|
---|
Category:Letter
MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01
[Table view] Category:Press Release
MONTHYEARML22153A1262022-05-26026 May 2022 News Release-I-22-007: NRC Schedules Webinar to Discuss 2021 Safety Performance at Maryland, New Jersey, New York, Pennsylvania Nuclear Power Plants Press Release-I-21-005, NRC Schedules Webinar to Discuss 2020 Safety Performance at Maryland, New Jersey, New York and Pennsylvania Nuclear Power Plants2021-06-0101 June 2021 Press Release-I-21-005: NRC Schedules Webinar to Discuss 2020 Safety Performance at Maryland, New Jersey, New York and Pennsylvania Nuclear Power Plants Press Release-I-21-011, NRC Names New Resident Inspector for Nine Mile Point Nuclear Plant2020-12-28028 December 2020 Press Release-I-21-011: NRC Names New Resident Inspector for Nine Mile Point Nuclear Plant Press Release-I-20-012, NRC to Hold Virtual Meeting to Discuss 2019 Performance of FitzPatrick, Nine Mile Point and Ginna Nuclear Power Plants2020-06-15015 June 2020 Press Release-I-20-012: NRC to Hold Virtual Meeting to Discuss 2019 Performance of FitzPatrick, Nine Mile Point and Ginna Nuclear Power Plants Press Release-I-19-027, NRC Assigns New Senior Resident Inspector at Nine Mile Point2019-10-30030 October 2019 Press Release-I-19-027: NRC Assigns New Senior Resident Inspector at Nine Mile Point Press Release-I-19-024, NRC to Hold Public Open House to Discuss 2018 Performance of Nine Mile Point/Fitzpatrick Nuclear Power Plants2019-09-26026 September 2019 Press Release-I-19-024: NRC to Hold Public Open House to Discuss 2018 Performance of Nine Mile Point/Fitzpatrick Nuclear Power Plants Press Release-I-18-020, NRC to Hold Open House to Discuss 2017 Performance of Nine Mile Point and FitzPatrick Nuclear Power Plants2018-08-0909 August 2018 Press Release-I-18-020: NRC to Hold Open House to Discuss 2017 Performance of Nine Mile Point and FitzPatrick Nuclear Power Plants Press Release-I-18-017, NRC Names New Resident Inspector at Nine Mile Point Nuclear Power Plant2018-07-0505 July 2018 Press Release-I-18-017: NRC Names New Resident Inspector at Nine Mile Point Nuclear Power Plant Press Release-I-18-001, New NRC Inspector Named at Nine Mile Point Nuclear Plant2018-01-16016 January 2018 Press Release-I-18-001: New NRC Inspector Named at Nine Mile Point Nuclear Plant Press Release-I-17-029, NRC Names New Senior Resident Inspector at Nine Mile Point Nuclear Plant2017-08-11011 August 2017 Press Release-I-17-029: NRC Names New Senior Resident Inspector at Nine Mile Point Nuclear Plant Press Release-I-17-011, NRC to Hold Open House on 2016 Performance of Nine Mile Point, FitzPatrick Nuclear Power Plants2017-04-13013 April 2017 Press Release-I-17-011: NRC to Hold Open House on 2016 Performance of Nine Mile Point, FitzPatrick Nuclear Power Plants Press Release-I-16-013, NRC to Discuss Nine Mile Point Nuclear Plant Annual Assessment in Conjunction with May 18 Oswego, N.Y., Chamber of Commerce Meeting2016-05-10010 May 2016 Press Release-I-16-013: NRC to Discuss Nine Mile Point Nuclear Plant Annual Assessment in Conjunction with May 18 Oswego, N.Y., Chamber of Commerce Meeting Press Release-16-001, NRC Grants Weapons Pre-Emption Authority to Nuclear Facilities in Two States2016-01-0606 January 2016 Press Release-16-001: NRC Grants Weapons Pre-Emption Authority to Nuclear Facilities in Two States