MONTHYEARIR 05000333/20240902024-10-29029 October 2024 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000333/2024090 IR 05000333/20244022024-10-28028 October 2024 Material Control and Accounting Program Inspection Report 05000333/2024402 (Cover Letter Only) ML24276A1332024-10-17017 October 2024 Issuance of Amendment No. 357 Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision-4, and Administrative Changes ML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 ML24282B0302024-10-11011 October 2024 Project Manager Assignment RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24207A0192024-10-0909 October 2024 SE Addendum Related to the License Amendment No. 338 for Implementation of the Alternative Source Term (DPO-2021-001) NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing JAFP-24-0051, Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-0882024-10-0303 October 2024 Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-088 ML24270A0742024-09-30030 September 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0134) - LTR ML24270A1452024-09-26026 September 2024 Notice of Enforcement Discretion for James A. Fitzpatrick Nuclear Power Plant ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation JAFP-24-0046, Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation2024-09-25025 September 2024 Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation JAFP-24-0047, License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software2024-09-25025 September 2024 License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software JAFP-24-0045, Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2024-09-20020 September 2024 Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000333/20240112024-09-19019 September 2024 Follow-up to Inspection Procedure 71153 Report 05000333/2024011 and Preliminary White Finding and Apparent Violation JAFP-24-0044, Core Operating Limits Report Cycle 272024-09-16016 September 2024 Core Operating Limits Report Cycle 27 JAFP-24-0043, Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues2024-09-12012 September 2024 Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 05000333/LER-2024-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation2024-09-0404 September 2024 Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation ML24165A0382024-09-0404 September 2024 Issuance of Amendment No. 356 Update Fuel Handling Accident Analysis IR 05000333/20240052024-08-29029 August 2024 Updated Inspection Plan for James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2024005) IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 05000333/LER-2024-001-01, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-08-21021 August 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000333/20240022024-08-0707 August 2024 Integrated Inspection Report 05000333/2024002 IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML24213A1412024-07-31031 July 2024 Requalification Program Inspection JAFP-24-0034, 10 CFR 50.46 Annual Report2024-07-31031 July 2024 10 CFR 50.46 Annual Report ML24208A0492024-07-30030 July 2024 Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Proposed No Significant Hazards Consideration Determination (Letter) JAFP-24-0036, Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-07-29029 July 2024 Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations JAFP-24-0033, Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test2024-07-23023 July 2024 Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test IR 05000333/20244032024-07-18018 July 2024 Biennial Problem Identification and Resolution Inspection Report 05000333/2024403 (Cover Letter Only) ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000333/20244012024-07-15015 July 2024 Security Baseline Inspection 05000333/2024401 RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24190A1932024-07-0909 July 2024 Correction Letter of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance IR 05000333/20240102024-07-0808 July 2024 Commercial Grade Dedication Inspection Report 05000333/2024010 ML24184A1662024-07-0303 July 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24136A1162024-06-26026 June 2024 Issuance of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance 05000333/LER-2024-001, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-06-24024 June 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket 2024-09-04
[Table view] |
Text
e c
April 15, 1974 Dr. Max vin Resnikoff 174 Nest Avenue Buffalo, New York 14201 In the Matter of Niagara Mohawk Power Corporation (Nine Mile Point, Unit No. 1)
Docket No 50-220 AND In the Matter of Niagara Mohawlc Power Corporation (Nine Milo Point, Unit No. 2)
Docket No. 50"410 In the Matter of Power Authority of thc State of Ncw York and Niagara Mohaw'k Powex'or pox ation (James A. FitsPaMck Nuclear Power Plant, Unit 1)
Docket No, 50-333
Dear Dr. Rcsnikoff:
Your letters dated February 12, 1974, and April 2, 1974, addressed to Mr.
