Letter Submitting September 1976 Operating Status Report
ML17037B717
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 10/05/1976
From: Schneider R
Niagara Mohawk Power Corp
To:
Office of Nuclear Reactor Regulation
References
Download: ML17037B717 (8)


Text

NRC FORM 196 U.S, NUCLEAR REGULATORY C MISSION DOCKET NUMBER 13 70) 50-220 FILE NUMBER NRC DISTRIB'UTION FoR PART 50 DOCKET MATERIAL MONTllLY REPORT FROM: DATE OF DOCUMENT Niagara Mohawk Povei Corp. 10 5 76 N;R,C. ~

Syracuse, N. Y. DATE RECEIVED R. R,. Schneider 10 13 76 LETTER 0 NO TO II I Z E 0 PROP INPUT FORM NUMBER OF COPIES RECEIVED ORIGINAL Onc signed

+UNCLASSIFIED COPY DESCRIPTION I LETTER TRANS TliE FOLLOWING: MO(THLY REPORT FOR September, 1976

~ ~ ~ PLANT & COMPONENT OPERABILITY &

~ ( ~

AVAILABILITY'HISREPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS &

OPERATIONS'LANT DO'NOT REMOVE 1,

NAME: (1-P) <, QCKNOWZ,@DGKD Nine Mile Point j/l.,

FOR ACTION/INFORMATION 10 13 76 RJL MIPC INTERNAL D IST Rl BUTION CDOMLP IIA BIULt<CIl C~HIEF L Lear Parrish EXTEIINALI) ISTIIIIIUTION CONTIIQL NUMIIL0 NIIIIPI)llh1 Itlh l3 Ih

~ ~

~ttegu atoll A cy~

'b

. NIAGARA MOHAWK POWER CORPORATION ItOC~p@

NIAGARA

~ MOHAWK 300 ERIE BOULEVARO. WEST VStgC

'48leggy t

SYRACUSE. N. Y. I3202 O~beA 5, 1976 O(p.ce 0$ PLmu 8 SchedId'm NfLe&o~e 0$ LcccR5489 0~ed S~m Nuelean, Regula'oay CommQhmn Ot~tungkon, S.C. 20545 RE: 80ck& No. 50-220 GeetCeInen:

Sub~ed hneeith ~ Che Op~kg S~ RepoM (oa'Che mon% 0$ Sepkembm, 1976 (oe Che N~ne NXe Po~ Nues~ S~on Unit <l.

Vefcy ~y yourn,

.R. Sc Vace Pauideet-EEe~e Paodu~on NS/mfa'nc.

CERTIFIED MAIL RETURN RECEIPT REQUEST 6'

NIHIP NILE PODLlT NUCLEAR STATTOH JJIttG 'hfOJOttJR POtJRR CORPOBA7ZO.'t .

AVERAGE DAILYUiblT PO)'JtEIC LEVK,

~

OOCI:I=7. I O.

UNIT DAfE COiIPLETED BY T. J. PE INS

~ 4 TELEPHONE (3 5)343-2110 Ext.1312 SEPTEMBER 1976 DAY AVERAGE DAILYPO>VER LEVEL DAY AVERAGP. DAILYPO)"J'ER LrVEL (JJI'JYe-Xi'et) (ME'fe-Net) 525 525 529 496 532 522 20 521 530 21 519 525 533 22 S46 23 529 556 532 557 25 532 556 531 27 557 527 558 12 28 532 557 530 556 30 530 31 523

~ I XNE NILE POXNT NUCLEAR STATX NXAGAM NO(iAUK POHER CORPORA'ZXON OPERATING DATA REPORT 50-220 DOCKET NO.

UNIT DpTE October 1 1976 COi~'IPLETED QY T. . Perkins TELEPHP(i)E 315 343-2110 Ext. 1312 OPF RATING STATUS

1. REPORTING PERIOD.

760901-760930 GROSS HOURS IN REPORTING PERIOD: 720

2. CURRENTLY AUTHORIZED POP/ER LFVEL (iYiVA)t 1850 liiIAX.DFPEND CAPAC TY (~PP. 6l0 DESIGN ELECTRICAL RATING (iVIWe-Net):

3, POWER LEVELTO WHICH RESTRICTED (IF AiNY) (IltiVle-Net):

4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUiViULATIVE

5. NUiVIBER OF HOURS REACTOR V/AS CRITICAL ~ ~ ~ ~ ~ ~

720 5,788;8 43,626.3

6. R ACTOR RESERVE SHUTDOWN HOURS 0 291. 8 1,138.1
7. HOURS GENERATOR OiN LINE 720 5,647.2 41,426.3
8. UNIT RESERVE SHUTDOWN HOURS
20. 2 20. 2
9. GROSS THERMAL ENERGY GENERATED (i'IWH) 1,265,337 9,423,426 65,637,972
10. GROSS ELECTRICAL ENLRGY GENFRATED (iVlVIH) ~

397,769 3;047,598 21,540,701

11. NE> ELECTRICAL ENERGY GENERATED (iYi'PJH) 100 88. 0 72.0
12. REACTOR SERVICE FACTOR
13. REACTOR AVAILABILITY FACTOR 92:5 73. 8
14. UNIT SERVICE FACTOR ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~

100 85.9 68.3

15. UNIT AVAILABILITY FACTOR 100 86. 2 68.4
87. 6 56.
16. UNIT CAPACITY FACTOR (Using MDC)
17. UNIT CAPACITY FACTOR (Using Design h1V/e) ~... ~
87. 6 73. 6 56. 4
18. UNIT FORCED OUTAGE RATE 0 ll. 8 12.8
19. SIIUTDOWNS SCH DULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION QF EACH)=
20. IF Sl'IUT DOltVN AT END OF REPORT PFRIOD ESTIi>"ATED DATE OF STARTUP

NINE MILE POINT NUCLEAR STATION NIAGARA MOHAWK POHER CORPORATION DOCKET NO, UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT HAMI; NINE MILE POINT DATE I{)/I/76 COMPLETED BY SEPTEMBER 1976 TELEPHONE REPORT MONTH 13' METHOD OF TYPE SHUTTING DOVtN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POVIER (2) CORRECTIVE ACTIONS/COiVIMENTS NONE (I) REASON h: L'QUIPMENT I'AILURE(EXPLAIN) (2) hfETHOD IJ: MAJNT. OR TEST I; idhNUAL SE'IMARY:

C: REFUL'LING 2. MAKUALSCRAM.

. D: Rf!GULATORYRESTRICTION 3: AUTOMATfCSCRAM I;": Ol'LRATOR.TRAINING AND 4; OTHER (EXPLAIN)

LICENSE EXAMINATION PJ ADMINJS'I'RATIVL' G'OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

~/2 ~

~ ~ ~'f