Press Release-I-15-020, NRC to Conduct Open House April 28 in Oswego, N.Y., to Discuss 2014 Performance of Nine Mile Point Nuclear Power Plant2015-04-22022 April 2015 Press Release-I-15-020: NRC to Conduct Open House April 28 in Oswego, N.Y., to Discuss 2014 Performance of Nine Mile Point Nuclear Power Plant Press Release-I-14-030, NRC Assigns New Resident Inspector to Nine Mile Point Nuclear Plant2014-06-27027 June 2014 Press Release-I-14-030: NRC Assigns New Resident Inspector to Nine Mile Point Nuclear Plant Press Release-14-024, NRC Approves Transfer of Five Nuclear Power Reactor Operating Licenses from Constellation to Exelon2014-04-0101 April 2014 Press Release-14-024: NRC Approves Transfer of Five Nuclear Power Reactor Operating Licenses from Constellation to Exelon Press Release-I-14-007, NRC Sets Open House for March 18 to Discuss Performance of Nine Mile Point, Fitzpatrick Nuclear Power Plants2014-03-10010 March 2014 Press Release-I-14-007: NRC Sets Open House for March 18 to Discuss Performance of Nine Mile Point, Fitzpatrick Nuclear Power Plants Press Release-I-13-036, NRC to Hold Regulatory Conference with Constellation Regarding Apparent Violation at Nine Mile Point 1 Nuclear Plant2013-10-22022 October 2013 Press Release-I-13-036: NRC to Hold Regulatory Conference with Constellation Regarding Apparent Violation at Nine Mile Point 1 Nuclear Plant Press Release-13-073, NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants2013-09-0606 September 2013 Press Release-13-073: NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants Press Release-I-13-027, NRC Staff to Meet with Constellation on Aug. 5 in Baltimore to Discuss Performance of Company'S Nuclear Plant Fleet2013-07-29029 July 2013 Press Release-I-13-027: NRC Staff to Meet with Constellation on Aug. 5 in Baltimore to Discuss Performance of Company'S Nuclear Plant Fleet Press Release-13-047, NRC Issues Order Designating 10 Facilities Eligible for Weapons Pre-Emption Authority2013-06-0505 June 2013 Press Release-13-047: NRC Issues Order Designating 10 Facilities Eligible for Weapons Pre-Emption Authority Press Release-I-13-008, NRC Open House April 3 in Scriba, N.Y., to Discuss Performance of Nine Mile Point, Fitzpatrick Nuclear Power Plants2013-03-25025 March 2013 Press Release-I-13-008: NRC Open House April 3 in Scriba, N.Y., to Discuss Performance of Nine Mile Point, Fitzpatrick Nuclear Power Plants Press Release-I-13-004, Nine Mile Point 1, FitzPatrick Nuclear Power Plants to Receive Additional NRC Oversight2013-02-19019 February 2013 Press Release-I-13-004: Nine Mile Point 1, FitzPatrick Nuclear Power Plants to Receive Additional NRC Oversight Press Release-I-12-043, NRC Maintains Heightened Watch Over Nuclear Plants Impacted by Sandy; Three Reactors Experienced Shutdowns During Storm; Oyster Creek Plant Remains in Alert2012-10-30030 October 2012 Press Release-I-12-043: NRC Maintains Heightened Watch Over Nuclear Plants Impacted by Sandy; Three Reactors Experienced Shutdowns During Storm; Oyster Creek Plant Remains in Alert Press Release-I-12-037, NRC Assigns New Inspector to Nine Mile Point Nuclear Plant2012-09-18018 September 2012 Press Release-I-12-037: NRC Assigns New Inspector to Nine Mile Point Nuclear Plant Press Release-I-12-035, NRC Staff to Meet with Constellation on Sept. 19 in Baltimore to Discuss Performance of Company'S