Jan A. Norris have been referred to mc for reply. These letters generally concern thermal discharges to Lake Ontario &om the three referenced facilities. The April 2nd letter also xefcrs to a letter from you to me dated Januaxy 27, 1974, which requested information concerning the "pxocedux e for the submission on t;your] part of a letter to the ABC Regulatory Staff as a form of limited appearance on behalf of Ecology Action with regard to the [construction permit application for Nine Mile Point, Unit 2j ". Unfox tunately, I have just obtained a copy oi your Tatter. While it was received in the General Counsel's office on January 30, 19?4, for unknown rcasoxls, a copy was not made available to me at that ORRICC 3e SURNAMCW OAT C ~
Porn hEC-3 lb (Rev. 0 33) hEChf 0240 ORO C40 11 111480 1 020 244
f h f,
,< P I ~
1 l
4J P
il' 8
'I L '
d
'J l
II f
I see i
a a
Dre Max vin Resnikoff time. Although the record relating to that portion of the Nine Milo Point,
.Unit 2, facility which you seek to addxess in your several letters was closed well before the Qrst of January, I am forwax ding copies of them and of this reply to the presiding Atomic Safety and Licensing Board, in whose discretion limited appearance statements aro received, fox such disposition as it may wish to make of your letters. Fox your futuro information, however, I am enclosing a copy of 10 CFR Part 2 which constitutes the Commission's Rules of Practice. Section 2.715(a) rclatcs to limited appearance requests.
As you may know, the AEC Regulatory Staff (Staff) prepared Draft and Final Envixonmental Statements (DES-PES) in connection with, each of the referenced proceedings. Pursuant to Commission regulations, notices of availability of each DES were published in the Federal Register, The notices requested comments from interested persons, In addition, each DES was sent to appropriate federal and state agencies for comment, Comments received Rom fedcxal-and state agencies and intex ested members of the public, and the Staff's responses thexcto, wore included. in the FES for each facility. To my knowledge'the Staff did not receive any timely comments from you with respect to any of the threo draft statements.
While the Staff welcomes youx interest, I am advised that they have already addressed the points raised by you in your letters, with one exception, in thc respective Qnal statements and/or at the evidentiary hearings held in the Fit@Patrick and Nine Mile Point, Unit 2, proceedings. The one enceptton ts, of course, tits pro~eood Envtronmentcl Protectton Agency (EPAl Regulations appearing at 39 F. R. 8294, March 4, 1974. In, this xegard, once these regulations are Qnalised by P2'A, Applicants in the three proceedings will, of course, have to meet the requirements of those regulation .
For your infox'mation, it might be well to review thc present status of each of the three proceedings.
Nine Mile Point, Unit 1 The applicant seeks a full term operating license A hearing is not manda-toxy and there werc no requests for a hearing. The Staff's environmental review is completo and the action recommended, in the FES is issuance of a full term operating license appropxiately conditioned to protect the environment (Sec pages iii-v of the NMPl FES) . Upon completion of the Staff's radiological health and safety review, if appropriate, a full term operating license, ap ro-c, wx e xs~ uo toget cx arith environm ntal and oPFlclx3a 'olagical..tech cal..dpcci64:at ons'--------------.
SVIINAME ~
OATE3s'orm CPO C43 'Id 81488 I 820.284 hEC.31S (Rev. 9.53) hECM 0240
~9 h
J
Dr. Marvin Rosnikoff James A. FitzPatrick Nucleax Power Plant The applicant seeks an. operating license. An Atomic Safety and Licensing Board has authorized the Staff to issue the license with appropriate environmental and radiological health and safety conditions. The Licensing Board's decision has been affirmed by the Atomic Saf'ety and Licensing Appeal Board with slight modifications which x elate to conditions imposed, pursuant to Section 401(d) of the Federal Water Pollution Control Act Amendments, by the State of New Yoxk. Since construction at the facility is not yet totally complete, the Staff has not yet issued an operating license. Environmental and radiological technical specifications have been prepared by the Staff and will be a part of any, operating license xssued, Nine Mile Point, Unit 2 The applicant seeks a constxuction permit. Lengthy hearings have been conducted and the record is closed. The parties to this proceeding axe awaiting an initial decision from the Atomic Safety and Licensing Board.
