AEC DI IOV FOR PART 0 DOCXET T
MAVAPORARY FOBivi CONTROL NO:
bV-'~
FRONo Niagara Mohawk Power Corporation
- Syracuse, NewYork 13202
'Phili D. Raymond 4-30-73 I
5'-1-73 I
AAEA'AO RPZ OT~S TO o '. A. Clark
~ ORIG
. 1'signed CC 12 SEANT LOCAL PDR CLASS:
U OP XAVFO QESCRIPTIOiV:
I'tr furnishing addi info regarding plant design modifications.....
NO CYS REC'D
."13 ENCLOSURES:
DOCMT NO:
50-410 DISTRIBUTION:
Per A. Bournia MIR~IF>/IFII~g 00 NOT REMOyE PLAi(T KVSS:
Nine Mile Point Unit 8' FOR ACTIoiV IAI'OR'lATIOiV BUTL1W(L)
W/
Copies g CLAm(L)
W/ 1 Copies GOLLZR(L)
W/
Copies Kmzr.(I,)
'W/
Copies SCHWENCZR(I,)
W/
Copies STorz(L)
W/
Copies VASSALLO(L)
W/
Copies scmzL(I,)
W/
Copies ZIEMANN(L)
W/
Copies RousE(Fr<)
W/
Copies DICKER(E)
W/
Copies KNIGHToN(E)
W/
Copies INTtRNAL DXSTRIBUTION YOUNGBLOOD(E)
W/
Copies RZGAN(E)
W/
Copies W/
Copies W/
Copies
'XIE PD OGCN ROOi4 P-506A MUICZXNG/STAFF CASE GIAMBUSSO BOYD V. MOORE-L(BWR)
DZXOuNG-L(PWR)
SKOVHOLT-L P
COLLINS REG OPR
~LE S REGION(2)
MORRIS ST1KIZ TECH REVXEW HENDRIE SCHROEDER MACCARY KNIGHT PAWLICKX SHAO ST1~ZZO HOUSTON
'OVAK ROSS IPPOLITO TEDESCO LONG LAINAS BIWQ<OYA VOLIZER DENTON GRIMES GAMMILL KASTNER
'ALL ARD SPANGLER ENVIRO
'OLLlNl DICKER
. KNIGHTON YOUNGBLOOD BEGAN
'PROJ LEADER K)ARLY S N. S M S MILNE NUSSBAUMER LIC ASST.
SZRVXCE L
, WILSON L
GOULBOURNE L
SMITH GEARXN L
DXGGS L
TEETS L
- LEE, L
MAXGRET L
SEG'ER F
8c M WADE BROWN E
G. WILLIAMS E SHEPPARD E
A~TIED BRAXTMAN
. SALTZMAN MCDONALD,v R.
~
DUBZ u'R.
INFO Cs MILES. +F.
~F o Riani Frahm Richardson Lipinski Rieff Liederbach Guilvera
-LOCAL PDR Oswe o
N. Y.
1-DTXE(ABZ1u~mY
. 1-NSIC(BUCHA1mm) ASLB-mRZ/SAmZ WOODWARD/H ST.
16-CYS ACRS HOLDING (L)(2)(9)-NATIONALLAR'S I-R. CARROLL- >C~ GT-R227
'<<'. 'ATIZNj'E-256-GT 1-CONSULTANTEs NZNMARK/BLUMZ/AGABIAN 1-GIZLAD ULRXKSON.'
.ORNL l-PDR-SAN/LA/NY l,- GERALD LELNUCHE BRIEHAVZN NAT. LAB"
'-AGMED(
WALTER KOZSTER>
RM C.-427, GT) 1-RD...MULLER. ~.7-309GT
d
, ~ ~
fjl;
~
~
~
~
~
~
~
I
~ d Jl I
~
~
ff ft dd E
4 f
4 I
d" I
4
t E
Regulatorjj
.File Cy.
NIAGARA MOHAWK POWER CORPORATION
~g~eM cl 5
gag j
~eQe~e~e9~
6 e
NIAGARA~
MOHAWK
~lt5k, 300 ERIE 8OUI EVARD WEST SYRACUSE, N.Y. l3202 April 30, 1973 Mr. Robert A. Clark, Chief Gas Cooled Reactors Branch Directorate of Licensing
. United States Atomic Energy Commission Washington, D. C.
20545
Dear Mr. Clark:
Re:
Nine Mile Point Unit 2 Docket No. 50-410 In accordance with recent discussions with the Commission Staff, some plant design modifications have been made and supplemental informa-tion developed in connection with the Preliminary Safety*Analysis Report for our Nine Mile Point Unit 2, as described below:
Combustible Gas Control S stem:
The primary control of combustible gas.concentration following a DBA will be accomplished by providing two redundant 100 percent capacity recombiners, each rated at 100 scfm.
The system provided meets the require-ments of Safety Guide 7.
The containment will be inerted to 4 volume percent oxygen during normal operation.
To maintain the oxygen concentration below 5 volume percent following, a
- LOCA, one recombiner would be initiated at approximately 1.4 days after the accident.
