ML17037C244

From kanterella
Jump to navigation Jump to search
Letter Reporting the Results of the Monthly Bergen-Paterson Snubber Inspection and Proposing That Positive Reports Only Be Written
ML17037C244
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/06/1974
From: Schneider R
Niagara Mohawk Power Corp
To: Skovholt D
US Atomic Energy Commission (AEC)
References
Download: ML17037C244 (4)


Text

AEC DI BUTION FOR PART 50 DOCKET MA CL (TEMPORAR'L FORM) CONTROL,NO: 2085 FROM: DATE OF DOC DATE REC'D MEMO OTHER Niagara Mohawk Power Corporation Syracuse, N. Y.

R R Schneider 3-6-74 3-13-74 TO 0 ORIG CC OTHER

  • SENT LOCAL PDR XXX Donald J. Skovholt 1 si ned 39 CLASS UNCLASS PROP INFO INPUT NO S REC'D DOCKET NO:

40 50-220 DESCRIPTION: 'NCLOSURES:

Ltr furn infr re periodic inspection of snubbers at the Nine Mile Point Station Unit <E1

'IA.CKNOWLEDGEO

,QONQ'l Ichiii,QVz NINE MILE POINT UNIT jg.

FOR ACTION/INFORMATION BUTLER (L) SCHWENCER(L) ZIEMANN(L) REGAN(E)

W/ Copies W/ Copies W/ 5 Copies W/ Copies CLARK(L) STOLZ (L) DICKER(E)

W/ Copies W/ Copies W/ Copies W/ Copies GOLLER(L) VASSALLO(L) KNIGHTON(E) "

Copies

'/

W/ Copies Copies W/ Copies W/

KNIEL(L) SCHEMEL(L) YOUNGBLOOD(E)

W/ Copies W/ Copies W/ Copies W/ Copies INTERNAL DISTRIBUTION REG FIL iTECH REVIEW DENTON A/T IND AE~DR ~ HENDRIE GRIMES LIC ASST . BRAI'IMAN OGC, ROOM P-506A CHROEDER GAMMILL DIGGS (L) SALTZMAN MUNTZING/STAFF MACCARY KASTNER GEARIN (L) B, HURT ASE KNIGHT BALLARD GOULBOURNE (L) PLANS GIAMBUSSO PAWLICKI SPANGLER LEE (L) VMCDONALD BOYD SHAO MAIGRET (L) DUBF w/Input MOORE (L) (BWR) S TELLO ENVIRO SERVICE (L)

DEYOUNG (L) (PWR) HOUSTON MULLER SHEPPARD (E) INFO SKOVHOLT (L) NOVAK DICKER SMITH (L) C. MILES P, COLLINS ROSS KNIGHTON TEETS (L) B. KING DENISE IPPOLITO YOUNGBLOOD WADE (E)

REG OPR TEDESCO REGAN WILLIAMS (E)

J FILE 6 REGION(3) LONG PROJECT LDR WILSON (L)

MORRIS LAINAS S, REED (L)

STEELE BENAROYA HARLESS VOLTE R EXTERNAL DISTRIBUTION

~41 - LOCAL PDR OSWEGO NY

- DTIE(ABERNATHY) (I) (2)(10)-NATIONAL LAB' 1-PDR-SAN/LA/NY

- NSIC(BUCHANAN) I-ASLBP(E/N Bldg,gm 529) 1-GERALD LELLOUCHE 1 - ASLB(YORE/SAYRE/ ~ 1-W. PENNINGTON', Rm E-201 GT BROOKHAVEN NAT. LAB WOODARD/11H11 S T 1"CONSULTANT'S '"AGMED(Ruth Gussman)

J16 CYS ACRS 4CRHWi@e NEWMARK/BLUME/AGBABIAN IlM-B-127, GT.

.. Sent to Lic Asst Diggs 3-13-7 1-GERALD ULRIKSON...ORNL , 1-RD..MULLER..F-309 GT

I I' 4 0 I

R'STYulatoI'p File Ggs NIAGARA MOHAWK POWER CORPORATION

~)tlIIIII, NIAGARA <<~ MOHAWK 300 ERIE BOUI EVARD WEST SYRACUSE, N.Y, I3202 Hgg/(p March 6, 1974 Ug~ @g~ 2

~ptjfj'%r

.i~(@

Mr. Donald J. Skovholt Assistant Director for Reactor Operations Division of Reactor Licensing United States Atomic Energy Commission N~R~li .874 washington, D. C. 20545 Ops'LA1OO<

gs<<go@os Re: Provisional Operating License: DPR-17 oooo <+""

Docket No.: 50-220 Ot

Dear Mr. Skovholt:

This letter is to report the results of the monthly Bergen-Paterson snubber inspection at Nine Mile Point Nuclear Station Unit Hl as previously committed All snubbers were found to be satisfactory with no leakage detected. Inasmuch as several months of inspections have shown no problem with the snubber it is proposed that positive reports only be written. If any problem develops in the inspection of the snubbers, a report would be written within 10 days; however, written.

if all snubbers appear satisfactory no report would be Of course, the inspection for each individual snubber would be maintained and the agreed upon inspection frequency continued.

If this proposal is satisfactory to you, please let me know at your earliest convenience.

Very truly yours, R. R. Schneider Vice President - Electric Operations TJD:cm Ltr. Dec. 5, 1973 Schneider - Skovholt REGISTERED MAIL RETURN RECEIPT REQUEST h

0 'c l

g) g I'%,p ri l1 g~ 'A