MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01
[Table view] Category:Safety Evaluation Report
MONTHYEARML0628901292006-09-30030 September 2006 NUREG-1900, Vol 1 Safety Evaluation Report Related to the License Renewal of Nine Mile Point Nuclear Station Units 1 & 2 ML0614603132006-06-0101 June 2006 Safety Evaluation Report Related to the License Renewal of the Nine Mile Point Nuclear Station, Units 1 and 2 (TAC Nos. MC3272 and MC3273) ML0610201662006-04-0303 April 2006 Safety Evaluation Report with Open Items Related to the License Renewal of Nine Mile Point, Dated March 2006 - NMPNS Comments (TAC Nos. MC3272 and MC3273) ML0605807582006-03-0303 March 2006 Safety Evaluation Report for the Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application ML17037B5881978-05-26026 May 1978 Letter Regarding a Request for Evaluation of the Effect on Unit 1 Containment of Multiple Subsequent Actuations of Safety/Relief Valves Following a Postulated Isolation Event ML17037B9231977-08-22022 August 1977 Letter Regarding a Report Describing the Unit 2 Reactor Building Polar Crane and a Review of the Information Provided in a July 20, 1977 Letter ML17037B6251977-06-0202 June 1977 Letter Regarding a Review of Licensee Responses to Previous Generic Request for Information Relative to the Electrical Power Distribution Systems and an Enclosed Safety Evaluation and Statement of Staff Positions ML17037B9601976-03-0505 March 1976 Letter Regarding a Review of the Design and Analysis Methods for the Revetment-Ditch System and Requesting a First Review and Approval of Section 4, Physical Model Study. ML17037C4771974-11-15015 November 1974 Letter Enclosing Supplement No. 1 to the Safety Evaluation Report for the Application for a Full-Term Operating License ML17037C0291973-06-15015 June 1973 Letter Regarding the Safety Evaluation of Niagara Mohawk Power Corporation Application for a Permit to Construct the Nine Mile Point Nuclear Station Unit 2 2006-09-30
[Table view] |
Text
Pocket No. SO-410 Niagara Mohawk Power Corporation ATIN: lb;. Gerald K. Hhode Vice President - Engineering 300"Erie Boulevard Nest Syracuse, New York 13202 Gentlemen:
SUMECT NINE lvtILE POIÃZ NUCLEAR STATION UNIT 2 REACIOR BUILDING POLAR CRANE In your letter 'to the Nuclear Regulatory Commission staff dated July 20, 1977 you enclosed a report describing the Nine Mile. Point Nuclear Station - Unit 2 reactor building polar crane. You stated that the submittal was in response to Section 9.1.2 of our Safety Evaluation Report for the facility. In that report we required that you submit the design before cnnstruction.
Ne have reviewed the infomation provided in your July 20, 1977 letter and conclude'that it adequately addresses the requirement set forth in the Safety Evaluation Report. Ne will of course review the detailed design of the reactor building polar crane at the operating 3;icense stage.
If you have any questions regarding this matter please contact the staff s assigned Licensing Project hhnager immediately.
Sincerely, Steven A. Varga, Chief Light Water Reactors Branch 4 Division of Project hfanagement arricr~ DPH It4 955b DP SUnNAMii~ ......"-, ..............,, VBenaroya Aya a DATL~ pe ZZ /77 Og/77 0 /77 NRC FORM 318 (9.76) NRCM 0240 4 v. s'. aovanNMrn j rninviiii oe rica iowa - cue.a@4
a P I ee
~ I ep J 1
ep-KP P
~ tl
\
1
~, g JFT I'ee
<<1 1
. Tt I 1
~ 1 fr il I I l
1 4I, 2 14 1
1
=~
~ ~ ~
a 1
>I fit I I 2 P P I \ t14 2'44 CI I t P (fK e= 4' ~,.
~ "41 ~ f 11 MK re I t' 1 t
1 jl I 2
\
2 e-1 I
Pe 2- e le PV
Distribution NRC PDR Local PDR Docket File L'AR 84 File RSBoyd RCDeYoung DBVassallo FJlfilliams SAVarga NKane MService RJMattson DRoss JKnight RTedesco HDenton VAMoore RHVo-lmer MLErnst NPGammill ELD IE (3) bcc: J. R. Buchanan, NSIC Thomas B. Abernathy, TIC ACRS (16)
- 0 A
'I
~ p ~(p+
R<auc
'tp ' UNITED STATES 0
4p NUCLEAR REGULATORY COMMISSION I o O WASHINGTON, D. C. 20555
,~A <
+~ ~O August 22, 1977
++**+
Docket No. 50-410 Niagara hfohawk Power Corporation ATTN: Mr. Gerald K. Rhode Vice President - Engineering 300 Erie Boulevard West Syracuse, New York 13202 Gentlemen:
SUBJECT:
NINE MILE POINT NUCLEAR STATION - UNIT 2 REACTOR BUILDING POLAR CRANE .
In your letter to the Nuclear Regulatory Commission staff dated July 20, 1977 you enclosed a report describing the Nine Mile Point Nuclear Station - Unit 2 reactor building polar crane. You stated that the, submittal was in response to Section 9.1.2 of our Safety Evaluation Report for the facility. In that report we required that you submit the design before construction.
We have reviewed the information provided in your July 20, 1977 letter and conclude that it adequately addresses the requirement set forth in the Safety Evaluation Report. We will of course review the detailed design of the reactor building polar crane at.
the operating license stage.
If you have any questions regarding this matter please contact the staff's assigned Licensing Project Manager immediately.
l4>i Steve'. A ar Chief Light Water R c tors Branch 4 Division of Project Management
\
Niagara Mohawk Power Corporation ccs0 Eugene B. Thomas, Jr.
LeBoeuf, Lamb, Leiby & MacRae 1757 N Street, N. W.
Washington, D. C. 20036 Anthony Z. Roisman, Esq.
Roisman, Kessler & Cashdan.
.1025 15th Street, NW Washington, D. C. 20036 Mr. Richard Goldsmith Syracuse University College of Law E. I. White. Hall Campus Syracuse, New York 13210 T. K. DeBoer, Director Technological Development Programs New York State Energy Office Swan Street Building Core 1 2nd Floor .
Enquire State Plaza Albany, New York 12223
P
~P t P