'egulations of the State of'New York, the Department of'Environmental Conserva ion, (the "Dr:parent") hereby issues this certification with conditions to the above-mentioned application of January 5, 1973, for certification, in accordance with Section 401 of the Act, that, as of the date hereof, there is no applicable effluent limitation or other limitation under Section 301 (b) and 302 of the Act, and there is no standard under Sections 306 and 307 of the Act applicable'o the activity which Niagara Mohawk Power Corporation ('MPC") proposes to conduct (i.e., construction of its Nine Mile Point Unit No. 2 Nuclear Generating Facility on Lake Ontario in the Town of Scriba, Qswego County, New York) .
TM.s certification with conditions is issued with the full understanding and acknowledgement by %PC that the State of New York, in cooperat" on with the U. S.
Environlrental Protection Agency, is in the process of promulgating revised thermal criteria in order to bring such criteria into conforllu.ty with the Act.
Furthermore, it is intended that. both Nine Mile Point Units.ho. 1 and 2 will be required to comply with the above-mentioned revised criteria. %PC does not hereby waive its right to seek relief from compliance as authorized under Section 316 (a) of the Act or other provisions of law.
Pursuant to Section 401 (d) of the Act, and in accordance with the require-rrents of the New York State Environmental Conservation Law and the Official Compilation of Codes, Rules and Regulations of the State of New York, particularly Parts 700-704, Classification and Standards of Quality and Purity of Naters of
IE n
I
~,~
Nr. Richard C. Clancy October 12, 1973 New York State, this certification hereby sets forth the follo~6ng requirements
~ which shall become conditions on any federal license or permit for the heretofore described proposed activity of QPC:
- 1. The present design and operation of Unit 81 has resulted in large fish kills. The proposed Unit 2 intake is conceptually the same as Unit 1. Although the proposed Unit 2 intake velocity will be less than that of Unit 1, Unit 2 will draw an increased volume of water. The existing information concerning fish impingement with varying intake water velocities and volumes of water withdrawn is insufficient to predict accurately the long-tenn impact the pro-posed Unit 2 intake system tmuld have on aquatic organisms. For these reasons, it is felt that the best estimate for potential impact of Unit 2 must be based on the experience from Unit 1.
Therefore, the Unit 2 intake design as proposed jias i,ot been proven acceptable, and no construction of this structure as pro-posed shall be permitted until the evaluation of the economic and environmental. impacts of the present and alternative "ntake systems is made by the applicant in order to determine a preferred system for installation. This evaluation must be submitted to the Depart-ment of Environmental Conservation and receive the Department's approval prior to any construction of the intake system. h'henever the applicant believes it, has accumulated information which can clearly demonstrate that, the operation of Unit 2 will;.ot result in large fish kills, the applicant may petition the Department of Environmental Conservation to reconsider its decision regarding the proposed Unit' intake system.
- 2. Department acceptance and approval of an intake system shall be based upon studies and the .submission of reports which show con-clusively that, fish expected to be near the proposed intake structure, can, and will, avoid entrapment in the structure, or:
an evaluation of alternate intake structures which reduce to an acceptable level, or eliminate, entrapment. Alternates to be evaluated should include:
- 1. Design changes of offshore intake structure, reducing entrapment;
- 2. Relocation of offshore intake;
- 3. A shoreline intake with a horizontal traveling screen or other structure to prevent fish entrapment.
In the event that fish entrapment cannot be eliminated, studies and reports are required which evaluate alternate systems of handling fish to reduce or eliminate mortality. Alternate systems 'ntraoped to be evaluated should include:
I 0
Mr. Richard C. Clancy October 12, 1973
- 1. Horizontal traveling screens to guide fish to a b)vassp
- 2. Modified Beloit-Passavant screens;
- 3. Louvers for guiding fish to a bypass;
- 4. Incline plane screen.
- 3. Progress reports of studies previously referred to and required, in ted.s certification shall be forwarded by %PC first class mail to the Commissioner, New York State Department of Environmental Conservation, 50 4'olf Road, Albany, New York 12201 every two months, commencing with the second month following the month of this certi-fication. The final rcport of such studies shall be forwarded in the same manner, three months prior to the date of completion of final design of the int'Re system.
- 4. A copy of any other reports for Nine Mile Point Unit No. 2 per-taining to the environment which QPC submits to any federal, state or local agency, shall also be submitted to the Department.
- 5. This certification with conditions shall not be deemed, to modify, extend, or affect in an) manner any order of the Comm-'ssioner of Environmental Conservation against Niagara Mohawk Power Corporation; does not constitute a condonation of any violation of any order or release, compromise, or waiver of any rights or any course of action
. which the Conunissioner of Environmental Conservation has or may have
.against kWC because of any violation of any order; and does not preclude compliance of the discharge from Nine i~iile Point Unit No. 2 with any permit with respect to such discharge >>hich may be hereafter issued by the Commissioner.
This certification with conditions is issued solely for the purpose of Section 401 of the Act.
A copy of tId.s certification with conditions is being forwarded to the Director of Regulations, U.S. Atomic Ener~ Commission, and the Regional Administrator of the Environmental Protection Agency; Sincerely, ecutiveW~puty Coaatu.ssioner
'0 Regulator J> File Gy.
9 10 DoclHEl osAEc oCT ze ivy RBuurpar uAta sacnpa nocaa etta@