I1EET I(lb SU'111ARY ggy, 18 1978 ocket 1 i le I;RC rDR Local PDR TIC t1RR Reading L:, R
.-.1 r.i 1 r-E.
Case D
0'ostd R.
De:Gong D. Vassalln J. Stolz v
V~niel n.
Pa "
c
'L la
~
I C) p 1'op D. Crot;cr,=iel".
1illi -'s R. 11attson H.
Denton D. I'ol 1 ei.
Pl'oject.'anager:
Attor ney.
ELD
-". Hyl?~n IE {3)
IlCRS i'IG)
L. Drel.er l'RC Particinafits:
S.
RUI'ienstgin
If
r y,s REC(
0 ca 1+
vA'll'X
+**++
UNITED STATES NUCLEAR REGULATORV COMIMISS WASHINGTON, D. C. 20555 IgN ] 8 578 Docket Nos. 50-358, 50-387, 50-352/353, 50-367, 50-373/374, 50-388, 50-410, 50-322 APPLICANTS:
Members of Mark II Owner's Group
SUBJECT:
MEETING MITK MARK II OWNER'S GROUP AND GENERAL ELECTRIC COMPANY ON MARK II CONTAINMENT -
DECEMBER 14, 1977
~Bd:
During the staff's review of the Mark II generic program a number of questions were raised by the staff relative to dynamic load com-binations.
The purpose of this meeting was to discuss draft questions which would later be finalized and sent to the owner's group.
An attendance list is attached.
~Summa r:
The draft questions were discussed for the purpose of clarification and understanding on the part of the owner's group.
There was a
discussion of how various loads that contribute to overall piping loads were handled.
The group stated that direct hydraulic loads were applied using a time history method'ut that loads induced by building excitation were applied using the response spectra method.
The staff felt that this was acceptable.
It was pointed out by the group that building induced loads were of the same order of magnitude as earthquake loads.
There was a discussion of damping factors as a function of stress and when it is appropriate to use OBE vs.
SSE allowable values.
The group felt that SSE allowable values are appropriate when OBE plus dynamic loads are high.
The staff felt that the group had notjustified the 15% peak broadening of the response spectra for building induced loads.
The staff wants quantitative proof that uncertainties in the excitation are equal to 'or less than for earthquakes.
The staff requested the group to provide a basis for assumptions used in combining closely spaced frequencies of excitation.
The group stated that sloshing loads are minimal and insignificant for pool dynamics.
The staff wanted to know where in the DAR seismic sloshing loads are discussed but this subject was outside the scope of this meeting.
. The staff plans to submit the requests for information to the owner's group formally.
I. Peltier, Project Manager Light Water Reactor Branch No.
1 Division of Project Management
f'g
JAN 18 1978 8
Mar k. II Owner's Meeting 1Z/14/77 S/C Load Combinations and Acceptance Criteria C. Anderson P.
Chen K. Wichman F. Rally L. Nieh H. Chau(MKII, Rep.)
E. NcFarland(TSC Rep.)
=M. Fakelmann K. Hazidotis F. Hussain L. Memula S. Tagent J. Martin S. Mucciacciaro K. Herring S.
Hou F. Schauer H. Johnson G. Kitz T. Martin J.
ludand NRC NRC NRC GE SIl,W Long Island Lighting Co.
.,Bechtel Burns 8
Roe Inc.
'GE GE Bechtel Nuclear Sarries GE SSW NRC NRC NRC Ebasco Services S&L NUTECH NRC
I'~