ML17037C228

From kanterella
Jump to navigation Jump to search
Letter Furnishing Information Schedule for Inspection of the Accessible Bergen-Paterson Snubbers
ML17037C228
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/05/1973
From: Schneider R
Niagara Mohawk Power Corp
To: Skovholt D
US Atomic Energy Commission (AEC)
References
Download: ML17037C228 (8)


Text

,AEC D~IBUTION FOR PART 50 DOCKET MA .IAL (TEHPORARY FORM) CONTROL NO:

PZLE. (IS>

'PROM: DATE OF DOC DATE REC'D LTR MEMO OTHER Niagara Mohawk Power'Corporation Syracuse, N. Y. 13202 Rudolph R Schneider 12-5-73 12<<10-73 TO 0 ORIG CC OTHER SENT AEC PDR X SENT LOCAL PDR

.Mr. Skovgolt 1 signed CLASS UNCLASS PROP INFO INPUT NO S REC'D DOCKET NO'0-220 DESCRIPTION: ENCLOSURES:

Ltr re our 10-1-73 ltr....furnishing info re schedule for,ainspection of the accessible Bergen-Paterson snubbers. ~ ~ ~ ~ .W/Encl 1, denoti the serial number of the snubbers.

PLANT NAME: Nine Mile Point Unit 7k 1 FOR ACTION/INFORMATION 12-10-73 BUTLER(L) SCHWENCER(L) ~ZIEMANN(L) REGAN (E)

W/ Copies W/ Copies W/5 Copies W/ Copies

'LARK(L) STOLZ(L) DICKER(E)

W/ Copies W/ Copies W/ Copies W/ Copies GOLLER(L) VASSALLO(L) '/

KNIGHTON(E) "

W/ Copies Copies W/ Copies W/ Copies KNIEL(L) SCHEMEL(L) YOUNGBLOOD(E)

W/ Copies W/ Copies W/ Copies W/ Copies INTERNAL DISTRIBUTION REG FIL TECH REVIEW DEN TON A/T IND

~C PDR OGC, ROOti P-506A HENDRIE SCHROEDER GRIMES GAMMILL LIC ASST HIGGS (L)

BRAI3MAN SALTZMAN MUNTZING/STAFF CASE

~C CARY KNIGHT KASTNER BALLARD GEARIN GOULBOURNE (L)

(L)

B, HURT PLANS

~ GIAMBUSSO PAWLICKI SPANGLER LEE (L)

MCDONALD BOYD SHAO MAIGRET (L) DUBE MOORE (L) (BWR) STELLO ENUIRO SERVICE (L)

DEYOUNG(L) (PWR) HOUSTON MULLER SHEPPARD (E) INFO M SKOVHOLT (L) NOVAK DICKER SMITH (L) C. MILES P. COLLINS ROSS KNIGHTON TEETS (L)

IPPOLITO YOUNGBLOOD WADE (E)

G OPR TEDESCO REGAN WILLIAMS (E)

ILE & REGION(3) LONG PROJECT LDR WILSON (L)

MORRIS LAINAS STEELE BENAROYA HARLESS VOLLMER EXTERNAL DISTRIBUTION LOCAL PDR Oswe o N. Y.

DTIE(ABERNATHY) (1)(2)(10)-NATIONAL LABPS 1-PDR>>SAN/LA/NY NSIC(BUCHANAN) .1-ASLBP(E/W Bldg,Rm 529) 1-GERALD LELLOUCHE ASLB (YORE/SAYRE/ 1-W. PENNINGTONP Bm E<<201 GT BROOKHAVEN NAT. LAB WOODARD/"H" ST, 1-CONSULTANT'S 1-AGMED(Ruth Gussman)

CYS,ACRS 99RXECgc SENT TO LIC ASST, jlEWMARK/BLUME/AGBABIAN. BM-B-127, GT.

'R>> DIGGS, ON 12-.1Q;73-..;,:-.;-'Z-GERALD.ULRIKSON. PRNL, L,' ';;=. 1-.3U) MULLER..F-.309 GT

.A

~ ~ ~

4 ~ 4 + ~ 0 0

B.tDPJ Fih Cj.

/g POCKET EO Ll5%G NIAGARA MOHAWK POWER CORPORATION t,t gg,C10$ 73 ~

NIAGARA . MOHAWK REGULATORY NAIL SEOTlO" N!': ~

tNCNET OLERKI),', a/ SOD ERIE SOVlEVARD WEST S Y RAG U S E> N. Y, I 2202 December 5, 1973 R! tii. II Mr. Donald J. Skovholt Assistant Director for Reactor Operations ECZO 1S73~ Lz Division of Reactor Licensing United States Atomic Energy Commission Washington, D..C. 20545 Re: Provisional Operating License: DPR-17 Docket No.: 50-220

Dear Mr. Skovholt:

This letter references yours of October 1, 1973 in which you requested a scheduled inspection of the accessible Bergen-Paterson snubbers every 30 days. The program you have requested has been'iItIplemented and is being per-formed by the Plant Maintenance Department. Although certain misunderstandings about the frequency of inspection was incurred initially this has been rectified as follows:

1. All Bergen-Paterson snubbers will be inspected once each 30 days.
a. If defects are found they will be reported in accordance with Section 6.3 Technical Specifications.
b. A written report will be furnished within 15 days after the inspection,kf.all i/ snubbers are satisfactory.
2. The inspection will cover:
a. Condition of seals determination - a visual inspection of each hydraulic shock absorber will be performed. Signs of leakage will indicate degradation of the seals.
b. The overall integrity of the shock absorber assembly will be verified by visual inspection.
3. IItritten surveillance procedures will be implemented and a check-off sheet used to record condition of each snubber. These will be filled and available for review.

Enclosure 1 to this report denotes the serial number of the snubbers that will be inspected as well as their location.

8'783

I 1

A~

i

Mr. Donald J. Skovholt December 5, 1973 U.S. Atomic Energy Commission The snubbers have been inspected twice in the 40 days since my October 26, 1973 submittal concerning the Drywell snubber inspections. In both cases no deterioration of seals or other degradation of the assembly was noted. The inspection dates were October 30, 1973 and December 4, 1973.

The next scheduled inspection is on January 2, 1974.

Very truly yours, olp c mei er Vice Pre ident - Electric Operations RRS:cm Enclosure cc: James P. O'Reilly RO:I REGISTERED MAIL RETURN RECEIPT REQUEST

0 IWE

/

ENCLOSURE 1 chal BERGEN-PATERSON "SNUBBERS" SYSTEM MODEL NO. SERIAL NO. LOCATION Emergency Cooling System HSSA - 30 F 84806-3 A 340'team Supply Emergency Cooling System HSSA - 30 F 84806-3 B 340'team Supply Emergency Cooling System HSSA - 30 F 84806-3 C 340'team Supply Emergency Cooling System HSSA - 30 F 84806-3 D 340'team Supply Emergency Cooling System HSSA - 30 F 84806-3 E 340'team Supply Emergency Cooling System HSSA - 30 F 84806-3 F 340'team Supply Emergency Cooling System HSSA - 30 F 84806-3 G 340'team Supply Emergency Cooling System HSSA - 30 F 84806-3 H 340'team Supply Emergency Cooling System HSSA - 30 F 84806-3 I 336'team Supply Emergency Cooling System HSSA - 30 F 84806-3 J 336'team Supply

'~+ v~

E

-~ e