ML17037B925

From kanterella
Jump to navigation Jump to search
Letter Informing That the Final Report Describing Hydraulic Model Studies Is Scheduled to Be Submitted by August 1, 1977
ML17037B925
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/30/1977
From: Rhode G
Niagara Mohawk Power Corp
To: Case E
Office of Nuclear Reactor Regulation
References
Download: ML17037B925 (4)


Text

'NRC TO:

iaR+4$ 5 BRC LIISTRIBUTION FDR PA E.G. CASE 0 DOCKET MATERIAL FROM: NIAGARA MOHAWK POWER CORP SYRACUSE, N.Y.

t U.S. NUCLEAR REGULATORY COMMISSION DOCKET NUMBER wo- vio FILE NUMBER DATE OF DOCUMENT 6 30 77 G.K. RHODE DATE RECEIVED 7/6/77 LETTER 0 NOTOR IZE 0 PROP INPUT FORM NUMBER OF COPIES RECEIVED I

I 2iSRIGINAL C1COPY DESCRIPTION CKINCLASSIFIED ENCLOSURE rs LTR. ADVISING THAT THE FINAL REPORT DESCRIBIN THE HYDRAULIC MODEL STUDIES OF THE REVE/MENT DITCH SYSTEM IS CURRENTLY SCHEDULED TO BE SUBMITTED BY AUGUST 1, 1977....

(1P) kggg<~@

ftfj Mt @emj PL'ANT NAME'- NINE MILE PT. ff. 2 FO ACTION/INFORMATION ENVIRItINMENTAL b ASSIGNED AD: V0 MOORE LTR BRANCH CHIEF:

ECT LLNAGER: PROJECT %LAAGER:

ICENSING ASSISTANT: 0 C LICENSING ASSISTANT:

B~ HARLESS INTERNAL DISTRIBUTION STFMS SAFETY PLANT SYSTEMS SITE SAFETY &

HEINEMAN TEDESCO ENVIRON ANALYSIS R EDER BENAROYA DENTON & MULLER A F ENGINEERING IPPOLITO ENVIRO TECH ERNST OPERATING REACTORS BALLARD YOUNG BLOOD BAER BUTLER GAMMILL 2 Z CZY GRIMES CHECK SITE ANALYSIS VOLLMER AT I BUNCH ALTZMAN J ~ COLLINS TBERG KREGER EXTERNAL DISTRIBUTION CONTROL NUMBER TIC NSIC 771880063 REG IV J K4ICHETT 16 CYS ACRS SENT CAT GO Y

\

~ I, h k

ri e,

~ 6 P

,, ~, III l %a a II+

- t

NIAGARA MOHAWK POWER CORPORATION

,>>ill~;

NIAGARA I+< MOHAWK 300 ERIE BOULEVARO WEST SYRACUSE. N. Y. I3202 June 30, 1977 Mr. Edson G. Case, Acting Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 RepApf~0 3 ~Pl, j Re: Nine Mile Point Unit 2 Docket No. 50-410

Dear Mr. Case:

The final report describing the hydraulic model studies of the Revetment Ditch System for Nine Mile Point Unit 2 is currently scheduled to be submitted by August 1, 1977. As indicated in our letter of May 2, 1977, this report was pre-viously scheduled for submittal by June 30, 1977.

Very truly yours, NIAGARA MOHAWK POWER CORPORATION Gerald K. Rh de Vice President - Engineering