ML17037B729

From kanterella
Jump to navigation Jump to search
Letter Submitting the November 1977 Operating Status Report
ML17037B729
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/06/1977
From: Schneider R
Niagara Mohawk Power Corp
To:
Office of Nuclear Reactor Regulation
References
Download: ML17037B729 (7)


Text

U.S. NUCLEAR REGULATORY COMMISS DOCKET NUMBER NBC FORM,195 (2 76)

'RC DISTRIBUTION FoR PART 60 DO CKET MATERIAL IeNTHL FROM: DATE OF DOCUMENT TO:

Niagara Mohawk Power Corp>> 12/06/77 N>> R>> C>> Syracuse, New York DATE RECEIVED R>> R>> Schneider 12/12/77 QNOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED BETTE R

~ RCOR IGINAL r8t5NCLASSIFIE D 0 COPY DESCRIPTION ENCLOSURE Letter trans the following: Month+ Report for November 1977 Plant 8o Component Operability 8o Availability.

This Report to be used in preparing Gray Book by Pland h Operations.

PLANT NAME: Nine Mile Point Unit No. 1 RJL 12/13/77 FOR ACTION/INFORMATION MIPC 8 S FOR CTI N INTERNAL D IST RI BUTION nc e C SS EXTERNAL DISTRIBUTION CONTROL NUMBER 773470019 RC FORM 196 (2-76)

8N()III)'OBALf IP)'MP-0098 NIAGARA MOHAWK POWER CORPORATION/300 ERIE BOULEVARD WEST, SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-1511 Seeembee. 6, letg e-

<~<i/j~

NfLe&ofl, 0$ (me o) Management ln(otuIIatian 8 e l~en4roR~

Pkogtuun Coetkol ]p 0~ed S~u NucZea/1. Regulatory Commh a~on 0fa5hing&n, 'P.C. 20555 RE: Sock& No. 50-220 GmtEemen:

Sub~ed he/1.ev~ Le She Oping S~as RepoM (oa We moetk o) Novembe/1. 1977 Iso/L She one i%Le Po~ NucL~ S~n Unapt <l.

Ve/Iy ~y gouhh,

. Schneide/I',

V~ce Peu&eet-EZe~c Paodu~n Enc.

xc: 'D~mto/L, ISE (10 cop~u)

NRC Regin 1 0(g.ce (1 copy)

NlNi'. HLL>L'Olill7. BUGLE<< STAYXO.'i NTAGARA 4440'(.'Gl4'OVER COBPQl44liXO'3 AVI.IKAGL:YILYU)%T PQWEI( LEYEL DOC@ I=7 WO. 50-22'0 UiJIT Nine Mile Point Unit 1

'AfE CO4IPl.FTL:D Dy T.J. Perkins TELEPHONE l',315) 343-2110,~

1312'xt

~.IQ~ pqI November DAY AVERAGE DAILJ'QNER LEVEL

('MV(e-N t) 600 601 606 602 608 607 602'01 20 21 605 22 606 23 608 610 608 c3 610 26 587 2?

12 351 226 492 434 ~ 44 497 30 517 1 ~

603 31 gO 593

[4 '~lg44'p 44 4 4 "44S 4.

i ~ ek 4 ~

'PPENDIX C OPERATING DATA REPORT DOCKET NO. 50-220 Nine Mile Poi ni,t 1 DATE 12 05 77 COMPLETED BY TELEPHONE 343>>2 ext. 1312 OPERATING STATUS

1. REPORTING PERIOD: GROSS. HOURS IN REPORTING PERIOD:
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): '850 MAX. DEPEND. CAPACITY (MWe Net):
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net):
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE S. NUMBER OF HOURS REACTOR WAS CRITICAL 50 324.9

6. REACTOR RESERVE SHUTDOWN HOURS 0 16.2 1 204.2
7. HOURS GENERATOR ON LINE 556.05 4429.3 43 435.05
8. UNIT RESERVE SHUTDOWN HOURS
9. GROSS THERMAL ENERGY GENERATED (MWH) ~ees 7 83~4~8 13 335 988
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) . 2 ~44218
11. NET ELECTRICAL ENERGY GENERATED (MWH) 81 '57 40
12. REACTOR SERVICE FACTOR
13. RCACTOR AVAILABILITYFACTOR 57. 6)
14. UNIT SERVICE FACTOR 55 ~ 31
16. UNIT AVAILABILITY FACTOR 77 55.3 67.7

'-51

16. UNIT CAPACITY FACTOR (Using MDC) 2
17. UNIT CAPACITY FACTOR (Using Design MWe)

. 51I2

18. UNIT FORCED OUTAGE RATE 3. 3' 11.5
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

May 28;, 1978 Snubber'nspection

20. IF SHUT DOWN AT CND OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIALOPERATION): FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 1.16-9

E V

gl

~

~

0 '0

~ ~

0~ ~ ' ~

~ 0

~ ~

~ ~

~ I ~

~ ~

0 ~ ~ ' 0 g Q

~

~ 0

~ 0 ~ j ~ e

~ o

~ e 0 ~

I 0

~ 0 0 ~ ~ ~ ~

O' ~ )

od

~ ~

V "t

RFc~lVr() 00CIJt1EHT

'"'Rl',lG OHIT I'

9(l Dh, l2 AM