ML17037B717
| ML17037B717 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 10/05/1976 |
| From: | Schneider R Niagara Mohawk Power Corp |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML17037B717 (8) | |
Text
NRC FORM 196 13 70)
U.S, NUCLEAR REGULATORY C MISSION DOCKET NUMBER 50-220 NRC DISTRIB'UTION FoR PART 50 DOCKET MATERIAL FILE NUMBER MONTllLY REPORT N;R,C.
FROM:
Niagara Mohawk Povei Corp.
~
- Syracuse, N. Y.
R.
R,. Schneider DATE OF DOCUMENT 10 5 76 DATE RECEIVED 10 13 76 LETTER ORIGINAL COPY 0 NO TO IIIZE 0
+UNCLASSIFIED PROP INPUT FORM NUMBER OF COPIES RECEIVED Onc signed DESCRIPTION I
LETTER TRANS TliE FOLLOWING:
~
~ ~
~ (
~
MO(THLY REPORT FOR September, 1976 PLANT & COMPONENT OPERABILITY &
AVAILABILITY'HISREPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS &
OPERATIONS'LANT NAME:
Nine Mile Point j/l.,
(1-P)
DO'NOT REMOVE 1,
<, QCKNOWZ,@DGKD MIPC FOR ACTION/INFORMATION 10 13 76 RJL INTERNALD ISTRl BUTION CDOMLP IIA BIULt<CIl C~HIEF L Lear Parrish EXTEIINALI)ISTIIIIIUTION CONTIIQLNUMIIL0 NIIIIPI)llh1 Itlh l3 Ih
~
~
~ttegu atoll A
cy~
. NIAGARAMOHAWKPOWER CORPORATION NIAGARA ~
MOHAWK 300 ERIE BOULEVARO. WEST SYRACUSE. N. Y. I3202
'b ItOC~p@
VStgC
'48leggy t
O~beA 5, 1976 O(p.ce 0$ PLmu 8 SchedId'm NfLe&o~e 0$ LcccR5489 0~ed S~m Nuelean, Regula'oay CommQhmn Ot~tungkon, S.C.
20545 RE:
80ck& No. 50-220 GeetCeInen:
Sub~ed hneeith ~ Che Op~kg S~
RepoM (oa'Che mon% 0$ Sepkembm, 1976 (oe Che N~ne NXe Po~ Nues~ S~on Unit <l.
Vefcy ~y yourn,
.R. Sc Vace Pauideet-EEe~e Paodu~on NS/mfa'nc.
CERTIFIED MAIL RETURN RECEIPT REQUEST 6'
NIHIP NILE PODLlT NUCLEAR STATTOH JJIttG
'hfOJOttJR POtJRR CORPOBA7ZO.'t
. ~
AVERAGEDAILYUiblT PO)'JtEIC LEVK, OOCI:I=7. I O.
UNIT DAfE COiIPLETED BY TELEPHONE T. J.
PE INS
~
4 (3 5)343-2110 Ext.1312 SEPTEMBER 1976 DAY AVERAGEDAILYPO>VER LEVEL (JJI'JYe-Xi'et) 525 529 532 DAY AVERAGP.DAILYPO)"J'ER LrVEL (ME'fe-Net) 525 496 522 12 530 525 529 532 532 531 527 532 530 530 523 20 21 22 23 25 27 28 30 31 521 519 533 S46 556 557 556 557 558 557 556
~
I
XNE NILE POXNT NUCLEAR STATX NXAGAM NO(iAUK POHER CORPORA'ZXON OPERATING DATAREPORT DOCKET NO.
UNIT 50-220 DpTE October 1
1976 COi~'IPLETED QY T.
. Perkins TELEPHP(i)E 315 343-2110 Ext.
1312 OPF RATINGSTATUS
- 1. REPORTING PERIOD. 760901-760930 GROSS HOURS IN REPORTING PERIOD:
720
- 2. CURRENTLY AUTHORIZED POP/ER LFVEL (iYiVA)t liiIAX.DFPEND CAPAC TY (~PP.
1850 6l0 DESIGN ELECTRICAL RATING (iVIWe-Net):
3, POWER LEVELTO WHICH RESTRICTED (IF AiNY) (IltiVle-Net):
- 4. REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YRTO DATE CUiViULATIVE 720 5,788;8 43,626.3
- 5. NUiVIBEROF HOURS REACTOR V/AS CRITICAL
~
~
~
~
~
~
- 6. R ACTOR RESERVE SHUTDOWN HOURS 0
291. 8 1,138.1
- 7. HOURS GENERATOR OiN LINE 720 5,647.2 41,426.3
- 8. UNIT RESERVE SHUTDOWN HOURS
- 9. GROSS THERMALENERGY GENERATED (i'IWH)
- 10. GROSS ELECTRICALENLRGY GENFRATED (iVlVIH) ~
- 11. NE> ELECTRICAL ENERGY GENERATED (iYi'PJH)
- 20. 2
- 20. 2 1,265,337 9,423,426 65,637,972 397,769 3;047,598 21,540,701
- 12. REACTOR SERVICE FACTOR 100
- 88. 0 72.0
- 13. REACTOR AVAILABILITYFACTOR
- 14. UNITSERVICE FACTOR
~
~
~
~
~
~
~
~
~
~
~
~. ~
100 92:5 85.9
- 73. 8 68.3
- 15. UNITAVAILABILITYFACTOR
- 16. UNITCAPACITY FACTOR (Using MDC)
- 17. UNITCAPACITY FACTOR (Using Design h1V/e) ~...
~
- 18. UNIT FORCED OUTAGE RATE 100
- 87. 6
- 86. 2
- 87. 6
- 73. 6 0
ll.8 68.4 56.
- 56. 4 12.8
- 19. SIIUTDOWNS SCH DULED OVER NEXT6 MONTHS (TYPE, DATE, ANDDURATIONQF EACH)=
- 20. IF Sl'IUT DOltVN AT END OF REPORT PFRIOD ESTIi>"ATEDDATE OF STARTUP
NINE MILE POINT NUCLEAR STATION NIAGARA MOHAWK POHER CORPORATION UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO, UNITHAMI; NINE MILE POINT REPORT MONTH SEPTEMBER 1976 DATE COMPLETED BY TELEPHONE I{)/I/76 13' NO.
DATE TYPE F: FORCED S: SCHEDULED DURATION (HOURS)
REASON (1)
METHOD OF SHUTTING DOVtN THE REACTOR OR REDUCING POVIER (2)
CORRECTIVE ACTIONS/COiVIMENTS NONE (I)
REASON h: L'QUIPMENTI'AILURE(EXPLAIN)
IJ: MAJNT. OR TEST C: REFUL'LING
. D: Rf!GULATORYRESTRICTION I;": Ol'LRATOR.TRAININGAND LICENSE EXAMINATION PJ ADMINJS'I'RATIVL' G'OPERATIONAL ERROR (EXPLAIN)
H: OTHER (EXPLAIN)
(2) hfETHOD I; idhNUAL
- 2. MAKUALSCRAM.
3: AUTOMATfCSCRAM 4; OTHER (EXPLAIN)
SE'IMARY:
~/2
~
~ ~ ~'f