REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS>
DISTRIBUTION FOR INCOMING MATERIAL 50-410 REC:
CASE E
G NRC ORG:
RHODE G K NIAGARA MOHAWK PWR DOCDATE: 01/30/78 DATE RCVD: 02/02/78 DOCTYPE:
LETTER NOTARIZED:
NO COPIES RECEIVED
SUBJECT:
LTR 1
ENCL 0 ADVISING FINAL REPT RE FEEDWATER NOZZLE DESIGN WILL BE SUBMITTED IN JULY'978.
PLANT NAME: NINE MILE j OINT UNIT 2 REVIEWER INITIAL:
XJM DISTRIBUTOR INITIAL:
+4H~+44+++++++++44. DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS STEAM GENERATOR FEEDWATER FLOW INSTABILITY <WATER HAMMER)
(DISTRIBUTION CODE A012)
FOR ACTION:
INTERNAL:
EXTERNAL:
BRANCH
(
TR ONLY(7)
REG FILE++LTR ONLY
/
HANAUER++LTR ONLY(l>
SHAO++LTR ONLY<2)
BUTLER++LTR ONLY(2)
J.
COLLINS4+LTR ONLY< 1)
J.
P.
KNIGHT+4LTR ONLY(1 )
LPDR'S OSWEGO'Y++LTR ONLY<i)
TIC++LTR ONLY(i>
NSIC++LTR ONLY< 1)
ACRS CAT B+~LTR ONLY(16>
NRC PDR++LTR ONLY(l>
OELD++LTR ONLY<i)
EISENHUT++LTR ONLY(i>
BAER++LTR ONLY< 1)
GRIMES++LTR ONLY(1>
V.
BENARQYA++LTR ONLY< 1)
E.
REEVES++LTR ONLY(i)
DISTRIBUTION:
LTR 43 ENCL 0 SIZE:
1P CONTROL NBR:
780330046 THE END
(
L t
NIAGARAMOHAWKPOWER CORPORATION/300 ERIE BOULEVARDWEST, SYRACUSE, N.Y. 13202/TELEPHONE (316) 474-1511 January 30, 1978 Fpgg 1978~
11a4 Mr. Edson G. Case, Acting Director Office of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555 Re:
Nine Mile Point Unit 2 Docket No. 50-410
Dear Mr. Case:
My August 19, 1976 letter indicated that feedwater nozzle design information would be provided before January 30, 1978.
This schedule was based on General Electric finalizing the design and providing the report within this period.
General Electric has kept,your staff informed of the progress and schedule for finalizing the feedwater nozzle design.
General Electric indicates that this design infor-mation will be available about April, 1978.
Based on this schedule, Niagara Mohawk's final report will be submitted in July, 1978.
We will keep you advised of further schedule changes if they occur.
Very truly yours, NIAGARA MOHAWK POWER CORPORATION Ge aid K. Rhode, ce President System Projec