Letter Submitting the November 1977 Operating Status Report
ML17037B729
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/06/1977
From: Schneider R
Niagara Mohawk Power Corp
To:
Office of Nuclear Reactor Regulation
References
Download: ML17037B729 (7)


Text

NBC FORM,195 (2 76)'RC DISTRIBUTION FoR PART 60 DO U.S. NUCLEAR REGULATORY COMMISS DOCKET NUMBER CKET MATERIAL IeNTHL TO:

N>> R>>

C>>

BETTE R

~RCOR IGINAL 0 COPY QNOTORIZED r8t5NCLASSIFIE D PROP INPUT FORM FROM:

Niagara Mohawk Power Corp>>

Syracuse, New York R>>

R>> Schneider DATE OF DOCUMENT 12/06/77 DATE RECEIVED 12/12/77 NUMBER OF COPIES RECEIVED DESCRIPTION Letter trans the following:

ENCLOSURE Month+ Report for November 1977 Plant 8o Component Operability 8o Availability.

This Report to be used in preparing Gray Book by Pland h Operations.

PLANT NAME: Nine Mile Point Unit No.

1 RJL 12/13/77 MIPC 8

S FOR CTI N FOR ACTION/INFORMATION INTERNALD RI BUTION IST nc e

C SS EXTERNALDISTRIBUTION CONTROL NUMBER 773470019 RC FORM 196 (2-76)

8N()III)'OBALf IP)'MP-0098 NIAGARAMOHAWKPOWER CORPORATION/300 ERIE BOULEVARDWEST, SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-1511 NfLe&ofl, 0$ (me o) Management ln(otuIIatian 8 Pkogtuun Coetkol 0~ed S~u NucZea/1. Regulatory Commh a~on 0fa5hing&n, 'P.C.

20555 Seeembee.

6, letg e-

<~<i/j~

e l~en4roR~

]p RE:

Sock& No.

50-220 GmtEemen:

Sub~ed he/1.ev~ Le She Oping S~as RepoM (oa We moetk o) Novembe/1.

1977 Iso/L She one i%Le Po~ NucL~ S~n Unapt <l.

Ve/Iy~y gouhh,

. Schneide/I',

V~ce Peu&eet-EZe~c Paodu~n Enc.

xc:

'D~mto/L, ISE (10 cop~u)

NRC Regin 1 0(g.ce (1 copy)

NlNi'. HLL>L'Olill7. BUGLE<< STAYXO.'i NTAGARA 4440'(.'Gl4'OVER COBPQl44liXO'3 AVI.IKAGL:YILYU)%T PQWEI( LEYEL DOC@ I=7 WO. 50-22'0 UiJIT Nine Mile Point Unit 1

'AfE CO4IPl.FTL:D Dy TELEPHONE T.J. Perkins l',315) 343-2110,

~

'xt 1312

~.IQ~ pqI November 601 602 DAY AVERAGEDAILJ'QNER LEVEL

('MV(e-N t) 600 606 608 c3 12 1

~

gO 602'01 351 492 497 603 593 20 21 22 23 26 2?

30 31 607 605 606 608 610 608 610 587 226 434 517

~ 44 44 4 g44'p

[4

'~l 4 "44S 4.

i

~

ek 4

~'PPENDIX C

OPERATING DATA REPORT DOCKET NO.

50-220 Nine Mile Poi ni,t 1 DATE 12 05 77 COMPLETED BY TELEPHONE 343>>2 ext.

1312 OPERATING STATUS

1. REPORTING PERIOD:

GROSS. HOURS IN REPORTING PERIOD:

2. CURRENTLY AUTHORIZEDPOWER LEVEL (MWt): '850 MAX. DEPEND. CAPACITY (MWe Net):
3. POWER LEVELTO WHICH RESTRICTED (IF ANY) (MWe Net):
4. REASONS FOR RESTRICTION (IF ANY):

S. NUMBER OF HOURS REACTOR WAS CRITICAL THIS MONTH YR TO DATE CUMULATIVE 50 324.9

6. REACTOR RESERVE SHUTDOWN HOURS
7. HOURS GENERATOR ON LINE
8. UNIT RESERVE SHUTDOWN HOURS
9. GROSS THERMALENERGY GENERATED (MWH)
10. GROSS ELECTRICAL ENERGY GENERATED (MWH).
11. NET ELECTRICAL ENERGY GENERATED (MWH)
12. REACTOR SERVICE FACTOR
13. RCACTOR AVAILABILITYFACTOR
14. UNITSERVICE FACTOR 0

16.2 1 204.2 556.05 4429.3 43 435.05 81

'57 40

57. 6) 55 ~ 31

~ees 7 83~4~8 13 335 988 2 ~44218

16. UNITAVAILABILITYFACTOR
16. UNIT CAPACITY FACTOR (Using MDC)
17. UNIT CAPACITY FACTOR (Using Design MWe)
18. UNIT FORCED OUTAGE RATE 77
3. 3' 55.3

'-51 2

. 51I2 67.7 11.5

19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATIONOF EACH):

May 28;, 1978 Snubber'nspection

20. IF SHUT DOWN AT CND OF REPORT PERIOD, ESTIMATEDDATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIALOPERATION):

FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION 1.16-9

E V

gl

~ ~

0 '0

~ ~

0 ~

~ '

~

~

0

~

~

~

~

~

0 0

~

~

~

j

~

e

~

o

~ I ~

~ ~

0 g

Q ~

~ 0

~

e 0

~

I 0 0

~

0

~

~

~

~

RFc~lVr() 00CIJt1EHT

'"'Rl',lG OHIT O'

~

)

od

~

~

V "t

9(l Dh, l2 AM I'