Category:Letter
MONTHYEARML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable ML24158A2052024-05-15015 May 2024 Annual Radioactive Environmental Operating Report NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds 05000410/LER-2024-001, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum2024-05-0101 May 2024 Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24092A3352024-04-0101 April 2024 NRC Office of Investigations Case No. 1-2023-002 ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3577, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-03-13013 March 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation 05000410/LER-2023-001, Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater2024-01-30030 January 2024 Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000220/LER-2023-002, Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 122023-12-15015 December 2023 Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 12 NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station 2024-09-04
[Table view] |
Text
AEC DISTRIBUTION FOR PART 0 DOCXET MATERIAL MAviPORARY c'ORivA . COiiROIs NO'834-FROM>>- DA'iK OF DOC: DATE REC'D LIMO
,Niagara Mohawk Power Corporation Syracuse> N. Y.'13202
'ahab.lip D. Raymond 4-27-73 4-30-73
. ORIG CC OTHER &5T A"C H)R
'EAPi. LOCAL PDR Robert A. Clark 1 CLASS: U PROP IAVZO NO CYS REC'D DOCENT NO:
50-410 DESQRZFi".ION: ENCLOSURES:
Ltr re our 4-13-73 ltr and PASNY ltr 2-16;73 re reactor pedestal at. Nine Mile. Point 82....
adv a more detailed report will be submitted 39f0gIIjg((g by mid-May 1973...;
KANT EQSS: Nine Mile Point 82 "OR ACTION Iil;ORliATIO'Z BUTrza(L) SCHWZNCZR(L) ZXZeeN(L) YOUNGBLOOD(E)
W/ Copies W/ Copies W/ Copies W/ Copies (r) STorz(L) RoUsz(m) REGAN(Z)
/4 Copies W/ Copies W/ Copies W/ Copies GOLLER(L) VASSALM(L) DICKZR(E)
W/ . Copies W/ Copies W/ Copies W/ Copies K rxzr,(L) SCHzxr.(r,) KNIGHToN(E)
W/ Copies W/ Copies W/ Copies W/ Copies INTERNAL DISTRIBUTION DENTQN Nh M WADE E HIE GRIMES SMILNN BROWN Z OGcp R00.4 P-506A, SCHROEDER GAMMXLL NUSSBAUMER G, WILLIAMS E MACCARY KASTNER SHEPPARD ~
E MUNTZXNG/STAFF CASE KNXGHT BALING) LIC ASST.
~AMBUSSO PAWLICKI SPANGLER SERVICE L A~TIND SHAO WILSON L BRAITMAN XMOORR-L(RNR ) ST1KXG RNVIRO GOULBOURNE L SALTZMAN DZYOuNG-L(PWR) HOUSTON LMSLLl5l SMITH SKOVHOLT-L NOVAK ~ DICKER lAKA3IN L PLANS P. COLLINS ROSS KNIGHTON DIGGS L MCDONALD IppoLITO YOUNGBLOOD TEETS L DUBE RE~OPR TEDESCO REGAN L LPILE 5 REGION(2) LONG PRQZ LEADER MAXGRET L INFO LAXNAS SHAFZR' 8O M C ~ MILZS.
MORRIS STEELE BER)iROYA HARL' VOLLMR
-LOCAL PDR 1-DTXE(ABER'HY (L)(2)(9)-NATIONALLAR'S X.-X)DR-SAN/LA/NY
. 1-Nsrc(BUCHvm) ,
'I-R CARROLL-)Op OT-2227 1- GERALD LELLDUCHE 1-ASLB-YORZ/SAYRE 1>> R. CATLINNE-256-GT BROQKHAVEN NAT. LAB WOODWARD/H ST. 1- CONSULTANTiS 1-AGMED(WALTER KOESTZR 16 CYS ACRS HOLDING NEWARK/BLUME/AGABIAN RM C.-427p GT) 1- GERLAD ULRIKSON.; ~ . ORNL 1- RD. ~ .MU+2B. ~ .F>>309K
I; E
~ ~ ~
I
NIAGARA MOHAWK POWER CORPORATION i)IItM.
NIAGARA > j'OHAWK f 300 ERIE SOUI.EVARO WEST SYRACUSE. N. Y. 13202 8'l Ij April 27, 1973 ~~39 fg73 ~ I Mr. Robert A. Clark, Chief Gas Cooled Reactors Branch Directorate of Licensing United States Atomic Energy Commission Washington, D. C. 20545
Dear Mr. Clark:
Re: Nine Mile Point Unit 2 Docket No. 50-410 Your letter of 'April 13, 1973,,requested information relative to the reactor pedestal at our Nine, Mile Point Unit 2.
An initial report on the cracked concrete discovered in the reactor vessel pedestal at the James A. FitzPatrick Nuclear Power Plant was submitted to the Directorate of Regulatory Operations by letter of February 16, 1973, from the Power Authority of the State of New York.
The Stone 8 Webster Engineering Corporation is presently preparing a more detailed report on this matter in response 'to an AEC request.
It is our understanding that this more detailed report will be submitted by mid-May, 1973.
Although the overall conceptual design for these reactor pedestals are similar, it is premature to conclude that the detailed designs are the same because details for the Unit 2 pedestal are not scheduled to be developed for several months. The results of the James A. FitzPatrick Plant analysis will be considered in the Unit 2 design to preclude a similar occurrence.
Very truly yours, Philip D. Raymond Vice President-Engineering PDR/vk IIOCKEIEO Zj usIIEC
~
pygmyQ@"
BEGuLNORV SAIL SECTIOII DOCKET CLERK c,I 2834
,r ~