Letter Responding to the June 24, 1974 Letter Regarding a Proposed Modification Reactor Building Crane
ML17037C179
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/10/1975
From: Rhode G
Niagara Mohawk Power Corp
To: Goller K
Office of Nuclear Reactor Regulation
References
Download: ML17037C179 (12)


Text

- NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)

CONTROL NO: ~

FILE'LASS UNCLASS PROP INFO DESCRIPTION F ROM. Niagara Mohawk Pwr Corp'yracuse, NY.

G K Rhode

~ -

TO:

DL DATE OF DOC 12-10-75 ORIG

. 3 signed, INPUT DATE R EC'D 12-12-7>

CC OTHER NO CYS REC'D 3

ENCLOSURES:

LTR TWX RPT SENTNRC PDR SENT LOCAL PDR DOCKET NO:

50-220 OTHER Ltr re our 6-24-75 ltr...trans'he followin Addi info concerning proposed modification of the reac'tor building crane.............

(40 cys encl rec'd) pl ANT NAMF.

Nine Mile Poiyt Pl FOR ACTION/INFl:RIHATIQN 12-16-75 ehf BUTLER (L)

W/ Copies CLARK {L)

W/ Copies PARR (L)

W/ Copies KNIEL (L)

W/ Copies SCHWENCER (L)

W/ Copies STOLZ {L)

W/ Copies VASSALLO (L)

W/ Copies PURPLE (L)

W/ Copies ZIEMANN(L)

W/ Copies DICKFR {F)

W/ Copies KNIGHTON (E)

W/ Copies

~

YOUNGBLOOD W/ Copies BEGAN (E)

W/ Copies I..EAR (L)

~ W/hCopies SPIES W/ Copies (E)

. LPM W/

opuses REID(L)

W/

COPIES EKEI.LE

+GC, ROOM P-506A

~OSSI CK/STAFF

/CASE G IAM8USSO BOYD MOORE (L)

DEYOUNG (L)

SKOVHOLT (L)

GOLLER (L) (Ltr)

P. COLLINS DENISE BEG OPR

/FILE 5 REGION (2)

MXPC INTERNALDISTRIBUTION TECH REVIEW DENTON LIC ASST SCHROEDER GRIMES R. DlGGS (L)

MACCARY GAMMILL H. GEARIN (I )

KNIGHT KASTNER E.'OULBOUR NE (L)

PAWLICKI BALLARD P. KREUTZER (E)

SHAQ SPANGLER J. LEE (L)

STELLO M. RU3:"lBROOK(L)

HOUSTON ENVIRO

'. REED (E)

NOVAK MULLER M. SERVICE (L)

ROSS DICKER S. SHEPPARD (L)

IPPOLITO KNIGHTON M. SLATER (E)

TEDESCO

. YQUNGBLQOD H. SMITH (L)

Z,COLLINS REGAN

~S. TEETS {L)

LAINAS PROJECT LDR G. WILLIAMS(E)

BENAROYA ~ 8C~cl V. WILSON (L)

VQLLMER Nt +-ESS R. INGR'"4 {L)

H.

DUNCAN EX fErtNALDISTRIBUTION A/T IND

~

B RAITMAN SALTZMAN MELTZ PLANS MCDONALD CHAPMAN

'UBE (Ltr)

E. COUPE PETERSON HART F I E LD (2)

KLECKER EISENHUT WIGGINTON

~1 lOCALPDR~~~g 0 )~ Y i1 TIC (ABERNATHY)

(1)(2)(10) NATIONALLABS g1 NSIC (BUCHANAN),

1 W. PENNINGTON, Rrn E-201 GT 1 ASLB 1

CONSULTANTS

'I Newton Anderson NEWMARK/8LUME/AGBABIAN.

~$ ACRS ~&INQJSENT

~G L ~, ~~c&S 1 P D R-SAN/LA/NY 1 BROOKHAVEN NAT LAB 1 G. ULRIKSON ORNL

P

~

~

~

~

~

~

~

~

~

~

~

~

c

.. - KoijLI-;" ".""..";=IFiLE COPY NIAGARAMOHAWKPOWER CORPORATION aiEIIM NIAGARA ~

MOHAWK 300 ERIE BOULEVARD. WEST SYRACUSE, N. Y. 13202 December 10, 1975

~~sf/(p>-

5g ~~ ~9$ $ ~

I 8 IC pk 4+IEIwgg l7SI

%gal(@'~

Director of Nuclear Reactor Regulation Attn:

Mr. Karl R. Goller Assistant Director for Operating Reactors Directorate of Licensing U. S. Nuclear Regulatory Commission Washington, D.

C.

20555 Re:

Nine Mile Point Unit 1

Docket No. 50-220

Dear Mr. Goller:

Oj 00CREEE0 IIgEIEQ OECl$$7 3

CLEAR RES'.~

~COIAIAIS'SIC IILoII The attached information is provided in response to your June 24, 1974 letter regarding a proposed modification of the Nine Mile Point Unit 1 reactor building crane.

This information was discuss'ed at a September 19, 1975 meeting with your staff.

In addition, the cask drop protection system provides reasonable protection against loss of integrity of the fuel pool'nd against damage to stored spent fuel in the unlikely event a

fuel cask were'to be dropped into the pool.

The modified crane is an operational feature for added safety when handling the spent fuel shipping cask.

Very -truly yours, NIAGARA MOHAWK POWER CORPORATION Gerald K.

ode Vice President -

E eering MGM/sz Attachment

2

,g pk )5Pg

Reactor Building Crane

RESPONSE

TO NRC CONCERNS Back round Our letter of July 26, 1973 described the design of a proposed modifi-cation of the Nine Mile Point Unit 1 reactor building crane to provide a

redundant hoisting system and crane movement controls.

