ML17037B687

From kanterella
Jump to navigation Jump to search
Letter Regarding April 1974 Reports on Daily Plant Power, Operating Status, and Plant Shutdowns
ML17037B687
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 05/06/1974
From: Schneider R
Niagara Mohawk Power Corp
To:
US Atomic Energy Commission (AEC)
References
Download: ML17037B687 (8)


Text

SegUletory Docket NIAGARAMOHAWKPOWER CORPORATION iI>'I~~,

NIAGARA l'

MOHAWK e

a)51>f>

'AY183974~ I-300 ERIE BOULEVARD WEST SYRACUSE, N. Y. I3 ROE May 6, 1974

=50-2;go Office of Plans

& Schedules Directorate of Licensing United States Atomic Commission Washington, D. C.

20545 Gentlemen:

Please find enclosed, copies of the following reports for the Nine Mile Point Nuclear Station Unit 1:

1.

Daily Plant Power 2.

Operating Status 3.

Plant shutdowns Very truly yours, R. R. Schneider Vice president - Electric Operations TJP:1 cc: RO:1 Enclosures

- 3

~~c~

lI Ogjjg'0

,81 C

<<e( ~~IagI, 4265

0 f

(

~

1 C

I l

Q

ENCLOSURE A UNIT Nine Nile Point No. l DATE 740506 COMPLETED BY T. J.

Per}sins DAILY PLANT POMER OUTPUT HONTH APRIL, 1974 None generated.

AVERAGE DAILY Mfe-net DAY AVERAGE DAILY Y>>ie ~net 1

2.

26 27 28 29 30 31 10 12 20 22 23 24

l I~

~

I I

I l

t 4

~

)) r l

E+

V lh

, 'i

UNIT Hk'.lE DATE Nine Mile Point No.

1 740506 CO.'fPLETED BY T. J. Perkins - Station Superintendent OPERATING STATUS 1.

REPORTING PERIOD:

74'0401 GROSS HOURS IN REPORTING PERIOD:

TO 740430 720 2.

CURRENTLY AUTHORIZED PCPER LEVEL ~ifift 1 5

Mfe-NET 3.

PNIER LEVEL TO MIICH RESTRICTED (XF ANY):

4.

REASONS FOR RESTRICTIONS (IF ANY):

After 740310 only 2 of 3 Feedwater Strings were available for service.

THIS CUI'fULATIVE MONTH YR-TO-DATE TO DA'I'E 5.

HOURS REACTOR HAS CRITICAL.

6 HOURS GENERATOPi Oif LINE

~

~

~

~

~

~

~

~

7.

GROSS THECAL PONER GENERATED (MR) 8.

GROSS ELECTRICA1 PONER GENERATED (MK) ~

9.

NET ELECTRICAL PONER GENERATED (MiH) ~

10.

REACTOR AVAILABILITYFACTOR (1)

~

~

~ 17 0

0 0

0 0

2112.65 2112.48 3,558,646 1,201,825 1,165,736 73.4 Not available 25,477.28 39,922,429 13,168,908 12,760,228 Not available 11.

PLANT AVAILABILITYFACTOR. (2) 12.

PLANT CAPACITY FACTOR (3) 13.

FORCED OUTAGE RATE (4).

~

~

~

~

0 0

0 78.4 66.4 0

64.7, 53.1 15.8 14

~

SHUTDOWNS SCIIEDULED TO BEGIN IN NEXT 6 MOiNTHS (STATE TYPE, DATE AND DURATION OF EACH):

~ c II 15.

ZF SHUTDOIPif AT, END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

5-26-74 l5 I

4 16.

PLANTS IN TEST STATUS (PRIOR TO COIII'IERCIAL'PERATION) REPORT THE FOLLOWING:

I DATE LAST DATE REASON FOR FORECAST ACHIEVED DIFFERENCE INITIALCRITXCALITY INITIALELECTPifCAL POWER GENERATIOiN l

CO>PifERCIAL OPERATION (1)

REACTOR AVAII,ABILITYFACTOR = IIOURS REACTOR NAS CRITICAL GROSS IIOURS. IN.IIEPORTING PERIOD

()) PLANT AVAILABILITYFACTOR IIOURS Gl'ESTOR ON LINE,

'100 GROSS IIOURS lN REORTING PERIOD

  • 100 c

(3) (LANT CAPACITY FACTOR = NET EI.ECTI'TCAI, PONI',R GENERATED CUPRENTI.Y I,ICI NSED POINTER LEVEl.i"GROSS HOURS IN REPORTING PERIOD L

(4)

FPRCFD OUTAGE RATE ='OI'CED OUTAGE IIOURS

  • 100 IIOURS GENERATOR ON-LINE + FORCED OUTAGE HOURS
  • 100

0 1

~

<<.'Nv I>'K Q.r

".eC 5f '4 a

I

SE'GLARY:

Unit No.

1 shutdown for annual overhaul and refueling.

UNIT NAIIE NINE MXLE PT.

NO.

1 DATE 740331 COMPLETED BY T. J. Perkins REPORT MONTH PLANT SHUTDOWNS h

C-'O DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)

REASON (1)

METHOD OF SHUTTING DORM THE REACTOR (2)

COrCKNTS 740330 720

)

I

'I 4

(1): REA'N::

A-(QUIPEENT ~FA'XLURE (EXPLAIN)

B-?LINT.OR. TES'Z

'-~~FUELIHG:.

D-@GULA'MRY'RESTRICTION E-68ERATQR'~TRAINING AND XXQENS'E'EXAMINATION F-:PSMIj'KSTRATIVE G-'4RFRATZGN'AL ERROR 4(gXPXAXN)

(2) "M=.TH(

A-B-~ SIP C-AI

\\

w

~. ~

,A I

T