ML17037C225
| ML17037C225 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 01/18/1974 |
| From: | Raymond P Niagara Mohawk Power Corp |
| To: | Ziemann D US Atomic Energy Commission (AEC) |
| References | |
| Download: ML17037C225 (8) | |
Text
AEC DIS.
UTION FOR PART 50 DOCKET MATE (TEMPORARY FORM)
CONTROL NO:
602 PRON:
Niagara Mohawk Power Corp.
- Syracuse, N. Y. 13202 P, D. Raymond 1-18-74 1-21-74 DATE OF DOC DATE REC'D FILE:
CLASS D. L. Ziemann UNCLASS XXXX PROP INFO ORIG 1 signed INPUT CC OTHER NOC S
REC 40 SENT AEC PDR DOCKET NO:
50-220 DESCRIPTXON:
Ltr re our 12-19-73 ltr... ~ ~. ~.....,trans the following:
ENCLOSURES:
Electromatic Relief Valve Actuations PLANT NAtIE:
Nine Mile Point Unit 81 e
M@~ms
(
1 Orig & 39 cys rec'd )
FOR ACTION/INFORMATION 1-21-74 GC BUTLER(L)
M/
Copies CLARK(L)
M/
Copies GOLLER(L)
W/
Copies KHIEL(L)
W/
Copies.
SCHWEHCER(L)
W/
Copies STOLZ (L)
M/
Copies VASSALLO(L)
W/
Copies SCHENEL(L)
W/
Copies V~XEMAHN(L)
W/ 6 Copies DICKER(E)
W/
Copies KNIGHTON(E) "
M/
Copies YOUNGBLOOD(E)
W/
Copies INTERNAL DISTRXBUTIOH REGAN (E)
M/
Copies W/
Copies
'M/
Copies M/
DEYOUHG(L) (PWR)
SKOVHOLT (L)
PE COLLINS DENISE I ~G OPR PXLE & REGXON(S)
W10RRXS (2)
WTEELE TECH REVIEW HENDRIE SCHROEDER
~ACCARY KHXGHT PAWLICKX SHAO
~TELLO HOUSTON NOVAK ROSS XPPOLITO VfRDESCO LONG LAINAS BENAROYA VOLLMER DENTON GRIMES GA".!MILL ESTHER BALLARD SPANGLER ENVXRO MULLER DICKER KNIGHTOH YOUNGBLOOD REGAN PROJECT LDR
~ITTMAN HARLESS LIC ASST DXGGS (L)
GEARXN (L)
GOULBOURNE (L)
LEE (L)
MAIGRET (L)
SERVXCE (L)
SHEPPARD (E)
SMITH (L)
TEETS (L)
MADE (E)
WILLIAMS (E)
WILSON (L)
A/T XND BRAT52(AN SALTZIIAN B.
HURT PLANS MCDONALD DUBE w/Input INFO C, MILES B, KING
~ - LOCAL PDR Oswe o
~1 " DTIE(ABERNATHY)
- HSIC (BUCIIAHAN}
1 - ASLB(YORE/SAYRE/
WOODARD/"H" ST.
Z6 -
CYS ACRS NZMZXERX EXTERNAL DISTRXBUTION N
(1) (2X10)-NATXONAL LAB S X-.ASLBP(E/[t Bldg,Rm 529) 1-M.
PENNXHGTON, Rm E>>201 1-CONSULTANT'S SENT TO LIC ~ ASST'EMMARK/BLUAiE/AGBABIAN 1-21-74 DIGGS 1>>GERALD ULRIKSON...ORNL 1-PDR-SAN/LA/NY 1-GERALD LELLOUCHE GT BROOKHAVEN NAT. LAB 1-AGMED(Ruth Gussman)
~I~M-B-127, GT.
W-RD..MULLER..P-309 GT
~
~
~
~
~ t ~
~ t
~
~
q t t
~ +
~
NIAGARAMOHAWKPOWER CORPORATION ylII~
NIAGARA '+(
MOHAWK 300 ERIE BOULEVARD WEST SYRACUSE, N. Y. 13202 January 18, 1974 Mr. Dennis L. Ziemann Chief, Operating Reactors Branch 2
Directorate of Licensing United States Atomic Energy Commission Washington, D.
C.
20545
Dear Mr. Ziemann:
Re:
Nine Mile Point Unit 1 Docket No. 50-220 Your letter of December 19, 1973 requested information concerning the dynamic effects of relief valve blowdowns in the torus chamber at Nine Mile Point Unit 1.
The attached table gives a summary of all electromatic relief valve actuations.
The information on the table is separated into six-month periods starting with.the initiation of the facility startup tests.
For each occurrence the method, of actuation and the reason for oper-ation is included.
The information on the table also covers the period from the initial startup through. December 1973.
Future relief valve operations will be reported in'the semi-annual operating reports.
A proposed Technical Specification change including a Limiting Condition for Operation and Surveillance Requirements will be submitted by February 19, 1974.
Very truly yours, CVM/sjz Attachment
~l OOCKEIED USAEC Jewel'$~<~
g REGULATORY PAIL SECTION OOCKET OLERK Philip D. Raym~
-Vice President Engineering w$
P t
,l ~
I I*
~ 4 o'A"'~~
Electromatic Relief Valve Actuations Period Valve Number Mode of Actuation Reason for Actuation (1)
Number of,Actuations October 1969 to March 1970 Manual Periodic Test (2) 112 112 113 113 121 121 122 122 123 123 Manual Manual Manual Manual Manual Manual Manual Manual Manual Manual Periodic Periodic Periodic Periodic Periodic Periodic Periodic Periodic Periodic Periodic Test (2)
Test Test (2)
Test Test (2)
Test Test (2)
Test Test (2)
Test 1
1 2
1 1
4
-1 2
2 2
April 1970 to September 1970 NONE October 1970 to March 1971 NONE April 1971 to September 1971.
112 113 121 122 123 Manual Manual Manual Manual Manual Manual Periodic Test Periodic Test Periodic Test Periodic Test Periodic Test Periodic Test 1
1 1
1 (1)
Periodic testing of relief valve automatic actuation is performed at least once during each operating cycle as required by Technical Specification 4.1.5.
Automatic actuation testing includes opening of the pilot valves but no movement of the relief valves themselves.
(2)
Performed during the Station startup test sequence.
e 1
Electromatic Relief Valve Actuations (Continued)
Period October 1971 to March 1972 Valve Number 112 113 121 122 Mode of Actuation Automatic Automatic Automatic Automatic Automatic Reason for Actuation Normal Operation Normal Operation Normal Operation Normal Operation Normal Operation Number of Actuations 3 Pi 1
-3 3
April 1972 to September 1972 112 113 121 122 123 Manual Manual Manual Manual Manual Manual Periodic Test Periodic Test Periodic Test Periodic Test Periodic Test Periodic Test 4
1 1
1 1
October 1972 to-March 1973 113 121 123 Automatic Automatic Automatic Automatic Normal Operation Normal Operation Normal Operation Normal Operation 1
2 1
April 1973 to December 1973 111 112 112 113 121 121 122 122 123 Automatic Manual Automatic Manual Manual Automatic Manual Automatic Manual Manual Normal Operation Periodic Test Normal Operation Periodic Test Periodic Test Normal Operation Periodic Test Normal Operation Periodic Test Periodic Test 1
3 1
2 3
1 3
1 1