From: Rhode G
Niagara Mohawk Power Corp
To: Stolz J
Office of Nuclear Reactor Regulation
References
Download: ML17037B960 (4)


Text

U.S. NUCLEAR REGULATORY CC' SSION NRC FoRM 195 I2 7GI NP NRC DISTRIBUTION FoR PART 60 DOCI(ET MATERIAL DOCKET NUMBER FILE NVMSER To:

Niagara Mohawk Pwr Cor Mr Stolz Niagar'a Mohawk Pwr Corp

, Sy'racuse, NY.

G K Rhode DATE OF DOCUMENT 3-5-76 DATE RECEIVED 3-10-76

%LETTER JR ORIGINAL Dcopv QNOTORIZED

@UNCLASSIFIED PROP INPUT FORM NUMBER OF COPIES RECEIVED

/

one signed DESCRIPTION Ltr trans the following:

ENCLOSV RE 1

Design 6 Analysis Methods for Revetment Ditch System Nine Mile Point'uclear Statio Unit 2....dtd Feb 1976..................;.

(3 cys encl rec'd)

'.IACKNOWLZDGgg PLANT NAME:

Nine Mile Pt 82 DO NOT REMOVE SAFETY ASSXGNED AD:

BRANCH CHIEF:

FOR ACTION/INFORMATION ASSIGNED AD :

BRANCH CHIEF

~

ENVIRO PROJECT MANAGER:

LlC~ PSST, e

pal I PROJECT MANAGER:

LIC~ ASST EG FILE P

L+V I RE INTERNALDISTRIBUTION BENAROYA ERNST ALLA D SPANGLER GOSSICK 6 STAFF PROJECT MANAGEMENT BOYD P.

COLLINS HOUSTON PETERSON MELTZ HELTEMES SKOVHOLT LPDR'E TXC NS ASLB 8

ltllICl5 NRC FORM 1GS I2.7GI EN INEE N

KNIGHT SIHvlEIL PAMLICKI REACTOR SAFETY ROSS NOVAK ROSZTOCZY CHECK AT 6 I SALTZMAN EXTERNAL DISTRIBUTION ATL LAB Go V"IE LA PDR CONSULTANTS XPPOLITO OPERATING REACTORS STELLO OPERATING TECH EISENHUT SHAD BAER SCHICENCER GRIMES SITE SAFETY 6c E R

ANALYSXS DENTON Sc MULLER BROOK11AVEN NATL LAB ULRXKSON(ORNL)

SITE TECH GAMMILL STEPP HlKtfAN SITE ANALYSIS VOLL?IER BUNCH J ~

COLLINS KREGER CONTROL NUMBER

~

~

~

~

~

~

~

~

~ ')

~

~

~

~

NIAGARAMOHAWKPOWER CORPORATION NIAGARA ~

MOHAWK 300 ERIE BOULEVARD, WEST SYRACUSE. N. Y. 13202 March 5, 1976 Director of Reactor Regulati on Attn:

Mr. J'. F. Stolz, Chief Branch 2-1 U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Re:

Nine Mfle Point Unit 2 Docket'o.

50<<410

Dear Sir:

REBOLATQ:i" DQ(,""-T )[LE (0Py L.-.'--:

'nclosed for your review are three copies of the design and analysis methods for the Revetment-Ditch System for Nine Mile Point Unit 2.

TAis report is submitted in response to Section 2.4.5 of the Commission's Safety Evaluation Report which required certain additional information and analyses.

We request that you first review and approve Section 4, "Physical Model Study," hefore evaluating the entire design since that study will determine the actual revetment design requirements.

Expeditious approval is essential to maintain our present construction schedule.

Very truly yours, NIAGARA MOHAWK POWER CORPORATION GERALD K.