Nuclear Plant Fleet2012-09-11011 September 2012 Press Release-I-12-035: NRC Staff to Meet with Constellation on Sept. 19 in Baltimore to Discuss Performance of Company'S Nuclear Plant Fleet Press Release-I-12-007, NRC to Hold Open House on March 22 in Scriba, N.Y., to Discuss Annual Assessment of Nine Mile Point, FitzPatrick Nuclear Plants2012-03-16016 March 2012 Press Release-I-12-007: NRC to Hold Open House on March 22 in Scriba, N.Y., to Discuss Annual Assessment of Nine Mile Point, FitzPatrick Nuclear Plants Press Release-12-016, NRC Approves Exelon-Constellation Merger, Indirect Transfer of Five Nuclear Power Plant Licenses2012-02-16016 February 2012 Press Release-12-016: NRC Approves Exelon-Constellation Merger, Indirect Transfer of Five Nuclear Power Plant Licenses Press Release-11-227, NRC Approves Increased Power Output for Nine Mile Point Nuclear Power Plant2011-12-23023 December 2011 Press Release-11-227: NRC Approves Increased Power Output for Nine Mile Point Nuclear Power Plant Press Release-11-201, NRC Advisory Committee on Reactor Safeguards to Meet Nov. 3-5 in Rockville, MD2011-10-18018 October 2011 Press Release-11-201: NRC Advisory Committee on Reactor Safeguards to Meet Nov. 3-5 in Rockville, MD Press Release-I-11-026, NRC, Ceng Managers to Discuss Company'S; Fleet of Nuclear Plants at Public Meeting on July 262011-07-20020 July 2011 Press Release-I-11-026: NRC, Ceng Managers to Discuss Company'S; Fleet of Nuclear Plants at Public Meeting on July 26 Press Release-I-11-007, NRC to Hold Public Meeting on May 4th in Scriba, N.Y., to Discuss Annual Assessment of Nine Mile Point, Fitzpatrick Nuclear Plants2011-04-22022 April 2011 Press Release-I-11-007: NRC to Hold Public Meeting on May 4th in Scriba, N.Y., to Discuss Annual Assessment of Nine Mile Point, Fitzpatrick Nuclear Plants Press Release-I-10-033, NRC Names New Senior Resident Inspector at Nine Mile Point Nuclear Plant2010-07-28028 July 2010 Press Release-I-10-033: NRC Names New Senior Resident Inspector at Nine Mile Point Nuclear Plant Press Release-I-10-008, NRC to Hold Open House on March 25 in Oswego, N.Y. to Discuss 2009 Assessment of Nine Mile Point, Fitzpatrick Nuclear Plant2010-03-22022 March 2010 Press Release-I-10-008: NRC to Hold Open House on March 25 in Oswego, N.Y. to Discuss 2009 Assessment of Nine Mile Point, Fitzpatrick Nuclear Plant Press Release-I-10-002, NRC Staff to Meet with Constellation on Jan. 19 in Baltimore to Discuss Performance of Companys Nuclear Plant Fleet2010-01-13013 January 2010 Press Release-I-10-002: NRC Staff to Meet with Constellation on Jan. 19 in Baltimore to Discuss Performance of Companys Nuclear Plant Fleet Press Release-09-171, NRC Approves License Transfers for Constellation/Edf Nuclear Joint Venture2009-10-0909 October 2009 Press Release-09-171: NRC Approves License Transfers for Constellation/Edf Nuclear Joint Venture Press Release-I-09-038, NRC, Constellation Energy to Discuss Dry Cask Storage at Company'S Nuclear Power Plants on Sept. 152009-09-10010 September 2009 Press Release-I-09-038: NRC, Constellation Energy to Discuss Dry Cask Storage at Company'S Nuclear Power Plants on Sept. 15 Press Release-09-089, NRC Meetings June 10 in Oswego, N.Y., to Discuss Environmental Review for Nine Mile Point New Reactor Application2009-05-21021 May 2009 Press Release-09-089: NRC Meetings June 10 in