At this time, the minimum containment atmosphere temperature would be about 86 F
assuming an initial pool water temperature of 65 F and a service water temperature of 32 F.
These conditions give the minimum steam dilution effect.
Sinks were not included in this analysis for conservatism.
Since the average temperature of the drywell structure would be above the 86 F temperature discussed
- above, inclusion of the sinks would serve to raise the minimum calculated 286$
I I
Nr. Robert A. Clark April 30, 1973 temperature.
One 100 percent recombiner initiated at about 1.4 days would maintain the oxygen concentration below 5 volume percent.
A backup purge system is being provided.which would not have to be initiated until approximately 30 days after a
LOCA, if the recombiner system is not used.
Nitrogen from the nitrogen inerting system would be added to the containment until the containment pressure reaches 30 psig (design pressure is 45 psig).
Under the conservative assumption of no containment
- leakage, a containment pressure of 30 psig would not be reached until approxi-mately 30 days after the DBA.
At this time, a purge flow rate of 8 scfm would be capable of maintaining the oxygen concentration below 5 volume percent.
U As indicated in PSAR Section 5.4.10 (page 5.4-13), radio-logical doses from purge initiation at 7 days would be substantially below the guidelines of 10CFR100.
Li uid and Gaseous Radwaste S stem:
PSAR Figures 9.2-1A through 9.2-1C and Figure 9.4-1 are being revised to include the following:
- l. Additional detail on controls and instrumentation.
- 2. Pipe size and pipe materials.
- 3. Tank volumes.
- 4. Fail position of significant valves.
New figures 9.2-1D and 9.2-1E will also be added.
These will show the floor drainage collection systems in the reactor building, turb'ine building and radwaste building.
A new figure 9.2-1F will also be added to define abbre" viations and symbols used in the figures discussed above.
The gaseous radwaste system will be automatically isolated on a high radiation signal from the radiation monitor downstream of the charcoal beds.
The following is an estimate of the noble gases released from the mechanical vacuum pumps.
The source of noble gases released via the mechanical vacuum pump is condensate in the hotwell, and the inventory of noble gas daughter products removed from the condensate demineralizers when the deminer-alizers are put on recirculation to the hotwell approximately
li
~l I
1 I
Mr. Robert A. Clark April 30, 1973 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> prior,to plant startup following a six week refueling outage.
It is conservatively assumed that the mechanical vacuum pumps are operated during the entire six week refueling outage each year.
Since the mechanical vacuum pumps will normally be secured when reactor steam is passing to the condensor, a reactor steam source of noble gases to the mechanical vacuum pumps was not considered.
The following assumptions were employed in developing the noble gas release estimate:
a.
Noble gas inventories were based on a 100,000
~CI/sec after 30 minutes failed fuel basis.
- b. All noble gases available at the sources described were assumed to be released.
c.
Vacuum pump "sweep" air flow rate was 4,000 cfm.
- d. The condensate demineralizers (7) were in service for 30 days since their last regeneration prior to shut down.
- e. Site boundary doses were calculated using average annual X/Q values 'for an elevated release.
Noble gas releases were thus calculated to be:
Noble Gas Hotweli Demineralizer Total
~lento e
Contribution (Ci)
Contribution (Ci)
Release (Ci)
Kr83m Kr85m Kr85 Xe13lm Xel33m.
Xe133 Xel35m Xel35
.110
.001
.0
.00032
.0061,
.085 4.7
.41
.0
.0
.0
.170
.00
.,1 60
.0
.,8
.11
.001
.0
. 170
.0061
.25 4.7
.41 5.
5 The site boundary dose due to total noble gas release is less than 10 4 mrem.
Bases for Accident Anal ses:
The analyses detailed in Section 14 of the Nine Mile Point Unit 2 PSAR are based on the fuel design described in Section 3.
This design and the analyses described in Section 14 are typical of the 1969 General Electric product line plants.
1
~g1 M
- I
Mr. Robert A. Clark Apri 1 30, 1973 PSAR - A endix J:
The cumulative usage factor as defined in Section J.2.1.1.1(3)@changed from 0.2 to 0.1.
The entire Section J.2.1.1.3 is deleted and replaced with the following: All high energy lines penetrating the primary containment will be restrained as close as practical to the outboard valve in order to prevent lateral movement due to a longitudinal break.
A description of the PISCES computer program referenced in Section J.2.1.2(3) will be included in a future PSAR submittal.
In connection with Secti'ons J.2.1.3 and J.2.3, loading combinations will be submitted, which include simultan-eous earthquake and pipe loads for the design of Class I
structures other than primary corItainment.
The following sentence is added to the end of the first paragraph in Section J.2.4.1:
Ventilation equipment, if required to mitigate the environmental consequences of a pipe break, will be designed with redundancy and environmental capability to ensure its availability.
Section J.2.4.2 is modified by replacing the last sentence with the following:
The possibility of flooding will be considered for each pipe break as part of system design.
Verification will be made that no break can cause a flooding condition, which will affect thej ability to safely shut down.
