Response to Us Atomic Energy Commission Letter Dated April 5, 1974 Regarding Inspection No. 50-220/74-02
ML17037C210
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 05/16/1974
From: Brunner E
US Atomic Energy Commission (AEC)
To: Schneider R
Niagara Mohawk Power Corp
References
IR 197402
Download: ML17037C210 (6)


Text

UNITEO STATES ATOMIC ENERGY COMMISSION OIRECTORATE OF RECUI ATORY OPERATIONS REGION I 631 PARK AVENUE KING OF PRUSSIA, F ENNSYLVANIA 19406 IIS IIIIII>><

Niagara Mohawk Power Corporation License No. DPR-17 Attention: R. R. Schneider Inspection No. 50-220IJ'74-02 Vice President Electric Operations 300 Erie Boulevard Vest Syracuse, New York 13202

Reference:

Your letter dated April 23, 1974'n response to our letter dated April 5, 1974 Gentlemen:

Thank you for informing us of the corrective and preventive documented in response to our corres'pondence.

actions you examined during a subsequent inspection of your licensed These actions will be program.

Your cooperation with us is appreciated.

Sincerely, 4

. Eldon J. Brenner, Chic Operations Branch cc: Mr. P. A. Burt, General Superintendent, Nuclear Generation Mr. T. J. Perkins, Plant Superintendent, Nuclear Generation Mr. C. L. Stuart, Assistant Plant Superintendent bcc:

Chief, FS&EB RO:I Regulatory Reading Room RO:Hq (4) State of New York DL (4) A. Z. Roisman, Counsel for Citizens RO Files Committee for Protection of the DR Central Files Environment OGC RS PDR Local PDR NSIC DTIE CRESS sURIu,IdE z, P lumlee /g CRnht RrIInnI r

N!AGARA MOHAWK POWER CORPORATtON I

NIAGARA ~, MOHAWK 300 ERIE BOULEVARD WEST SYRACUSE. N. Y. 13202 April 23, 1974 Elden J. Brunner Chief Reactor Operation Branch Directorate of Regulator, Operation Region 1 631 Park Avenue King of Prussia, Penn. 19406

Dear h/r. Brunner:

Following a thorough review of your April 5, 1974 letter, regarding Inspe'ction No. 50-220/74-02 at Nine hiile Point Nuclear Station Unit 1, >>e have concluded that there is no information in the report of a proprietary nature.

In response to the two alleged violations the following is submitted:

1. Control for spilled liquid in Naste Disposal Building - The Final Safety Analysis Report in Part III 2.1 (page 111-29) will be changed according to 10CFR50.59, reflecting the as built conditions. The curbs would hinder operation of vehicles and personnel on Elevation 261 and would allow the fluid to spread over a >>'ider area on the upper elevation. This is undesirable.

The designed control for spilled liquid is to allow the fluid to seek a lower level and'thus be accommodated by the sumps, which contain the fluid, and pump directly to storage tanks. It is expected that this request will be submitted by May 1, 1974.

2. Posting of Information to Employees - The information required by, 10CFR '19.11 consists of, in part, the FSAR. This set of station documents is in constant use by not only station employees, but various consultants working at the station. The complete set of documents was located in the Administration Building and had not been properly signed out, As a corrective measure, documents placed in the locations pursuant to 10CFR 19.11 will be labeled with "Not to be removed unless properly signed out". The sign

~

her. Elden J. Brunner U.S..Atomic Energy Commission April 23, 1974 out will be accomplished by placing a removable book tag in the document. lichen the document is removed the tag will be placed in a specially marked container. It is expected that this system will be fully operable by hfay 1, 1974. In addition all documents and/or the shelves upon which they are stored will be marked indicating the particular document. This will aid in quick identification from other filed information stored in the same area. Also the signs. designating the location of posted information will be corrected. This corrective action is.also expected to be completed by h/ay 1, 1974.

Very Truly Yours, Fg -g..'~-

n

&.N. Schneider Vice President - Electric Operations TJD;bar