Oswego, N.Y., to Discuss Environmental Review for Nine Mile Point New Reactor Application Press Release-I-09-023, NRC to Conduct Open House on April 30 Regarding Annual Assessment of Performance for Nine Mile Point and FitzPatrick Nuclear Power Plants2009-04-23023 April 2009 Press Release-I-09-023: NRC to Conduct Open House on April 30 Regarding Annual Assessment of Performance for Nine Mile Point and FitzPatrick Nuclear Power Plants Press Release-II-09-016, NRC to Discuss 2008 Performance of North Anna Nuclear Power Plant2009-03-25025 March 2009 Press Release-II-09-016: NRC to Discuss 2008 Performance of North Anna Nuclear Power Plant Press Release-09-042, NRC Issues Annual Assessments for Nations Nuclear Plants2009-03-0606 March 2009 Press Release-09-042: NRC Issues Annual Assessments for Nations Nuclear Plants Press Release-09-027, NRC Reschedules Review on New Reactor Application for Nine Mile Point, Cancels Feb. 25 Meeting2009-02-13013 February 2009 Press Release-09-027: NRC Reschedules Review on New Reactor Application for Nine Mile Point, Cancels Feb. 25 Meeting Press Release-09-021, NRC Meeting Feb. 25 in Oswego, N.Y., on Environmental Issues for Nine Mile Point New Reactor Application2009-02-0202 February 2009 Press Release-09-021: NRC Meeting Feb. 25 in Oswego, N.Y., on Environmental Issues for Nine Mile Point New Reactor Application Press Release-08-224, NRC Accepts Application for New Reactor at Nine Mile Point2008-12-15015 December 2008 Press Release-08-224: NRC Accepts Application for New Reactor at Nine Mile Point Press Release-I-08-027, NRC to Discuss Annual Assessment for Nine Mile Point Plant at Two Public Meetings Set for April 23 in Fulton, N.Y2008-04-17017 April 2008 Press Release-I-08-027: NRC to Discuss Annual Assessment for Nine Mile Point Plant at Two Public Meetings Set for April 23 in Fulton, N.Y Press Release-I-07-059, NRC Assigns Resident Inspectors to Nine Mile Point2007-11-23023 November 2007 Press Release-I-07-059: NRC Assigns Resident Inspectors to Nine Mile Point Press Release-I-07-048, - NRC Monitoring Alert at Nine Mile Point Unit 22007-09-19019 September 2007 Press Release-I-07-048 - NRC Monitoring Alert at Nine Mile Point Unit 2 Press Release-I-07-019, NRC to Discuss 2006 Assessment for Nine Mile Point Nuclear Plant at Public Meeting Scheduled for April 242007-04-17017 April 2007 Press Release-I-07-019: NRC to Discuss 2006 Assessment for Nine Mile Point Nuclear Plant at Public Meeting Scheduled for April 24 Press Release-06-137, NRC Renews Operating Licenses for Nine Mile Point Units 1 and 2 for an Additional 20 Years2006-10-31031 October 2006 Press Release-06-137: NRC Renews Operating Licenses for Nine Mile Point Units 1 and 2 for an Additional 20 Years Press Release-06-069, NRC Finds No Significant Environmental Impacts from Extended Operation of Nine Mile Point, Units 1 and 22006-05-22022 May 2006 Press Release-06-069: NRC Finds No Significant Environmental Impacts from Extended Operation of Nine Mile Point, Units 1 and 2 2022-05-26
[Table view] |
Text
'I I'
- AZC M~xIBUTION 70R PART 0 DOC~ " ~xc. IAL TiivZOBARY FOB:~A COAVVROT %0,
~
.1756
, I
.. KKNS DAu OP DQC: DAT~ R" O'D LW bKi:AO Oi."M Niagara Mohawk Power Cor'porat:ion Syracuse., New. York 13202 3-12-73 .. 3-15-73 James A O'eill
.. ORIG CG GZKR PhZ A C iD."c x L. Manning Muntzing ~ '1, signed SEiiV LOCAL PAAR A.
