ML17037B876
| ML17037B876 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 11/01/1977 |
| From: | Rhode G Niagara Mohawk Power Corp |
| To: | Robert Carlson NRC Region 1 |
| References | |
| Download: ML17037B876 (4) | |
Text
NRC FORM 195 2-76)
U.S. NUCLEAR REGULATORY C 4IISSION DOC T NUMBER 0-O NRC DISTRIBUTION FoR PART 60 DOCKET MATERIAL o
FILE NUMBER 0:
Mr.
R+ To Garison FROM:
Niagara Mohawk Power Corp'yracuse, New York Gerald Ke Rhode DATE OF DOCUMENT 11/1/77 DATE RECEIVED 11/4/77 ETTE R ORIGINAL COPY CINOTOR IZED
)(UN C LASS IF I E D PROP INPUT FORM NUMBER OF COPIES RECEIVED DESCRIPTION
~ IA.g
/Q g Q 77 /~
ENCLOSU RE Consists of info~ ieoevaluation of criteria for stress relief designo
~ ~
I (1-P)
PLANT NAhIE:
Nine Mile Point Uni,t No 2
RJL 11/7/77 FOR ACTION/INFORMATION ENVIRONhIENTAL NCH CHIEF:
PROJECT MANAGER:
LIC. ASST:
ASSIGNED AD:
BRANCH CHIEF:
FR:
ORF.
HARLESS INTERNALDISTRIBUTION T SYSTEhfS SITE SAFETY G
DENTON 8 MULLER GOSSICK G STAFF ENGINEERING LITO CTORS FNVIRON TECH ERNST BALLARD L
D ANA EVENT LINS EACTOR SAFETY ROSS NOVAK ROSZTOCZY CHECK BAER TLF.R TECH AMMILL 2
A ALYSIS VOLLMR LPDR:
TIC SIC REG V J.
HANCHETT) 16 CYS SENT CATEGOR NRC FORM 196 (2.76)
TGI LTZMAN EXTERNALDISTRIBUTION LLINS CONTROL NUMBER 73iioio5
0 k
4 l
~
I
NIAGARAMOHAWKPOWER CORPORATION NIAGARA Q'OHAWK 300 ERIE BOULEVARD. WEST SYRACUSE. N. Y. 13202 November 1,
1977 Office of Inspection 6 Enforcement Region 1
Attn:
Mr. R, T. Garison, Chief Reactor Construction
& Engineering Support Branch U.
S. Nuclear Regulatory Commission 631 Parle Avenue King of Prussia, PA 19406 4
<oy Pf$/ypg 6 fj ]gp~
Cg Re:
Nine Mile Point Unit 2 Docket No. 50-410
Dear Mr. Carlson:
Me have received your letter of October 25, 1977 which discusses our October 5, 1977 notificaton submitted under Section 50.55(e)(l) of the Commission's Regulations.
Me are continuing to evaluate the criteria for stress relief design.
Construction progress in the safety related tunnel wall vicinity has been rescheduled to allow inspection and evaluation of the structures.
The review of the criteria will require several months to complete.
Therefore, a report describing any corrective actions and an analysis of the implications of this condition will be provided in February, 1978.
Sincerely, NIAGARA MOHAMK POMER CORPORATION er d K. Rhode Vice President-System oject Management N R/szd c:
Director of Nuclear Reactor Regulation 773110105
0 og