ML17037B719
| ML17037B719 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 12/06/1976 |
| From: | Schneider R Niagara Mohawk Power Corp |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML17037B719 (10) | |
Text
NRG FORM 195 I2.78)
U.S, NUCLLrAR REGULATORY COMMISSION DOCKET NUMOER 50-220 TOI USNRC NRC DISTRIBUTIONFon'ART 60 DOCKET MATERIAL FROM:NIAGARA MOHAWK POWER CO.
SYRACUSE, N.Y.
, R.R.
SCHNEIDER.
~
r
'I FILE NUMBER MONTHLY REPORT DATE OF DOCUMENT 12-6-76 DATE RFCEIVEO 12-13-76 OLETTER I
. ggORIGIPAL
,CQPD' NOTOR I2 E D 6 UN C LASS IF I E D PROP
.PLANT NAME:
NINE MILE PT
//
1 DESCRIPTION LETTER TRANS THE FOLLOWING:
L h l (
I
~
IA.'I~
r".c
- MJarS, i.
INPUT FORM NUMBER OF COPIES RECEIVED 1
MONTHLY REPORT FOR NOVEMBER 1976 PLANT & COMPONENT OPERABILITY &~g,"i cc vr..;
AVAILABILITY,. THIS REPORT TO BE..USED.IN-
" PREPARING GRAY BOOK BY PLANS & OPERATIONS.
I
- >ONOT REMOVy CKNOSZ,gg)g@D
=MIPC-r GYS FO ACT ON FOR ACTION/INFORMATION SAB 12-13'~76
~-
- E ~QL
=.P.DR
.~rINTERNALDISTR I BUTION
=BRAtfdH CHIEF E
. =MAR(-.".4.
~
~
EXTERNAL DISTRIBUTION CONTROL NUMBER gO-2.2-O 12557'-
1
P J
0 0
I'I
~
~
A
%kg oty
@+CD NIAGARAMOHAWKPOWER CORPORATION NIAGARA ~I MOHAWK 300 ERIE BOULEVARD. WEST SYRACUSE. N. Y. 13202 Vecembw 6, 1976 0(gce o$ Plans 8 Schedule 8iII.ectorcate o$ License ng 0~ed S~u Nucfem Reg~orcy Comm&sion Nmhi ngton, 8.C.
20545 RE:
'Oocket No.
50-220 Gentlemen:
Submitted herI,ecith w Che Op~ng S~
RepoM (oe She month o$ November, 1976
$oa Che Nine hKEe Point Nuelem S~on Unit <1.
Vekg Muddy gout%,
R.R.
SchneideJt, Vice PaasideM-Elmttu'.c Production NS/mtm Enc.
~
+>> LL>
+Al
~
'g c '
d
...,:QA I
~
bTYE H'KLH BOOXN'E hUCLHKR STRETTO-'<
8 fhGkUA 1LQi'K. POtiE14 CORPORjhj.XOH AV1;1CAGF 0:%1LY Ujh 1 f 1 QEVER. LEVEL DOCVI:7 WO.
UNlr DATE COilPLETED DY TELEPHONE December 1,
19?6 T.
ER INS (3 5) 343-211QERt'.1312 NOVEMBER 1976 D gy yq~ER pep DAILYpONEB. LI."VHL Pl'i'-Xj'ct) 564 574 DAY AVERAGEDAILYPO)'f'Eik Lj.VEL (MÃe-Net) 530
'577 5E 586 20 587 12 13 584 584 581 578 548 0
0 0
0 200 436 21 585 587 23 584 581 577 575 2j 571 575 576 30
~ >
1 e
k t
e.
~
1
4 E HXLE POXbT NJCLEAR STATXON NXAGARK ixIOIM~V, POWER CORPORATXOR OPERATING DATAREPQFIT DOCKET NO.
50-200 761201-COKi)PLETED BY T. J.
PerkinS
'TEI EPHONE 31 343-211 t.
1312 OPERATING STATUS 761101-761130 720
- 1. REPORTING PERIOD:
GROSS HOURS lilREPORTING PERIOD:
1888 81 MAX.DEPF ND. CAPACiTY (iY.'.Ve-Nel)s 3, PO'vVER LEVELTO IVHICHRESTRICTED (IF ANY) (lily'vYe-Nes):
- 4. REASONS FOR RESTRICTION (IF ANY):
5, NUiYIBEROF HOURS REACTOR I8VAS CRITICAL
- 6. REACTOR RESERVE SHUTDOIVi~l HOURS 7, HOURS GENERATOR OiV LINE
- 8. UNIT RESERVE SHUTDOlVN HOURS THIS I'iIONTH 610:9 152.8 567.2 YRTO DATE CUiYIULATIVE 7,144; 7 44,82. 2 444.6
~290.9 6 959.4 42,738.5 2%2 9, GROSS Tl'IERMALENERGY GFNERATED (I>>~>>YVH)
- 10. GROSS ELECTRICALENERGY GENERATED (iWYH).
- 11. NE> ELECTRICAL ENERGY GENERATED (iYiIYH) 1,042,938 11,746,900 67,961,446 344,035 3;802,702 22,295,805 333,448 3,684,444 21,602,538
- 12. REACTOR SERVICE FACTOR..
- 13. REACTOR AVAILABILITYFACTOR.
liI. UNITSERVICE FACTOR ~.........
~
~ ~......
8
- 15. UNITAVAILABILITYFACTOR
- 16. UNITCAPACITY FACTOR (Using MDC)
- 17. UNITCAPACITY FACTOR (Using Design MIYe)
- 18. UNIT FORCED OUTAGE RATE 84.8 100 78.8 78.8
- 75. 9 75.9 21.2 88.9 94.3 86.6 86.8 75.1 75.1 11.6
- 72. 4
- 74. 5 68.8 68.8 57.0 57.0 12.8
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, ANDDURATIONOF EACH)-
REFUELING MARCH 6, 1977 (12 WEEKS)
- 20. IF SHUT DO>ViV AT END OF REPORT PFRIOD, ESTIiYIATEDDATE OF STARTUP:
NINE MILE POINT NUCLEAR STATION NIAGARA MOHAWK POHER CORPORATION UNITSH UTDOWNS AND POWER REDUCTIONS DOCKET NO.
220 DECEMBER 1, 1976 T. J.
PERKINS (315)343-2110 Ext.
1312 DATE COMPLETED BY TELEPHONE UN1TNAME NINE MILE POINT NO.
DATE TYPE F: FORCED S: SCHEDULED DURATION (HOURS)
REASON (1)
METHOD O" SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)
COR R ECTIVE ACTIONS/COMMENTS 11-9-76 152.85 A
GENERATOR FIELD GROUND CARBON-DUST BUILDUP ON LEADS UNDER GENERATOR.
REPLACED ¹11 REACTOR RECIRC= PUMP SEA S.
(I)
REASON A: LQUlPMENTPhlLURE (EXPLAIN)
II: MihlNT.OR TEST C: REFUL'LlNG D: Rf!GULATORYRESTRICJ'ION L: OPZRATOICTRAlNINGAND LfCENSE EXAMlNATION VI ADMINiS'i'RA'I'IVri G: Ol'ElfATIONALL'RROR (EXPLAIN) lf: OTlfLR(LXPLhIN)
(2)
METHOD 1: ibfANUAL 2: MANUALSCRAM.
3: AUTOibfhTfCSCRAM 4: OTfiEIf(EXPLhlii)
SUfM.RY:
0 c