ML17037C178
| ML17037C178 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 12/12/1975 |
| From: | Rhode G Niagara Mohawk Power Corp |
| To: | Lear G Office of Nuclear Reactor Regulation |
| References | |
| NEDC-20989 | |
| Download: ML17037C178 (6) | |
Text
NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPO RAR Y FORM)
~ CONTROL NO:
FILE:
- Syracuse,
.N.Y.
G:K.
Rhode DATE OF DOC DATE R EC'D LTR TWX RPT OTHER
-"-' TO:
G. Lear ORIG l Si ned'C OTHER 0
S SENT LOCALPDR CLASS UNCLASS PROP INFO INPUT NO CYS REC'D DOCKET NO:
DESCRIPTIQNI.tr. notarized 12-12-75... Ltr.:
re their report of 10-1-75.....'etter advising that G.E.
has submitted"unde seperate cover Addendum 8:1 to t'e 50-220.,
'document....i...
(1 Copy Received)
ENC LOSUR ES:
Nine Mile Pt..8
=1 FOR ACTiON INFC:.Rl'RATION BUTLER (L)
W/ Copies CLARK (L)
W/ Copies PARR (L)
W/ Copies KNIEL(L)
W/ Copies SCHWENCER (L)
W/ Copies STOLZ (L)
W/ Copies VASSALLO (L)
W/ Copies PURPLE (L)
W/ Copies ZIEMANN(L)
W/ Copies DICKER (E)
W/ Copies KNIGHTQN (E)
W/ Copies
~
YOUNGBLOOD (E)
W/ Copies REGAN (E)
REXD(L)
W Copies 8/
COPIES AR (L)
W//Copies ~~,
~ ----...
SPXES W/ Copies LPH W/
opuses F ILE TFCH REVIEW C
SCHROEDER
, ROOM P-506A MACCARY OSSI CK/STAFF KNIGHT
~ r~ASE PAWLICKI Gl
- MBUSSO, SHAO YD
~ALLO MOORE (L)
HOUSTON DEYQUNG (L)
~69'403
.. SKOVHOLT. (L)...SS GOLLER (L) (Ltr)
IPPOLITO P. COLLINS MEDESCO
...DENISE.....
J C LLXNS ~
'REG QPR
" -""-.i"=
NAS
~E 5 REGION (2)
BENAROYA
" HEPC'
" OLLMER INTERNAL DISTR IBUTION DENTON GRIMES GAMMILL KASTNER BALLARD SPANGLER LID ASST R. DIGGS ILI H. GEAR IN (L)
E.'QULBQURNE (L)
P. KRFUTZE R (E)
J. L'EE (L)
M.RU3HBROOK{L)
ENVIRO S. REED (F)
MULLER M. SERVICE (L)
QI.CK,ER...
S. SHEPPARD (0 KNIGHTON M. SLATER (E)
~ YOUNG BLOOD H. SMITH (L)
BEGAN
~EETS (L).
PROJECT LDR G. WI4 LIAMS (E}
V. WILSON (L)
H AlyESS R. INGR'~ll {L)
M DUNCAN EXTEitNALDISTRIBUTION C
A/T IND
~
BRAITMAN SA LTZMAN MELTZ Pl ANS MCDONALD CHAPMAN DU9E (Ltr)
~COUPE PETERSON HARTFIELD (2)
KLECKER
'ISENHUT. "
W G INTON v,.Q I(M i'.c~g "'..
cA LOCALPDR~MRgg, N.Y.
~~I IC (ABERNATHY)
(l)(2)('IO) NATIONALLABS NSIC (BUCHANAN) 1 W. PENNINGTON, Rm E-201 GT 1 ASLB CONSULTANTS
'ton Anderson NEWMARK/8LUME/AGBAHIAN..
, ACRS I}(ggOO$/SENT 'o L.A. S. Teets
/
1 PD R-SAN/LA/NY 1 BROOKHAVEN NAT LAB 1 G. ULRIKSON QRNL p
~
< plk
()
tf
~
~
~
'lI ll
~ 4
~ t
~
~
I '
tt
~
~
~RB~~fg g~
0 NIAGARAMOHAWKPOWER CORPORATIO NIAGARA ~
MOHAWK 300 ERIE BOULEVARD. WEST SYRACUSE. N. Y.
$ 3202 December 12, -1975 Director of Nuclear Reactor Regulation Attn:
Mr. George Lear, Chief Branch 83 U. S. Nuclear Regulatory Commission Washington, D.
C.
20555 Re:
Nine Mile Point Unit 1
Docket No. 50-220
Dear Mr. Lear:
Our October 1, 1975 letter referenced a five volume report'ntitled "Hark I Containment Evaluation Short Term Program (NEDC-20989)"
which was submitted by General Electric on October 6, 1975.
As indi-cated in Volume I of the report, work was continuing in the following three areas:
1.
Pool swell impact on expansion bellows 2.
Pool swell impact on relief valve discharge lines 3.
Uplift force on torus support columns This letter is to advise you that General Electric has submitted under separate cover Addendum No.
1 to.the above-mentioned document.
This Addendum covers items 1
and 2 above.
Item 3, concerning support columns, is an area where additional work is still underway.
General Electric is in the process of performing additional tests on a 1/12th scale model segment to obtain data for identifying net downward and upward torus loads.
This will also provide confirmation of pool swell velocity with the effect of pressure over the pool surface considered.
The retests are necessary since the results of the or iginal tests were inconclusive due to insufficient and questionable data.
The results of the evaluation will be provided in Addendum No.
2 to NEDC-20989.
.....See Page 2
4 1 ~
The information included in the General Electric report demon-strates that continued operation of Nine Mile Point Unit 1 during implementation of the long term program does not present an undue safety hazard to the public.
Very truly yours, NIAGARA MOHAWK POWER CORPORATION Gerald Rhode Vice President ngineering STATE OF NEW YORK
)
COUNTY OF ONONDAGA GERALD K.
RHODE, being duly sworn; says:
I am Vice President, Engineering, of Niagara Mohawk Power Corporation.
I have read the foregoing letter and the facts contained in the letter and in the referenced documents are true to the best of my knowledge, information, and belief.
GERALD.K RHODE Sworn to before me on December Qg
, 1975.
Notary Public PATRICIA A.. CONHOR
~
SIoto ol Now Yorl Ho 4d082dd Idy Commbs'ion Expiiop ldaroh 30, l
4; g~
if