Letter Advising That the Final Report Describing the Hydraulic Model Studies of the Revetment Ditch System Is Now Scheduled to Be Submitted by June 30, 1977
ML17037B932
Person / Time
Site: Nine Mile Point 
Issue date: 05/02/1977
From: Rhode G
Niagara Mohawk Power Corp
To: Case E
Office of Nuclear Reactor Regulation
References
Download: ML17037B932 (4)


Text

II

~

~

I2-70)

NRC DISTRIBUTION FoA P 50 DOCI<ET MATERIAL FILE NUMOCA-TO Mr. Edson G. Case FROM: Niagara Mohhwk power Corp.

Syracuse, N. Y. 13202 Gerald k. Rhode DATE OF DOCUMENT DATE AECEIVE 0 0-JKLETTEA gt)AIGINAL CICOPV ONOTOAIZED 5fUNC LASS IF I E D P BOP INPUT FOAM NUMOEA OF COPIES AECEIVED 1 S/4'md' JS.

yt, for Unit 2 willbe submitted by J'une 30, 1977o..

DESCAIPTION ENCLOSU AE Ref their 02-02-77.ltr...Advising final report concerning, describing the'ydra ic.

model studies of,t e >Revetment itch -S stem

~

~

(1X ge)

PLANT 'NAME:

0 7

jcm NINE MILE POINT UNIT g 2 SAFETY ASSIGNED AD:

MANC~I~~

ROJECT 1L~ NA('E LXC ASST FOB ACTION/I e,race NFORMATION SSIQHF

~BANCHM1 PROJECT MANAGER:

LIC ASST REG FILE INTERNAL0 SYSTEMS SAFETY IST R I BUTJOill PIXNT SYSTElIS

'RC PDR OELD GOSSXCK 6 STAFF MIPC CASE 1IANAUER 1IARLESS PROJECT MANAGEMENT BOYD PE COLLINS HOUSTON PETERSON MELT7.

HELTEHES SKOYIIOLT LPDR TIC:

NSXC:

ASL13:

ACRS CYS HOLDX4C/

NAC FOAM 196 I2 7')

HEIIK~I1AN SCHROEDER ENGINEERXNG MACARPY BOSNAK SIINEIL PACILIC K REACTOR SAFETY ROSS NOVAK ROSZTOC7Y CHF.CK AT5: I SALTZIIAN RUTBl'.RG NAT 1i,ll RECrV ~ XE LA PDR CONS ULTANTS:

T C

'E EXTERNAL DISTR IOUTION TEDF.SCO

~I'N<~0 A

~GLINK

'PPOLITO OPERATING REACTORS STELLO OPERATXNG TECH EXSENHUT S)gA hE BVIG~E IGIIES gROOI'IIMI1,"H IIAT.~

UIIITKSO~NORN

.OMHALYZLS

&MT HLSJttt.d'-'--tt~RCH ERi'ST BALLARD SPANGLER SITF. TECH GPktIXLL STEPP HULMAN SITE ANALYSIS VOLLHER 13UNCH J ~.COLLINS KREGER CONTROL NUMBER 77i2y023g

~ ~

v "l

~

(~

w ~. ~, ~ ~o

~

~ "i~

I V g.,

lb LJ p)$ >>

fljgg 4, /~4 " )W ff

NIAGARA MOHAWK POWER CORPORATION

~ilIIM NIAGARA~

MOHAWK 300 ERIE BOULEVARD WEST SYAACUSS, N. Y. l3202 May 2, 1977 Mr. Edson G.

Case, Acting Director Office of Nuclear Reactor Regulation U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555

++gg)IhOgf ry'e:

Nine Mile Point Unit 2 Docket No. 50-410

Dear Mr. Case:

Our letter of February 2, 1977 indicated that we planned to submit the final report describing the hydraulic model studies of the Revetment Ditch System for Nine Mile Point Unit 2 by May 2, 1977.

So that we may incorporate information contained in the August 12, 1976 and October 25, 1976 letters addressed to Mr.

G.

R. Quittschreiber, of the Advisory Committee on Reactor Safeguards, the final report is now scheduled to be'ubmitted by June 30, 1977.

Very truly yours, 1

NIAGARA MOHAWK POWER CORPORATION G raid K.

ode Vice President Engineering PEF/sj z 77129023i

~