Section J.3.1.1 is modified such that the last sentence reads as follows:
Breaks in the main steam and feedwater piping, anywhere in the plant, cannot affect any engineered safety features.
The information described above will be incorporated in an Amendment to our application and submitted to the Commission in the near future.
Very truly youVs, Philip D.
Raymond Vice President-Engineering PDR/vk
vl
ARVIN E. UPTON EUGENE B. THOMAS'R.
LEONARD M. TROSTEN HARR Y H. VOIGT WASHINOTON FARTHCA5 LAW OFFICES OF LEBOEUF, LAMB,LEIBY 8I MACRAE 1821 JEFFERSON PLACE, N.W.
WAsHINGToN,D.C. 20036 ONC CHASE MANHATTANPLAZA NCW YORK'.Y. IOOOS WASHINGTON TCLCPHONC May 1, 1973 202 FEOCIIAL B-Dill CASLC AOORCSS Mr. John F. O'eary Director of Licensing U.S. Atomic Energy Commission Washington, D.C. 20545 PPI LALALVgWASHINGTON O. C.
Af4yg, 4 ~
Re:
Niagara Mo awk Power Corporation Nine Mile Point Unit 2
,AEC Docket No. 50-410
Dear Mr. O'eary:
The Applicant transmitted two (2) copies of its proprietary response to request 3.8 in accordance with 10 C.F.R.
$2.790 and g9.5(a) (4) as part of Supplement -No. 10, transmitted by Amendment No.
11 in the above-captioned proceeding.
Your Staff has requested thirty-eight (38) additional copies of this proprietary 'response.
Therefore, we transmit herewith thirty-eight (38) additional copies of the proprietary response to request 3.8 originally filed on, April 17, 1973 by Amendment No.
11 in this proceeding.
We, req'uest that,,these additional copies also be withheld from public disclosure pursuant. to our original letter of transmittal.
Since the other parties to this proceeding were served with notice of the submission of the response to request 3.8 on April 17, 1973 but the response was not made available to them, no service of this submittal is being made upon the other parties at this time.
Very truly yours,
~Ax Enclosures
- LeBoeuf, Lamb, Leiby & MacRae Attorneys for Niagara Mohawk Power Corporation
~864
BEFORE THE UNXTED STATES ATOMIC ENERGY COMMISSION In the Matter of
)
)
Niagara Mohawk Power Corporation
)
(Nine Mile Point Unit 2)
)
/
Docket No. 50-410 CERTIFICATE OF SERVICE I hereby certify that X have served, pursuant to the Atomic Energy Commission's Rules and Regulations, copies of the Applicant's letter of April 30, 1973 concerning the combustible gas control system and other matters in the above-captioned proceeding upon the following persons this 1st day of May 1973.
AEC Regulatory Staff William Massar, Esp.
Bernard M. Bordenic'k, Esq.
Mark R. Haflich, Esp.
U.S., Atomic Energy Commission Washington, D.C. 20545 (1 copy)
New York State Atomic Energy Council Peter L. Rupert, Esq.
J.
Bruce MacDonald, Esp.
Department of Commerce 99 Washington Avenue
- Albany, New York 12210 (1 copy)
Daniel M. Head, Esp.
Atomic Safety and Licensing Board Panel U.S. Atomic Energy Commission Washington, D.C. 20545 (1 copy)
Joseph F. Tubridy, Esq.
4100 Cathedral
- Avenue, N.W.
Washington, D.C. 20016 (1 copy),
Dr. Marvin M. Mann Technical Advisor
, Atomic Safety and Licensing Board Panel U.S. Atomic Energy Commission Washington, D.C. 20545 (1 copy)
Dr. William E. Martin Senior Ecologist Battelle Memorial Institute
- Columbus, Ohio 43201 (1 copy)
Mr. Gustave A. Linenberger Atomic Safety and Licensing Board Panel U.S. Atomic Energy Commission Washington, D.C. 20545 (1 copy)
Ms. Suzanne Weber 78 West Seneca Street
- Oswego, New York 13126 (1 copy)
Ecology Action
'/o Richard Goldsmith Syracuse University College of Law E.I. White Hall, Campus
- Syracuse, New York 13210 (1 copy)
Mr. Nathaniel H. Goddrich Chairman Atomic Safety and Licensing Board Panel U.S. Atomic Energy Commission Washington, D.C. 20545 (1 copy)
Secretary U.S. Atomic Energy Commission Washington, D.C. 20545 (1 copy)
Mr. Alvin L. Krakau,
- Chairman, County Legislature County Office Building 46 East Bridge Street
- Oswego, New York 13126 (1 copy)
Mr. Robert P. Jones Supervisor, Town of Scriba R.D. 44
- Oswego, New York 13126 (1 copy)
Mr. Angelo Giambusso Deputy Director for Reactor Projects U.S. Atomic Energy Commission Washington, D.C. 20545 (2 copies)
J es P. McGranery, L Boeuf, Lamb, Leiby & MacRae Attorneys for Niagara Mohawk Power Corporation
,I 0