,: (@ASS: U PROP LAAO IhPuT, NO CYS,R" C' DOCw T iiQ'0-220 50-410
'IESQRIHIQii: ENCLOSE S:
Ltr advi.sing of a number of changes in.. News Release w/Ma )or Organizational Changes.
management personnel.fdr the Nine Mi'le 'point,,
I
'* \~
. =Units 1 & 2..."trans" the 'fol'lowing: t P
@i@IIEtIiEy Do Njr.REMO<E-
~i+ NAt~~S: Nine Mile Points Units 1.&' (1 cy rec'd)
'. ZOTLIh(L)
W/ Copies SCHMENCER(L)
W/ Copies FOR ACTION rib. OK:~TIG:i EMANN(L) 3-15-73 YOUNGBLOOD(E)
W/ 4Copies (50-220) W/ Copi.es fod
.~LARK(L)
V/ 4 Copies(410)
... carz:m(L)
STXZ(L)
W/, Copies VASSALEO(I.) .
'/ ROUSE(m)
Copies
-DICKER(E)
REGAN(E)
W/ Copies W/ Copies W/ Copies W/ Copies W/,. Copies
.: KHIIZ,(L)ies
=-
scHEIm.(r,) KNXGHTON(E) '
W/ CoZ W/ 'Copies W/ Copi,es W/'opi,es INTERNAL DISTRIBUTION
~REG 1)ILE , TECH REVIEW DENTON RAM WADE HAEC PDR HENDRIE .GRXIGS, SMILE BROWN GAMMXLL NUSSBAUIKR G WIL'EZAMS .
~OGC~, ROO. L P-506A SCHROEDER
. ~ MUHT2ZNG/ST<"
CASE z MACCARY
.KHIGHT(2)
KASTNER BAILARD
=
rzc AssT.
SHEPPARD E
" 'GXN(BUSSO PAWIZCKI SPANGIZR SERVICE,. L A~ZXND BOYD SHAO WILSON L BRAITIIAH
. MOORE-I.(B~W) SWZZ8 BNlrIRO GOULBOURNE L ~ SALI!ZMAN MOLIZR SMITH '
DEYOUNG-L(Pu) HOUSTON
- ~GVHOLT-L NOVACK .- DICKER GEARIN L PClQS P COLL'3 ROSS . KNIGHTON DIGGS L MOOONALB IpporzTo YOUNGBLOOD TEETS L DUBE L
~ ~~ REG OPR MORRIS
&, REGION(2)
TEDESCO LONG LAINAS REGAN, MOJ LEADER LEE MAIGRET SHAH% P 5 L
M INFO C. MING+.
sTrzrz Bt&AROYA VOLENS
< S.<WRl'
. 1-LOCAL PDR (I)(2) (9)-NATIONAL 'IAB' 1.-I)TIE(AB~iATHY 1-1)DR-SAN/LA/NY
~ 1-NBI C (BUCr ViPZt ) I-R. 'CARROLL Op OI-2227 1-"GEEK'UCH" 1.-ASLB-YOR"/SAYRE 1 RA CATLINpE-256-GT BROQKHA~ IVT. EBS .
MOOD sIQG)/H ST. 1 =
CONSULTAIG"S 1-AGMED(~~ KomT-1~S ACES HOLDING 1-MhMARK/BIUIE/AGABIAN GEIKAD ULRIKSON..- ..ORNL RM 1
C.-427, GT)
RD ~ o MUSER F>>30.'
0 4
~
oF' I
Regulatory File Cy
'IAGARA MQHAwK PowER CoRPQRATIQN 50-220
~0-41 NIAGARA
~ MOHAWK GOO CRI2: SOULKVARO WEST
~ JAMES A. O'NK ILL SYRACUSE'.Y. IS202 PRCSIOCNT March 12, 1973
~cIVII' .
MAR15 1973 6 LS. ATOrIC ENERGY CIHISSION RegIIIatary raII Mr. L. Manning Muntzing SeeIIea, Director of Regulation United States Atomic Energy Commission Washington, D. C. 20545
Dear Mr. Muntzing:
t We have made a number of changes in management as described in the attached news release. The immediate result is that the senior responsibility for negotiating with your Directorate of Licensing is transferred from Thomas J.
Brosnan to Philip D. Raymond, who is now Vice President-Engineering.