The Commission's letter

'f June 24, 1974 concluded that the modification would be acceptable, provided that:

(1) the trolley and hoist are provided with variable speed controls, and (2) that the rope reeving system, fleet angles and sheave size conform to Paragraph Nos. M.4, M.5 and M.6 of AISE Standard No. 6-1969 for ropes, reeving and sheave sizes.

Subsequently, a meeting was held on September 19, 1975 with the Commission to discuss Niagara Mohawk s response to their concerns.

The following information is a reply to the, June 24, 1975 letter and includes the information presented at the September 19, 1975 meeting.

Variable S eed Controls Both the trolley and hoist are provided with variable speed controls.

The main hoist utilizes a General Electric Max Speed 320 D.C. adjustable voltage controller.

The trolley has a five speed control (drift point plus 4 speeds).

Movement will be controlled by push button.

For both trolley and hoist, the further the button is depressed the faster will be the movement.

Ro e Reevin S stem Fleet An les and Sheave Sizes The rope reeving system, fleet angles and sheave sizes do not fully conform with AISE Standard No. 6-1969, since the equipment was purchased prior to the requirement to meet this standard.

Compliance with Paragraphs Nos. M.4, M.5 and M.6 of the Standard is addressed below.

1.

Para ra h M.4 Ro es) a.

A licable Portions of Standard "When practical, ropes shall be so reaved as to eliminate reverse bends."

Also, "The maximum allowable fleet angle shall be 2-1/2 degrees or approximately 1/2 inch per foot in frequent working positions or up to 3-1/2 degrees in seldom reached positions."

n C

I J

P

\\

b.

Com liance to Standard The system as shown in Figures 3 and 4 of our July 26, 1973 submittal is required to achieve a redundant system.

The frequency of stress reversal is the main cause of rope fatigue.

The crane Hill be used a maximum of 24 times per year to handle the spent fuel cask and once a year to handle the shield plugs and reactor head.

This frequency of use will cause minimal rope fatigue.

Since the rope will be frequently inspected for any detrimental effects caused by fatigue, it is considered worthwhile to have this reeving system to achieve redundancy.

The maximum fleet angle with crane hook at the design high point is 4.81 degrees.

The high point of the hook to handle the heaviest and longest spent fuel cask is approximate-ly three feet lower than design high point.

Limit switches control this high point.

The maximum fleet angle when handling the cask at this high point is 3.5 degrees.

At this elevation, the fleet angle of drum to first sheave would be 2.2 degrees.

The 3.5 and 2.2 degree fleet angles would be approximately the same when removing the reactor shield plugs.

The low point of the hook to handle a spent fuel cask is approximately 15 feet higher than the design low point.

The maximum fleet angle of drum to sheave would be 3.8 degrees.

The drum grooves are machined and have a smooth wearing surface.

2.

Para ra h N.5 E ualizer Bar or Sheaves a.

A licable Portions of Standard "Where required, either an equalizer bar or sheave will be acceptable.

In either case, it shall be so designed as to be accessible from the floor of the trolley and made in such a manner that it can turn or swivel to align itself with the pull of the ropes.

Equalizer sheaves when used shall have a

pitch diameter not less than 18 times the diameter of the rope."

'b.

Com liance to Standard The Nine Nile Point Unit 1 crane has an equalizer bar assembly.

It is accessible from the floor of the trolley. It does not swivel.

The crane will not be used for side pull and the load will have very little swing.

'I

~\\

+v

~

~

r 3.

Para ra h M.6 Sheaves and Hook Blocks) a.

A 1 icabl e Porti ons of Standard "Sheaves shall be provided with anti-friction bearings.

Proper provisions to take care of thrust shall be made.

The sheaves shall be used in standard sizes in accordance with Figure M.6.A."

Also, "The pitch diameter of all sheaves, except equalizer

sheaves, shall not be less than 30 times the diameter of the rope used for 6 x 37 rope.

Use the next larger size (diameter and groove) for lead sheaves.

Sheaves shall be enclosed by guards which fit close to the flanges so as to prevent the ropes from coming out of the grooves."

Also, "Each sheave shall be lubricated by an individual grease line, the fittings to be located so that they will be protected from damage."

b.

Com liance to Standard The upper sheaves have anti-friction bearing and thrust bearings.

The lower sheaves have bronzoid combination sheave bearings and thrust bearings with special lubricant.

The lower block is built this way so that it can be immersed in water.

The lower block has two 33 inch, two 30 inch and four 27 inch diameter sheaves..

The upper sheaves are four 33 inch and two 41 inch diameter sheaves.

The wire rope is l-l/8 inch diameter (6 strand, 37 wire).

1 This crane was designed for a minimum sheave diameter of 24 times rope diameter.

This ratio of sheave to rope diameter will give more than adequate fatigue life for the expected crane service frequency.

Grease fittings are provided for periodic greasing of sheave bearings.

~

The installation and testing for the redundant crane is scheduled for February through April, 1976.

The crane will be inspected, tested and main-tained in accordance with ANSI 830.2.0-1967, Chapter 2-2.

No cask handling activities are currently planned until installation of the redundant hoisting system and crane movement controls are completed.

~

~

In conclusion, the installation of the redundant crane systems and crane

'ovement controls, in conjunction with the cask drop protection system,'rovide an effective system of protection against cask drop accidents.

Although the reactor building crane will not fully comply to AISE Standard No. 6-1969, the proposed redundant rope system as compared to the existing single rope system is superior.