Letter Submitting a Motion for Correction of Transcript, Proposed Findings and Conclusions, and a Motion Requesting the Expedited Effectiveness of the Board'S Decision in the Matter of Niagara Mohawk Power Corp
ML17037B794
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/01/1965
From: Eric Thomas
LeBoeuf, Lamb & Leiby
To: Bond J, Kirschbaum A, Nyer W
Lawrence Radiation Lab, Phillips Petroleum Co, US Atomic Energy Commission (AEC)
References
Download: ML17037B794 (22)


Text

LEBOEUF. LAMB 8 LEIBY I82I JKFFKRSON PI ACC. N.W.

WASHIHOTON 36. D.C.

ARVIN C. UPTON QOCNC I5 THOHAS, JR.

~

ON 4 CHA4C HANHATTAN P5AZA wksHIHOTOM eAeveee5 N CW YON K 5. N.Y.

pebruary 1, 1965 J'. D. Bond, Esq.

Chairman, Atomic Safety and Licensing Board U. S. Atomic Energy Commission NasM.ngton, D. C. 20545 5

Dro Albert Z. +rschbaum Lawrence Radiatfori Laboratory Livermore, California Nr. Warren E, gyer ~ P Nanager, Reactor Prospects Atomic Energy Division Phillips Petroleum Compa~

Idaho Falls, Xdaho

. Iq the Natter of Niagara Docket No Mohawk Pcmer Corporation

)

/

/-

Xn accordance with the agreements reached at the 3~@

gyp ch the above-ceptloned proceed~ cpplicaiIt heeebp ooI53L50 Cho following documents',

Not5.on for Correction of Transcripts Proposed Pindings and Conclusions together >4th a memorandum Brief in support of certain ihts which were the subject matter of special by the Board Also enclosed is a motion requesting tho cegeQite8 effectiveness of this Board's decision in this proceediag, Xn accordance with the order contained in Mm gstioe of Hearing, Applicant has filed twenty (M) copies of eoch og foregoing documents with the Commission on this date As c9~

attached Certificate of Service, Applicant has also servo@ the bp'he pex sons named therein, Very truly pours, RecId Off. Dir. of Re@.

I'=te M=a=C.g gp, ~ /s/ EQgQhc 3, Thomas, W, T Iree 8sth Eugma So Shamash Zx'

UNITED STATES OF AMERICA ATOMIC ENERGY COMMISSION In the Matter of NIAGARA MOHAl'K Docket No. 50-220 PONER CORPORATION CERTXFICATE OF SERVICE X hereby certify that a copy of the attached let;ter to the members of the Atomic Safety and Licensing Board and copies of each of the documents referred to therein were served upon the following persons by deposit in the U. ST mail, first class and postage prepaid, this 1st day of February, 1965.

Maurice Axelrad, Esq. John L. Catalan, Esq, New York State Office of Atomic Counsel 8c Space Development Atomic Energy Comtission 230 Park Avenue Regulatory Staff New York, N. Y. 10017 United States Atomic Energy Commission Honorable Alfred R. Qoewey Mashington> D, C, 20/45 Supervisor, Town of Scriba Ro Do 1 Oswego, New York 13126

/s/ Eugene B, Thomas~ Jr, gene ~ orna s, r.

LeBoeuf, Lamb 8c Leiby Attorney for Applicant Reed Ofi Dir of 1eg Date Tlllle Beth,

UNITED STATE OF AMERICA ATOMXC ENERGY COMMISSION Xn the Matter of Docket No. 50-220 NXAGARA MOHAWK POWER CORPORATXON MOTION FOR CORRECTION OF TRANSCRXPT Appl1cant hereby moves the Atomic Safety and Licensing Board to issue an order making the following corrections in the hearing transcript of the above-entitled proceeding:

~Pa e Line Delete Substitute 3 13 "int roduce" "enter" "introduced" "entered" 12 delete "t;o conduct,"

15 "County" "Town" II 24 age ncyn II AEC II If and tt If as aft lt has tt II have It "that Mr. Axelrad is here IIMr. Axelrad, who is and he can here, can" 8 "ascerta1n to" "ascerta1n from" 13 app11cation applicant" 24 "researched" "researched this" 1O 8 "who" ".which" "involved," "involved are" IIRe smanft It 9 Dresdenf'in 14 "as to its" the issue on"

' II

~Pa e Line Delete Sub stI,tut e 10 15 "Yankee and" "Yankee,"

tl 50 92 tl "50-29" 17 're'7 "were"

", construct" "and construct" 22 delete "at" 23 "consolidated" "Consolidated" ll 2 tlistl II psll "reactor:" "reactor?"

