ML17037B861
| ML17037B861 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 06/22/1973 |
| From: | Bournia A US Atomic Energy Commission (AEC) |
| To: | Clark R US Atomic Energy Commission (AEC) |
| References | |
| Download: ML17037B861 (4) | |
Text
~gI,I<I'y~
a+
/
/w~
~l4Ig II$-'NITED STATES ATOMIC ENERGY COMMISSION WASHINGTON, D.C.
20545 JUN 22 1973 I
. Robert A. Clark, Chief, Gas Cooled Reactors
- Branch, L
Time 5 Date:
FORTHCOMING ACRS SUB-COMMITTEE 'MEETING ON NINE NILE POINT-2 8:30a.m.,
June,26, 1973 Location:
1'717 H Street,
'Washington, D.C.
Purpose:
Groups Participating:
ACRS Sub-committee meeting on Nine Nile Point-2, see attachment for schedule and agenda.
L; R. A. Clark, A. Bournia, J.
Hulman or E. Hawkins, F. Rosa, J.
Richardson, L. Riani, J. Kohler, and E. Bailey ACRS:
Dr. D. H. Moeller (Acting Chairman) and Dr. C.
P.
Seiss NMPC:
G.
K. Rhode, C. V. Hangan, J.
L. Hilke, P. A. Burt, S.
F. Hanno, and F. J.
Schneider S
8I kl:
R. Nilsen, G.
D. Gawdy, P. J. Gillis, L. Katler, R. N. Kerrigan, and G. J.
Cunningham GE:
F. tleinzimmer, G. F. Darmohray, C.
G. Lewis, and J.
Power (L ~m~~ S(tc~~
Anthony Bournia, Project Manager Gas Cooled Reactors Branch Directorate of Licensing
Attachment:
Schedule and Agenda Distribution:
~kF
'EC PDR Local PDR GCR Reading L Reading RP Reading E.
G. Case A. Giambusso R.
S.
Boyd I
V. A. Moore l<. Haass RP/ADs RP/BCs TR/ADs TR/BCs R.
F. Fraley Il. Rosen RO (3)
A. Bournia J. Norris R. A. Clark J.
Hulman E.
Hawkins F.
Rosa J. Richardson L. Riani J.
Kohler E. Bailey H. Gearin Receptionist
SCHEDULE'AND'AGENDA OF'MEETING SCHEDULE:
8:30 AM
'.9:30 AM 10:30 AM 12:30 PM 1:30 PM 1:30 PM 4:30 PM 4:45 PM 5'00 PM Executive Session (Closed)
Meeting with the AEC Regulatory Staff (Open)
Meeting with the Niagara Mohawk Power Corporation (Open)
LUNCH Resume Meeting with the Niagara Mohawk,.Power Corporation (Open)
Statements by the Public, if any (Open)
Caucus (Closed)
Concluding Statement (Open)
ADJOURN AGENDA:
1.
Site Related Matters including:
a.
Site description and plant layout b.
Population density and forecasts c.
Flood protection d.
Seismic design Offsite power f.
Onsite power (diesel generators) 2.
Reactor Plant Design including:
a.
Description and comparison with prior designs b.
Pipe breaks outside of containment c.
Main Steamline Isolation Valve effectiveness d.
Hydrogen control e.
ECCS {any proposed improvements) 3.
Radwaste Control including:
a.
Calculated accident doses b.
Radwaste handling systems c.
Environmental Surveillance 4.
Manpower and Staffing (including recruitment, training, and periodic review of performance) 5.
Security Plans and Design Features to Preclude Successful Industrial Sabotage 8oth the Staff and the applicant should be prepared to answer questions on topics, and items may be added to or deleted from the above list at the discretion of the Acting Subcommittee'Chairman.
i'ls