Letter Submitting the October 1976 Operating Status Report
ML17037B718
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 11/05/1976
From: Schneider R
Niagara Mohawk Power Corp
To:
Office of Nuclear Reactor Regulation
References
Download: ML17037B718 (8)


Text

'NRC FORM 195 U.s. NUCLEAR REGULATORY C SSION DOCKET NUMBER (2-7tt I 50-.220

/ FILE NUMBER ItlRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL MONTHLY REPORT TO: FROM: DATE OF DOCUMENT Niagara Mohawk Power Corp. 11/5/76

.N. Ro Co Syracuse, New York DATE RECEIVED R. R. Schneider 11/12/76 gf4.ETTE R 0 NOTOR IZ E D PROP INPUT FORM NUMBER OF COPIES RECEIVED

/+ORIGINAL lsUNC LASS I F I E D One signed Clcor v DESCRIPTION LETTER TRANS THE FOLLOWING: MONTHLY REPORT FOR October, 1976 PLANT & COMPONENT OPERABILITY &

AVAILABILITY'HISREPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS &

OPERATIONS'LANT NAME: (1-P)

Nine Mile Point $11 nOSOT BmrO t

FOR ACTION/INFORMATION 11 15 76 RJL MIPC W CYS FOR ACT ON INTERNAL DISTR I BUTION NR DR ClNJ9hM BRANCH CHIEF L Lear Parrish EXTERNAL DISTRIBUTION CONTROL NUMBER gPDI1 ~ Oswe o N.

IC SI rr5 78 NRC I'OIIM III' 7ti

I

~ ~ 8 I

~ !'ca%'g

"", 'y' y, r,",>) "; ~

~ ( ) (jj )g 'f f

p CP NIAGARA MOHAWK POWER CORPORATION NIAGARA I

~

,i'II'~i";

MOHAWK 300 ERIE BOULEVARD, WEST im yg8 SYRACUSE, N. Y. I 3202 zx November 5, 1976 Qyp, 0(I%ice. o$ Plate 8 Schedule NA,mt'ohmage, o$ Licee6~ng United S~u Nucf~ Regulatory CommQ a~on Naskingkon, S.C. 20545 RE: Sock& No. 50-220 I$$ +Py~

Gentlemen:

Sub~ed hM~hLe She Op~ng S~ RepoM Joe co mon% o$ 0&obw, 1976 $ oa Cha Nne. hKLe, Po~ Unkt <1 Nues~

PouIW PEmt.

Ve/r,y ~y your+,

.R. Schneidm Vie, P~MLdent-ELmttu.c Paodu~on Enc.

r

/r~

I

<<~

'E rJ C

1~

1 I

1%

tl, IJ

NXYE H'KLE POLIT NUCLEAR STATION STAG NOH.U4K. POWER CORPORATlO'I .

AVERAGE DAILYUi%T POiYER LEYEE.

UNIT 1 November 1, 1976 COMPLETED BY T. J. Perkins ypgppHO~<rE (315)343-2110 ext. 1312 October 1976 DAY AVERAGE DAILYPO>UEP~ LEVEL DAY AVERAGE DAILYPQNFR LEVEr (51We-Xi'et) (M¹-.Net) 555 546 553 533 550 536 ~

536 20 551 2'l 543 552 22 551 355 23 553 351 553 460 25 jo 554 'S 531 553 550 27 548 564 550 573 30 572 549 31 564 549

XNE HXLE POXNT NUCLEAR STATXOxi NXAGARA ~t)OHAKC POITER CORPORATXON OPERATlidG DATAREPORT OOCVET I:O.

Ubf IT DATE NOVEMBER 1, 1976 I

COMPLETED BY TELEPHotwE (315) 343-2110 Ext. 1312-OPERATING STATUS

1. REPORTING PERIOD:

761001-761031 GROSS HOURS IN REPORTING PERIOD.

2. CURRENTLY AUTHORIZED POWER LEVEL li'"iii: 1850 .

MAN. DEPEND. CAPACiTY 1'P'AwN ii: 610 DESIGN ELECTrlICALRATING (MWe.Net):

3. POWER LEVELTO WHICH RESTRICTED (IF ANY) (i/IWe-Net):
4. REASONS FOR RESTRICTION (IF ANY):

THIS I510iVTH YR TO DATE CUiMiU I.ATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 745 6,533.8 ~

44,371.3

6. REACTOR RESERVE SHUTDOWN HOURS 291.8 1,138.1
7. HOURS GENERATOR OiV LINE 745 6392. 2 42,171.3
8. UNIT RESERVE SHUTDOWN HOURS 20.2 20.2
9. GROSS THERMAL ENERGY GENERATED ti iiJH) . 1,280,536 10,703,962 66,918,508

'lO. GROSS ELECTRICAL ENERGY GENERATED (MWH) 3 458 667 ~21 1 770 398,502 3,350,996 21,269;090

11. NE> ELECTRICAL ENERGY GENERATED IiYiWH)
12. REACTOR SERVICE FACTOR ~.................., . 89.3 72.3 100 93.2 '.; 74.2
13. REACTOR AVAILABILITY
14. UNIT SERVICE FACTOR FACTOR 100 87.3 '8.7
15. UiVITAVAILABILITY FACTOR 100 87.6 68.8
16. UiNIT CAPACITY FACTOR (Using MDC) 87.7 75.0 56.8
17. UNIT CAPACITY FACTOR (Using D sign MWe) 87.7 75.0 56.8
18. UNIT FORCED OUTAGE RATE 10.6 12. 6
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MOiVTHS (TYPE, DATE, AND DURATION OF EACH):
20. IF SHUT DO'WiV AT END QF REPQRT PF R IOD, ESTIMATED DATE OF STARTUP:

NINE MILE POINT NUCLEAR STATION NIAGARA MOHAWK POHER CORPORATION DOC LHT ND. EL2BL UNIT SHUTDOWNS AND POWER REDUCTIONS IlMlTNAM8 ~~i>

D<TE November 1, 1976 COMPLETED BY T. ~. Perkins I:.POgT MOgTH October 1976 TELEPHONE 315 343-2110 t. 1312 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURSI REASON ti) REDUCING POWER (2) COB R ECTIVE ACTIONS/COiAMENTS 10 10-23-7 H Reduced load to change rod pattern.

(I) ltEASON A: L'OUIPMENT I'AILURE(EXPLAIN) (2) MLTHOD II: hfhlN'I'. OR TEST I: hlANUAL Station was operated entire C: REFUELING 2l hfANUALSCRAM month at maximum power D: Rf'.GUI.ATORY RESTRICTION 0: AvrOhIATICSCRAM obtainable within reactor I',: OI(ERATOIt:I'RAININGAND 4l OTHER (EXPLAIN) fuel and turbine condenser LICI'.NSI'. HXAhlINA'f ION I'l ADMINIS'I'ItATIVE operating guidelines.

G: Ol'I'.RATlONALERROR {I:XPl.hlN)

II: 0'I'llnlt (EXl'LAIN)

V t