"Stone-webster" "and Stone-Mebster" 13 "design" "desIgn and" II 17tl II 1 7 23QII 21 "design " "desIgn and" 12 8 precedencett "precedents" It Intt II at ll 14 9 "Include" "Include in" 10 Itoftt "of that i.ssue ~the" ttcontractor tr "contractor'"

delete entire line 16 "meteorology, In fact," "meteorology, are complete. In fact, the II frOmtl II In II "function" tt functionedtt tt applicable tt IIApplicable tt ll It 5Q35 II 50 35 II "applicant" "the applicant"

~Pa e Line Delete Substitute 16 17 >>more than>> "more" 18 >>provision>> "provisional" 19 >>permit, the regulate.one ermit. The regula-Paragraph B>> tion, paragraph b>>

>> 5p351t >>5P 35>>

17 2 20 >>and>> >>

aS lt

>>3.963/ written>> >>dated 1963>>

>>them>> >>t I 10 >> one>>

you 19 ha "have the f'orce of a" 25 12 ltaStl "by'applicant 26 22 so...distributed, "since the Staff dis-

~>> tributed its analysis."

30 16 >>further>> "later" 33 11 "ease" "for ease" 35 15 >>this>> >>its>>

19 "this generating station>> "generating stations" 36 15 >>ltneology >>ltmnology>>

17 >>Point. The" "Point, the" 19-20 "water discharging>> "the water disoharged" 25 "affluents>> "effluents" 37 2 >>sitology>> >>seismology>>

7 >>a>> >>

the tl 10 >>muoh>> "much would lee>>

17 "charge" "of design and oonstruction" 38 1 "eall" use

~Pe e Line Delete Substitute 39 4-5 "panels . ~ " "panel. This is notj as in other cases, a turn key progectf Here Niagara Mohawk is re-sponsible for certain things and OE is re-sponsible for certain things" "The" "On the" 40 Chat" As "interested in" yeti'interested in certaIn" "them" "areas" ll answers. II

~ ~ "answers Co the ques-tions that you asked."

13 tt inll is in 42 16 area "various areas and" 43 16 It if tt tl

~ tl "them" "it could examine them as individuals and" 47 ll "show" "show Chat" 48 3- ttaS'll ttifII 49 "comments" "documents" "November..." "November 14, 1964 letter frcm the staff" 50 18 "October" "December."

8 delete "schedule" II 54 271 5 II "2,715 of Che" 16 delete "while" 17 delete "thosej" 57 25 tlmay b e II Ilistl "have" aVett

\ 'I t I

~ v

'0

~pa e Line Delete Substitute 59 2 >>of >> >>it is>>

3 "contracts>> "the contract>>

61 12 "necessary that necessary'4 delete >>I also" "precedence" >>precedents>>

ff Joselt >>enofre>>

65 provisional>> "division of" 66 7 delete "oCher" 70 17 >>the axea>> ff~hy>>

18 ~

delete >>they did.>>

19 >>

~here II "a second, Where>>

20 "efforts. As" >>efforts, for" 21 "fact as" >>facts as to" 11 6 ut 96 10 >>essentially>> "especially" 98 6 "this procedure>> >>this proceeding" Xnsert >>proper>> before

>>perspective>>

99 21 >>notified us and>> "issued a notice of hearing and>>

100 2 "specifications>> >>qualifications>>

12 "vrl11" "would" Delete first >>of>>

101 10 >>authority>> "hearing" r

Il 12 50 34ll >>

50 3$ tl 102 3 insert >>provisional" between "usual" and

>>construction>>

1

~pa e Line Delete Substitute 102 "to this" ttthell 8 "three issues" "first three issues" 103 16 "facilities" "facility" 105 "application" tt application andtt 150 14 "this, They" this unless they 24 "advise" "advice" 153 13 Insert "a" after "Engineex; and" 16 tta document "the docket number" 17 "which" "and which" 150 1 "system facilities" "system gas facilitiee" 156 2 "e~bit" "exhibits" "production" "construction" 158 18 1!andll llintl 20 Insert "item" after "that"

