ML17037C244

From kanterella
Jump to navigation Jump to search
Letter Reporting the Results of the Monthly Bergen-Paterson Snubber Inspection and Proposing That Positive Reports Only Be Written
ML17037C244
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/06/1974
From: Schneider R
Niagara Mohawk Power Corp
To: Skovholt D
US Atomic Energy Commission (AEC)
References
Download: ML17037C244 (4)


Text

AEC DI BUTION FOR PART 50 DOCKET MA CL (TEMPORAR'L FORM)

CONTROL,NO:

2085 FROM:

DATE OF DOC DATE REC'D MEMO OTHER TO 0 Donald J. Skovholt PROP INFO CLASS UNCLASS Niagara Mohawk Power Corporation

Syracuse, N. Y.

R R

Schneider 3-6-74 ORIG 1 si ned INPUT 3-13-74 OTHER CC 39 NO S REC'D SENT LOCAL PDR XXX DOCKET NO:

DESCRIPTION:

Ltr furn infr re periodic inspection of snubbers at the Nine Mile Point Station Unit <E1 40

'NCLOSURES:

50-220 NINE MILE POINT UNIT jg.

'IA.CKNOWLEDGEO

,QONQ'l Ichiii,QVz FOR ACTION/INFORMATION BUTLER(L)

W/

Copies CLARK(L)

W/

Copies GOLLER(L)

W/

Copies KNIEL(L)

W/

Copies SCHWENCER(L)

W/

Copies STOLZ (L)

W/

Copies VASSALLO(L)

'/

Copies SCHEMEL(L)

W/

Copies ZIEMANN(L)

W/ 5 Copies DICKER(E)

W/

Copies KNIGHTON(E) "

W/

Copies YOUNGBLOOD(E)

W/

Copies INTERNAL DISTRIBUTION REGAN(E)

W/

Copies W/

Copies W/

Copies W/

Copies REG FIL AE~DR

OGC, ROOM P-506A MUNTZING/STAFF ASE GIAMBUSSO BOYD MOORE (L) (BWR)

DEYOUNG(L) (PWR)

SKOVHOLT (L)

P, COLLINS DENISE J

REG OPR FILE 6 REGION(3)

MORRIS STEELE iTECH REVIEW

~ HENDRIE CHROEDER MACCARY KNIGHT PAWLICKI SHAO S TELLO HOUSTON NOVAK ROSS IPPOLITO TEDESCO LONG LAINAS BENAROYA VOLTE R DENTON GRIMES GAMMILL KASTNER BALLARD SPANGLER ENVIRO MULLER DICKER KNIGHTON YOUNGBLOOD REGAN PROJECT LDR HARLESS LIC ASST DIGGS (L)

GEARIN (L)

GOULBOURNE (L)

LEE (L)

MAIGRET (L)

SERVICE (L)

SHEPPARD (E)

SMITH (L)

TEETS (L)

WADE (E)

WILLIAMS (E)

WILSON (L)

S, REED (L)

A/T IND

. BRAI'IMAN SALTZMAN B,

HURT PLANS VMCDONALD DUBF w/Input INFO C. MILES B. KING

~41 1

J16

- LOCAL PDR OSWEGO NY

- DTIE(ABERNATHY)

- NSIC(BUCHANAN)

- ASLB(YORE/SAYRE/

WOODARD/11H11 S T CYS ACRS 4CRHWi@e

.. Sent to Lic Asst Diggs 3-13-7 EXTERNAL DISTRIBUTION (I)(2)(10)-NATIONAL LAB' I-ASLBP(E/N Bldg,gm 529)

~ 1-W.

PENNINGTON',

Rm E-201 GT 1"CONSULTANT'S NEWMARK/BLUME/AGBABIAN 1-GERALD ULRIKSON...ORNL 1-PDR-SAN/LA/NY 1-GERALD LELLOUCHE BROOKHAVEN NAT. LAB

'"AGMED(Ruth Gussman)

IlM-B-127, GT.

, 1-RD..MULLER..F-309 GT

I I'

4 0

I

R'STYulatoI'p File Ggs NIAGARA MOHAWK POWER CORPORATION

~)tlIIIII, NIAGARA <<~

MOHAWK 300 ERIE BOUI EVARD WEST SYRACUSE, N.Y, I3202 March 6, 1974 Hgg/(p Ug~

@g~

2

~ptjfj'%r

.i~(@

Mr. Donald J. Skovholt Assistant Director for Reactor Operations Division of Reactor Licensing United States Atomic Energy Commission washington, D. C.

20545 Re:

Provisional Operating License:

DPR-17 Docket No.:

50-220

Dear Mr. Skovholt:

N~R~li.874 Ops'LA1OO<

gs<<go@os oooo <+""

Ot This letter is to report the results of the monthly Bergen-Paterson snubber inspection at Nine Mile Point Nuclear Station Unit Hl as previously committed All snubbers were found to be satisfactory with no leakage detected.

Inasmuch as several months of inspections have shown no problem with the snubber it is proposed that positive reports only be written. If any problem develops in the inspection of the snubbers, a report would be written within 10 days; however, if all snubbers appear satisfactory no report would be written.

Of course, the inspection for each individual snubber would be maintained and the agreed upon inspection frequency continued.

If this proposal is satisfactory to you, please let me know at your earliest convenience.

Very truly yours, R.

R. Schneider Vice President

- Electric Operations TJD:cm Ltr. Dec. 5, 1973 Schneider

- Skovholt REGISTERED MAIL RETURN RECEIPT REQUEST h

0

'c l

g) g I'%,p ri l1 g ~

'A