Text
AEC O'BUTION FOR PART 50 DOCKET MA~RIAL (TEMPORARY FORM)
CONTROL NO!8032 FILE:
FRM:
Niagara Mohawk Power Corp.
- Syracuse, N. Y,'3202 R. R. Schneider 11-5-73 11-5-73 b DATE OF DOC DATE REC'D LTR MEMO RPT OTHER TO 0 D. J, Skovholt ORIG 1 signed CC OTHER SENT AEC PDR X
SENT LOCAL PDR X
CLASS UNCLASS PROP INFO INPUT
~
NO S REC'D 40.
DOCKET NO:
50-220 DESCRIPTION:
Ltr re our 10-26-73 ltr......furnishing info re computer calculated points for the maximum average planar lineal heat generation rates...'LANT NAME: Nine Mile Point Unit 1 ENCLOSURES:
/ACKNOWJ EDGED DO NOT REMOVE FOR ACTION/INFORMATION 11 6-73 GC BUTLER(L)
W/
Copies CLARK(L)
W/
Copies GOLLER(L)
W/
Copies KNIEL(L)
W/
Copies SCHWENCER(L)
W/
Copies STOLZ(L)
W/
Copies VASSALLO(L)
W/
Copies SCHEHEL(L)
W/
Copies
/ZIEMANN(L)
W/ 9 Copies DICKER(E)
W/
Copies KNIGHTON(E) "
W/
Copies YOUNGBLOOD(E)
W/
Copies INTERNAL DISTRIBUTION REGAN(E)
W/
Copies W/
Copies W/
Cogies W/
~OGC, ROM P-506A MUNTZING/STAFF CASE GIAMBUSSO BOYD MOORE (L) (BWR)
DEYOUNG (L)(PWR) vSKOVHOLT (L)
P, COLLINS vREG OPR FILE & REGION(sIL)
MORRIS STEELE TECH REVIEW HENDRIE SCHROEDER MACCARY KNIGHT PAWLICKI SHAO S TELLO HOUSTON NOVAK ROSS IPPOLITO TEDESCO LONG LAINAS BENAROYA VOLIMER DENTON GRIMES GAMMILL KASTNER BALLARD SPANGLER
'NVLRO MULLER DICKER KNIGHTON YOUNGBLOOD REGAN PROJECT LDR HARLESS LIC ASST HIGGS (L)
GEARIN (L)
GOULBOURNE (L)
LEE (L)
MAIGRET (L)
SERVICE (L)
SIIEPPARD (E)
SMITH (L)
TEETS (L)
WADE (E)
WILLIAMS (E)
WILSON (L)
A/T IND BRAI'JHAN SALTZMAN B.
HURT PLANS MCDONALD DUBE INFO C. MILES LOCAL PDR Oswe o
N.
Y.'TIE(ABERNATHY)
NSIC(BUCHANAN)
ASLB(YORE/SAYRE/
WOODARD/"H" ST.
CYS ACRS IXIXZCSENT TO 11;6-73 EXTERNAL DISTRIBUTION (i)(2X10)NATIONALLAB'S i-ASLBP(E/W Bldg,Rm.529)
~ i-w. PENNINGT0NS Rm E-201 GT i-CONSULTANT'S LIC, ASSTA NEWMARK/BLUME/AGBABIAN
.DIGGS.
.1-.GERALD ULRIKSON.
ORNL 1-PDR-SAN/LA/NP.u l-GERALD LELLOUCHE BROOKHAVEN NAT. LAB i-AGMED(Ruth Gussman)
RM-B-127, GT.
i-RD MULLER..F-309 GT
<t L~
~
I'l R
~
~
R l l
~
a
~
~I
~ ~
~ RRR. i>RR 4
l il R1 J
~
~ t
~
4
%gofatory'Docket Fife NIAGARAMOHAWKPOWER CORPORATION POCKEIEO U SPEC Li NOV5 1973~
5 REGUlATORY MAIL SECTION DOCK CLERK 6'
NIAGARA ~
MOHAWK 300 ERIE BOULEVARD. WEST SYRACUSE. N. Y. 13202 November 5, ]973 Mr. Donald J. Skovholt Assistant Director for Operating Reactors Directorate of Licensing U. S. Atomic Energy Commission llfashington, D.
C.
20545
Dear Mr. Skovholt:
RE:
Nine Mile Point Unit 1
Docket'No.
SO=220 Your letter of October 26, 1973 requested that detailed heatup calculations be, extended to higher burnups.
Tabulated below are the computer calculated points for the maximum average planar lineal heat generation rates at 2S,OOO MI'ID/T for fuel'tilized in Nine Mile Point Unit 1:
initial Core (Figure 4-9B4)
Reload 1 (Figure 4-9B1)
Reload 2 (Figure 4-9B2)
Reload 3 (Figure 4-9B3) 10.6 kw/ft 10.1 kw/ft 10.1 kw/ft 10.3 kw/ft As these data are the same as shown on Figures 4-9B1 to 4-9B4 in NEDN-10735, Supplements 6,
7 and 8, no xevision is required to the "II" curves at extended exposures.
Very truly yours, R.. Schneider, Vice President-Electric Operations
V 4
f I
1 P
i II
'I i
r