Pursuant to the request contained in your letter of January 27, 1974, I enclose copies of Sections 2.5, 2.6, 3.1 through 3.4, and 10 of Applicant's Envixonmental Report for Nine Mile Point, Unit 2,- and of accompanying tables.
Finally, you have xequested copies of two documents (pago 2 of your letter dated Febxuaxy 12, 1974) . I do not have copies of these documents. How-evor, they should be availablo for your review eithex at the Commission's Public Document Room in Nashfington, D. C., or in the local Public Document Room at the Oswego, New York, Public Library. In the alternative, I suggest that you contact either counsel for the Applicant ox counsel for Ecology Action.
Sincerely, Bernaxd M. Bordenick Counsel for AEC Regulatory Staff
Enclosures:
10 CFR Part 2 Sections 2.5, 2.6, 3.1- 3.4, an8 10 of ER for NMP2 and tab 2D~1 A<<W .;...........(ROC..Pag OAT 2W Form hECP18 (Re@. 9 53) hECM 0240 OPO C42 111 81AI2.1 020.204
ii r
r I
err, a ii <<
I
~ J r ~
~ r 0
l r il I
ir r'
'r
Dr. Marvin Resnikoff cc w/o enclosures Daniel M. IIead, Esq., Chairman Dr. Marvin M. Mann Dr. William E. Martin Zoseph F. Tubridy, Esq.
Gustave A. Linenberger Z. 'Bruco MacDonald Arvin H. Upton> Esq, Eugene.B. Thomas, Zr., Esq.
James P, McGranery, Zr., Esq.
Edward Berlin, Esq.
Ecology Action c/o Richard Goldsmith Ms. Suzanne Weber Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Board Mr. Frank W. Karas DISTRIBUTION:
Bordenick Cohen Carr Mas sar Gallo Engelhardt Shapar Formal Files (2)
OGC Files G'town/Bethesda Reg Central PDR LPDR EP G. Dittman J. Norris DL A. Bournia J. Snell OFQIC2~
,8U11NAM2 W OATC~
Form hEC 318 (Rev. 9.S3) hECM 0240 r( ~
02O C43 18 81488 1 820 284
~~o I fl M
'l 1I
~ w
April. 8, -1974
'r, Daniel N. Head f'Jr. Frederick J. Shon Atomic Safety 8 Licensing Board Atomic Safety 8 Licensing Board Panel Panel U. S., Atomic Energy Commission- U. S. Atomic Energy Commission tlashington, D. C, P054$ Mashington, D. C. 20545
.Hr, Sidney G. Kingsley Atomic Safety 8 Licensing'oard Pane)
U. S. Atomic Energy Commission lfashington. D. C, 20545 In the, Natter of Niagara Mohawk Power Corporation Nine Nile Point, Unit No. 1 .
Docket No. 50-220 Gentlemen:
Enclosed beret,>ith is the letter from the Ne~ York State Atomic Energy Council confirming the Staff's .understanding, as reflected in its March 27 response to the Counci'I's Petition for Leave to Intervene in the above-captioned proceeding, that the State wishes to participate in this proceeding only if the Commission orders a hearing and that the Petition is not intended to be a request for a hearing.
Sincerely, Roy E. Kinsey, Jr.
Counsel for AEC Regulatory Staff
Enclosure:
As stated Distribution:
OGC Files, Beth/G'town cc: Mr. C. J. Clemente Chron File To Those of Service List Reg. Central PDR LPDR FF - 2 OGC OFFICE RKinsey:ldm SVRI4AME >
4/8/74 DATE V Foan AEC-318 (Rev. 9'S3) AECM 0240
'3 '
~ UU i
"'1 I
~ -I U(4 '3 U 1' 3 1 I 1
e e I
I I U
h UIV
<< ~
~ e le I VV I 'I 3 I Ih V
VI 3 Ul n ~ ~
<< C, 3 S' U U 3
J 3