I am making sure that the organizational changes are carried out in a manner that will not impede our efforts to obtain a construction license for Nine Mile Point Unit 2 (Docket No. 50-410) and a full-term operating license for Nine Mile Point Unit 1 (Docket No. 50-220).
Sincerely, Cg pOCIIEYEp IISIIEC NlP R> 5 "97
~
YIEGgQYOR'Y gV Qi. YIIAII. IIECTI08 POCK C& esI
k
<<~
h q
P E
NlAGARA MO K POWER CO PORATlON 300 EQE EGUL, WEST DL ,NEW YC%K13332 E(35)47kl5ll For releaseonorafter t
Syracuse--Major organizational changes in top-level management of Niagara Mohawk Power Corp. were announced today by James A. O'eill, 1
president and chief executive officer.
The utility's Board of Directors elected:
JOHN G. HAEHL, JR., vice president-finance, to the newly-designated position of executive vice president-finance and corporate planning; JAMES BARTLETT, vice president and general manager of the Central Division, to executive vice president-engineering, operations and emp oyee relations;
. THOMAS J. BROSNAN, vice president and chief engineer, to Ithe newly-established post of vice president-research 4 development and environmental matters; PHILIP D. RAYMOND, manager of system staff engineering, to vice president-engineering; RUDOLPH R. SCHNEIDER, general superintendent of operations for the Central Division, to vice president-electric operations; WIL~~IA.MR. MATTHEWS, system supervisor of gas operations, to vice president-gas operations; JAMES J. MILLER, manager of system design engineering, to vice president and general manager of the Central Division.
rlrCccc Z/
The appointments become effective~rrr~ O'eill said,
-more-
R
~'
~ h v
"Haehl, who is also a director of Niagara Mohawk, has held his present position since 1971. He joined Niagara Mohawk in 1961 after 12 years'ervice as manager for Price Waterhouse 8c Co. in New York, Rochester and Syracuse. His positions with the utility have'included assistant to',the vice president-controller, controller and, vice president-
/
controller.
B'artlett ha's served at his existing post since June 1972. He pre-viously was administrative vice president of the Central Division since January 1969. Bartlett joined Niagara Mohawk's Operating Department in 1939. He has been planning supervisor, assistant superintendent and superintendent of the Electric Department in Syracuse. In 1958 Bartlett was named general superintendent of operations for the Central Division, If
<a post he held until elected administrative vice president.
Brosnan, a director of Niagara Mohawk, joined the company in Niagara Falls in 1930 and was appointed chief engineer of its Western Division in Buffalo in 1956. He came to Syracuse as vice president and assistant chief engineer in 1963 and was elected vice president and chief engineer in 1966.
Raymond joined Niagara Mohawk in 1937 as a designer and later served as a project engineer and electrical engineer. In 1956 he was promoted to assistant chief engineer-Central Division and in 1963 he was appointed chief engineer-Western Division, a position he held until 1966, when he
.wax-transferred to Syracuse as chief system staff engineer. Raymond was elevated to his present post in 1969.
-more-
c . ~
'4t; It
Schneider
~
joined the firm in 1937 as an
.0 electric planner. He was appointed electric superintendent of the Fulton-Oswego area in 1952 and was promoted to assistant superintendent of operations for that area in 1955.
i Schneider was named superintendent of operations for the Syracuse area in 1958 and he was appointed to his present post in 1968.
Matthews, who became affiliated with Niagara Mohawk in 1938, has served as system supervisor of gas operations since 1966. He held the position of general foreman in the Syracuse Gas Department until 1952, when he was appointed assistant gas superintendent, Syracuse District.
In 1957, he was named division superintendent of gas operations, serving in that position until 1966.
Miller, who is succeeding Bartlett as top Central Division adminis'trator, joined Niagara Mohawk in 1948 as a designer. He has held posts as assistant chief engineer in both the %'estern and Central Divisions of the company and in 1965 was named chief engineer of the Central Division. He was promoted to manager of system design engineering'in 1969.
Mr. F. J. Schneider, vice president-operations will retire as an officer after 40 years of service and will continue as a consultant on special projects.
~ K A P
~
~~