o NRC DISTR(%PI ION FOR PART 50 DOCKET MA1 IAL (TEMPORARY FORM) o o:~o'ILE FRQM; Naigara Mohawk Pwr Corp,
DL ORIG one signed 2 CC OTHER XKg SENT PDR NRC SENT LOCAI PDR CLASS
/
UNCLASS PROP INFO INPUT NO CYS REC'D 1
DOCKET NO:"
50-220
/ DESCR IPTION Ltr re their 10-1-75 ltr.....furnishing addi info concerning Mark I containment..short term program.......
ENCLOSURES
>"KNOWLPZC'gD PLANT NAME:
Nine Mile Point /Pl god jggqP(0 OR ACTION/INFC'-RMATION 1-6-76 ehf BUTLER (L)
W/ Copies CLARK (L)
W/ Copies PAnn (L)
\\V/ Copies KNIEL (L)
W/ Copies SCHWENCER (L)
\\V/ Copies STOLZ (L)
W/ Copies VASSALLQ (L)
W/ Copies PURPLE (L)
W/ Copies ZIEMANN(L)
W/ Copies DICKER (E)
W/ Copies KNIGIITON (E)
W/ Copies
~
YOUNGBLOOD W/ Copies REGAN (E)
W/ Copies LEAR (L)
~ W/copies Sl.ii;S W/ Copies (E)
LPM W/
opies RF.ID (L)
W/
COPrHS DR
/QG C, R QQ M P-506A yGOSSI CK/STAF F CASE BOYD MOORE (L)
D EYOUNG (L)
SKOVHOLT (L)
GOLLER (L) (Ltr)
P. COLLINS DENISE REG OPR I
+FILE 5 REGION (2)
MXPC TECH REVIEW SCHROEDER MACCARY KNIGHT PAWLICKI SHAO STELLO
~HOUSTON
~NOVAKCD)
ROSS
+IPPQ LITO
~TEDESCO S,COLLTNS
~AINAS BENAROYA VOLLMER INTERNALDISTRIBUTION A/T IND
~
BRAITMAN SALTZMAN (L)
ME LTZ PLANS MCDONALD CHAPMAN DUBE (Ltr)
E. COUPE PETERSON HARTFIELD (2)
KLECKER EISENHUT WIGGINTON K, PARRlSH" L DENTON LIC ASST GRIMES R. DIGGS (L)
GAMMILL H. GEARIN (L)
KASTNER F. GOULBQURNE BALLARD P. KRFUTZER (E)
SPANGLER J. LEE (L)
M.RU3HBROOK{L)
E NVIRO S. REED (E)
MULLER M. SERVICE (L)
DICKER S. SHEPPARD (L)
KNIGHTON M. SLATER (E)
YOUNGBLOOD
~ H. SMITH (L)
REGAN
>. TEETS (L)
PROJECT LDR ~G. WILLIAMS(E)
V. WILSON (L)
NAO..ESS R. INGR '"5 (L)
M.
DU INCAN EX I trtNALDISTRIBUTION
~1 LOCAl PDR gP
~1 TIC (ABERNATHY (1)(2)(10) NATIONALLABS
+1 NSIC (BUCHANAN) 1 W. PENNINGTON, Rm E-201 GT 1 ASLB 1
CONSULTAN1'S 1 Newton Anderson NEWMARK/BLUiVIE/AGBABIAN.,
gL, ACRS kCrt13tht6/SENT
'~c Lh~~~
1 P DR-SAN/LA/NY 1 BROOKHAVEN NAT LAB 1 G. ULRIKSQN ORNL
~
~
0 A
~
~
~
~
~
NIAGARAMOHAWKPOWER CORPORATION NIAGARA i MOHAWK 300 ERIE BOULEVARD WEST SYRACUSE, N. Y. I3202
<zjppp@
December 24, l975 Director of Nuclear Reactor Regulation Attn:
Mr. George Lear, Chief Branch ¹3 U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Re:
Nine Mile Point Unit l Docket No. 50-220 BOCK<'+
USIIIIO}
Dear Mr. Lear:
In our letter of October l, l975, the Hark I Containment
~I p Short Term Program was described.
Part of that program was a reevaluation of the torus support columns.
As discussed in our letter of December l2, l975, further testing is required in this area.
An evaluation is now underway which should make, that infor-mation available, for review with the Commission, by, January 22, l976.
A second addendum to the "Mark I Containment Evaluation Short Term Program (NEDC-20989)" is planned for March, l976.
The major thrust of this evaluation concerns uplift loads on the torus.
Significant technical basis exists for the prediction of a substantial reduction of these loads.
This is discussed in a December l8, l975 letter, submitted on behalf of the Hark I utilities, from Mr. I. F. Stuart (General Electric) to Mr. R. S.
Boyd (Nuclear Regulatory Commission).
Upon review, we have determined that this information is applicable to Nine Hile Point Unit l.
Considering the very low probability of a Loss-of-Coolant Accident at our plant during completion of the Short Term Program, and the excellent prospect for a substantial reduction of loads as, a result of the evaluation, we have concluded that Nine Mile Point Unit l can continue operation without danger to the public health and safety while evaluation of the torus support columns continues.
Very truly yours, NIAGARA MOttAWK POWER CORPORATION Rudolph
. Schnei der Vice president Electric Operations gg,3'P>g
/sz
E r
>! =
II
STATE OF NEAT YORK
)
COUNTY OF ONONDAGA )
RUDOLPH R.
SCHNEIDER, being duly sworn, says:
I am Vice President, Electric Operations, of Niagara Mohawk Power Corporation. I have read the foregoing letter, and the facts contained in the letter and in the referenced documents are true to the best of my knowledge, information, and belief.
UDOLPH R.
SCHNEIDER Sworn to before me'n December 4 /'~, 1975.
Notary Public PATRICIA A. CONDOR
~tory 9ubtfc In tho Staro ot trow York Quatrfiod ln Onondaga Co. No. 160II2dd My Cornrutraton &triter March 30, 19 $ f
h