~sert "it" after "then" 11 6 PN 160 ttof tl "and" "accompany" "accompanied" "and" tlofll 162 13-14 "correction" "creation" 163 "record" evidence of recozd" 165 tlretl regarding" 166 "megawatts" "kilowatts" 167 nyoun 169 insert $ 11,000,000 or" after "and"

0 II j

~Pa e Line Delete Substitute 171 1 "the nuclear plant" Insert >>experience>> after >>this>>

7 >>it is>> >>this plant is>>

Insert >>in>> after >>put>>

17'74 7 Insert >>who>> aftex tt~ and>>

baal 176 15 Delete "one" 177 20 Insert >>it>> after>>include>>

178 Delete >>of beyondtt tl t 195 9 tlplat It "plant" 196 17 "the>> tt in tl 199 2 >>planned>> lt pl anil 202

>>Indefinite>> "Indefinitely" 20' "or .8 power value" "at 0.8 power factor" 19 >>automatic>> "automatically>>

206 14 Insert "of" after "amount" 207 7 >>this>> "there" ete >>air>> aftex, >>txapped>>

Il On tt tti >>

208 Delete >>there>>

209 2 >> andtl lt~~>>

Delete comma after "value" 18 >>p 58tt >>In-g8 20 "level reactor>> "reactor water level" "mainstream" >>main steam"

~pa e L1ne Delete Substitute 210 23 "safety" II Saf elf 213 1 "non-radioactivity" "non-radioactive" I'there" II airll "radioactivity" "radioactive" "Part 20 minutes" "10 CPR Part 20 limits" 13 "to one-thousandths" "1-thousandth" II 100ll II 20II 25 "this" lf the II 214 "on the stack" "for the off-gases" II o nil "from" 216 7 lllowll "local" 217 8 "limits" "limit" "coolant power" "overpower" 1 20 6 AM 225 7 Delete the comma after "reactor" 229 12 Insert ", one" after "lines" 230 22 "changes" "change is" 232 24 "have maintained" "hope to maintain"

'I "value" Canll "have" 20 "operate" "operated" "its pressure" "the suppression" 25 Insert "suppression" after "pressure" 241 9 "80-Cr,-1130" 1130II 17 Delete "an" 24 "a mine safety appliance IIthe Mne >afety company Appliance Company"

~Pa e Line Delete Substitute 244 9 insert <<and<< ~ft~r <<source 245 8 <<scale<< "scales" 14 >>on<< II inll 246 12 while th "area, in>> "area. In>>

power of 15 "exposure of 15,000>>

247 1 ray "Mr. Trocki>>

"procedure" "procedural" 249 specific gas and <<-Pacific Gas 5 electric as" Electric has<<

251 25 >>strain assumes" "strength assume" 254 5 Insert "control" after "flow" 260 19 Insert "of" after <<.2>>

26> lg lll 5<< <<0 5<<

Insert "total>> before "dose" 264 4 cleaner'0

>>10 1<< 1<<

"plenum" 265 . 20 Insert <<that<< after >>realize 266 2 "floods" >>flux<<

"ratings" "range" 268 24 "could" <<should>>

270 4 >>

cores << "case" 15-16 >>mainstream<< >>main steam" 271 5 <<after>> "reactor" 274 10 Insert >>psi>> after >>150>>

278 15 "their>>

279 5 <<fabricationer>> <<

fabricater>>

I

~Ps e Line Delete Substitute II 283 1 tl 1( wit flown 285 22 Xnsert "for" before "those" 3O4 18 tlfOroe tl 19 Xnsert "to be forced" after "likes" 3o6 24 "have" "hear" 320 11 "THOMAS" "UPTON"

~121~6 II OVerlt 339 13 "coolant Delete the comma after components and Chen "mayor" 14 "component s" "criteria" 394 13 IIB ard II IIBarlt 4O6 Ilas II tlis tt 18 II appli cationlt "resolution" 407 10 "this" after "have" tlitII 424 8 "comm" "THOMAS" Respect fully submit ted, NXAQARA MOHAWK POWER CORPORATION By /s/ Bugene B. Thomas, Jr.

ene . mas,

/s/ James A. Greer, XX ames . reer, Xts Attorneys Dated: Pebruary 1, 1965 Counsel:

LeBoeuf, Lamb h Leiby 1821 Jefferson Place, N.W.

Washington 36, D. C.

One Chase Manhattan Plaza New York 5, New York

0"