Letter Submitting the July 1977 Operating Status Report
ML17037B728
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 08/09/1977
From: Schneider R
Niagara Mohawk Power Corp
To:
Office of Nuclear Reactor Regulation
References
Download: ML17037B728 (8)


Text

>>

U.S. NUCLEAR REGULATORY

. ISSION NPC FDRC 195 I2 76)

NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL DOC KEQ NUMBE R Q

FILE NUMBER MONTHL R

R TO:

N>>

R>>

C>>

FROM:

Niagara Mohawk Power Corp.

Syracuse, New York R

R Schneider DATE OF DOCUMENT 8/9/77 DATE RECEIVED 8/15/77 LETTER ORIGINAL QCOPV 0 NO TO R IZ E D UNCLASSIFIED PROP INPUT FORM NUMBER OF COPIES RECEIVED

/aI DES C R IP TI0 N Letter trans the following:

ENCLOSURE Month~ Report for JULY 1977 Plant h Component Operability & Availability.

This Report to be used in preparing Gray Book by Planh

& Operations.

PLANT NAME:

Nine Mile Point Unit No 1

RJL

'/15/77 (1-P)

(3-p)

AC~0%'LEDGE 88 NQT REM~

S R

CTI N FOR ACTION/INFORMATION e

res INTERNALDISTRI BUTION rane e

c ss EXTERNALDISTRIBUTION CONTROL NUMBER 7',+7m 4'0M NRC FORM 195 I2 76)

WP-0057 NIAGARAMOHAWKPOWER CORPORATION 0~I'Sr'r, NIAGARA I~

MOHAWK 300 ERIE BOULEVARD. WEST SYRACUSE. N. Y. I3202

~Fj.Qs Cp D~e&OJL 0(gee o$ Management In(own~on 8

Paog~ Co~l 0~ed S~u Nuclem Regulatory CommLeaion 0/uMng4on,

'D.C.

20555 RE:

Sock& No. 50-220 GeetLemen:

August 9, 1977 9P 4A-u Sub~ed hetcearMhLb Che Oping S~

Repo& (oa Che moth o$ July, 1977

$oa She one NLe Po~ Nuel~ S~on Unkt <1.

VMy~y youth, R.R. Sehneidw VLee Pau&mt-Ele~e Pcodu~on Ene.

ee:

Sme&oa ISE (10 eopLss)

NRC Regin I 0(gee (1 copy)

4 I

E

APPENDIX C OPERATING DATAREPORT

, ~l-itdgCy DOCKET NO.

50-220 UNIT Nine Mile Point IIl DATE COMPLETED BY yeLspHppie(315) 343-2110 eiiL. 13)2 OPERATING STATUS

~

1. REPORTING PERIOD: 770701 770731 GROSS HOURS IN REPORTING PERIOD:

744 2, CURRENTLY AUTHORIZEDPOWER LEVEL(MWI):

1850 MAX.DEPEND. CAPACITY (tvfWe.iVes):

DESIGN EI ECTRICAL BATING (t 1(tte.Me',):

3. POWER LEVELTO WHICH RESTRICTED(IF ANY) (MiWc.Nes):
4. REASONS FOR RESTRICTION (IF ANY):
6. NUMBER OF HOURS REACTOR WAS CRITICAL THIS MOiVTH YR TO DATE

~4~

CUMULATIVF

6. REACTOR RESERVE SHUTDOWN HOURS
7. HOURS GENERATOR ON l.liVE
8. UiJIT RFSEFiVE SHUTDOWI'I HOURS
9. GROSS THERMALENERGY GENERATED (MI'VH)
10. GROSS ELECTRICAL ENFRGY GENERATED (iViWH) 11 NET ELECTRICAL ENERGY GENERATED (t1WH)
12. REACTOR SLRVICE FACTOR
13. REACTOR AVAILAOILITYFACTOR 325.9 1,815.0 45,321.8 0

0

20. 2 156,115
57. 8
57. 8 997,332
38. 0 38.3 23, 028,253 7O. 2 70.2

'15,023 3,148,'919 72,450,426 161, 557 1, 030,341 23, 768,396

14. UNIT SERVICE FACTOR
16. UNIT AVAILABILITYFACTOR
16. UNITCAPACITY FACTOR (Using hIDC)
17. UNIT CAPACITY FACTOR (Using Design MWe)
18. UNIT FORCED OUTAGE RATE 43.8 43.8 34.4 34.4 0

35.7 35.7 32.1 32.1 1.4 66.8

55. 6 55.6
12. 1
19. SIIUTDOWMSSCIIFDULCD OVER NEXT'OiJTHS (TYPE, DATE, AND DURATIONOF EACH):
20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COtlhIERCIALOPERATION)t FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMh IERCIAL OPERATION 1.16.9

I l

a NINF MILE POXNT NUCLEAR STATXON HIAG

'XOI.

AVERAGEDAILYUNIT PO>VER LEVEL DOCI rrWo.

U~qiIg Nine Mile Point /fl DATE CPyIPLETED gY T. J P<<~i>>

TELEPHgyi~E(315) 343-2110 Ext:. 1312

.'IOYTrI Jul 1977 DAY AVERAGEDAILYPOWER LEVEL

(<~Ice-Xi'et)

DAY AVERAGEDAILYPONER LFVEI'M)V'e-Net) 17 100 207 5

10 20 21 22 23

'S 27 28 30 31 285 415 497 530 542 554 554 560 572 568 543 578

NINE MILE POINT NUCLEAR STATION NIAGABA MOHAWK POKIER CORPORATION UNITSHUTDOVlNS AND PO)VER REDUCTIONS REPORT MONTH i

DOCKSTNO.~

U>gI I gp,Mp Nine Mile Point 81 DAMP 07/09/77 QOMPJpfED Qy T.J.'erkins yppEPHOgp (315) 343-2110 ext,,

1312 NO.

3/5/77 TYPE F: FORCED DURATION S: SCHEDULED (HOURS) 418.1 REASON (1)

METHOD OF SHUTTING DOSN THE REACTOR OR REDUCING POSER (2)

CORRECTIVE ACTIONS/COiVlMENTS Refueling and Annual Overhaul n

(I)

REASON A: fiQUIPMEN'fFAILURE(BX"LAIN) 8: iilhlN'f.CR 'fEST C: RE!'UELING D: RI'.GUI.ATOl<YRESTRICTION

(':. Ol'ERATOI(.TRAININGAND LICI'.NSI!I'.XhhIINA'fION I:: ADMINIS'IRAI'IVI; G: Ol'I'.RATIONALERROR (I XPLAIN)

)I: )'i'!ll'R (I:~:1'I.AIN)

(2) ii(ETHOD I: MANUAL 2: MANUALSCRAWL 3: AUTOMATICSCRAM iI: OTHER (El(PLAIN)

C Ski'MARY:

RECEIVEO 00CUHEHT PROCESSING Uf/IT i9(l AUG l5.

AM 9 I 1