Letter Responding to a Request for a Report Describing the Geologic Features in the Reheater Bay Area, North Radwaste Trench, Circulating Water Intake Building, Normal Switchgear Building and North Notch
ML17037B935
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/16/1977
From: Bartlett J
Niagara Mohawk Power Corp
To: Rusche B
Office of Nuclear Reactor Regulation
References
Download: ML17037B935 (4)


Text

U.S. NUCLEAR REGULATORY C ISSION 1

NRC FCRM.1~

I2 76)

NRC DISTRIBUTJON FoR PART 50 DOCI<ET MATERIAL DOCKET NUItIBER wo-w/~

FILE NUMBFR Mr Rusche tZLETTER

%/ORIGINAL DCOPV

.DNOTORIZEO

@UNC LASS I F I E 0 PROP Niagara Mohawk Pwr Corp

Syracuse,

'NY JBartlett INP UT-F0RM-~

DATE OF DOCUMENT' DATE RECEIVED NUMBERNF COPIES RECEIVED I

,<t ape sigped DESCRIPTION re 9<<15-76, meeting with NRC Staff...,...

, advising that requested rpt concerning geologic features in the Reheater Bay will be forwarded on 2-25-77.........

ENCLOSURE ACKNOWLKD'GED

'0 OV8 Nine Mile Pt 01 SAFETY ASSIGNED AD:

FOR ACTION/INFORMATION 2-22-77 ehf f/'R CT kfANA E LIC ASST vcrlCC PROJECT MANAGER'IC ASST 0

EG FXL NRC PDR I &.E OELD GOSSICK & STAFF MIPC CASE HANAUER HARLESS PROJECT MANAGEMENT BOYD PE COLLINS HOUSTON PETERSON MELTZ HELTEtfES SKOVHOLT TIC:

NSXC:

ASLB:

ACRS CYS tfO'!STNCIJ INTERNAL0 SYSTEMS SAFETY HEINEMAN SCHROEDER ENGINEERING MACARRY KNXGHT SIHWEIL PAWLXCK REACTOR SAFETY ROSS NOVAK ROSZTOCZY CHECK AT&I SALTZMAN RUTBERG EXTERNAL DISTRIBUTION NAT LAB:

REG V IE LA PDR CON ULTAttTS:

'E ISTR I BUTION PLANT SYSTEMS TEDESCO IPPOLXTO OPERATXNG REACTORS STELLO OPERATXNG TECH, EISENHUT BUTLE 0

It.

ULRlKSON OR S TE SAFE' ERNST BALLARD SPANGLER SITE TECH GAMMILL STEPP HULMAN SITE ANALYSIS

~ VOLLMER BUNCH J ~ COLLINS KREGER CONTROL ItIUMBER NRC FORM 196 (2-76)

f*t

IISgigitt0+

NIAGARAMOHAWKPOWER CORPORATION /

NIAGARA 'OHAWK 300 ERIE BOULEVARD. WEST SYRACUSE, N. Y. I3202 ccex! rto USMC 9

B k8 1SV 0 Moii Section

]n Ooc4t Cretic February 16, 1977 Director of Nuclear Reactor Regulation Attn:

Mr. Benard C. Rusche, Director U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Re:

Nine Mile Point Unit 2 Docket No. 50-410'w

<~i ~ I-.i/

'g%b pze1~~~7~~~

3

~(gpg R%~

O.S.

ODI,IIrILSSIDH IIIctIISedIo"

Dear Mr. Rusche:

During a September 15, 1976 meeting at the Nine Mile Point Unit 2 construction site, members of your staff requested a report describing the geologic features in the Reheater Bay

area, North Radwaste Trench, Circulating Water Intake Building, Normal Svitchgear Building and North Notch of the Reactor Building.

Thzs report was requested to be provided on or about February 15, 1977.

An inVestigatXon of the features on site is underway.

The correlation between the geologic features in the Reheater Bay and other site geologic investigations has necessitated a

change of the report schedule.

Our geologic consultants are presently finalizing the report.

We will provide information and a preliminary assessment of the geologic features in these areas on February 25, 1977.

Very truly yours, NIAGARA MOHAWK POWER CORPORATION JAMES BARTLETT Executive Vice President NLR/sz