ML17037B684
| ML17037B684 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 02/26/1974 |
| From: | Schneider R Niagara Mohawk Power Corp |
| To: | US Atomic Energy Commission (AEC) |
| References | |
| Download: ML17037B684 (16) | |
Text
'e e
e AEC DIS UTION FOR PART 50 DOCKET MATE (TEMPORARY FORM)
CONTROL NO:
1955 FILE:MON.REPT. FILE.P/0 FROM:
Niagara Mohawk Power Corporat
- Syracuse, N. Y.
13202 R. R. Schneider DATE OF DOC on 2-26-74 DATE REC'D 3-8-74 LTR MEMO RPT OTHER TO:
DL ORIG 1 si ned CC OTHER SENT AEC PDR X
SENT LOCAL PDR X
CLASS UNCLASS PROP INFO INPUT NO C S REC'D DOCKET NO:
50-220 DESCRIPTION:
Ltr trans the following:
Nine Mile Point Unit N 1
ENCLOSURES:
Janua 1974 Monthl Re ort, "Plant &
Component Operability & Availability"~...
This Report to be use;fox preparing Gr'ey. Boo by Plans
& Operations.
( I cy rec'd)
P~O, ~088fflQ(f(1 kL'QII-;"~LH)KIJ AB BUTLER(L)
W/
Copies CLARK(L)
W/
Copies GOLLER(L)
'W/
'Cop'ies KNIEL(L)
W/
Copies SCHWENCER(L)
W/
Copies STOLZ (L)
W/
Copies VASSALLO(L)
W/
Copies SCHEMEL(L)
W/
Copies FOR ACTION/INFORMATION W/
Copies INTERNAL DISTRIBUTION M ZIPlANN(L)
REGAN (E)
W/ 1Copies(Info)
W/
Copies DICKER(E)
~W.
MAGEE W/
Copies W/2 Copies KNIGHTON(E) "
W/
Copies W/
Copies YOUNGBLOOD(E)
W/
Copies REG FILE 0 PD
- OGC, ROOM P-506A
~UNTZING/STAFF CASE GIAMBUSSO BOYD MOORE (L) (BWR)
DEYOUNG (L) (PWR)
SKOVHOLT (L)
P.
COLLINS DENISE REG OPR PILE & REGION(3)
MORRIS STEELE TECH REVIEW HENDRIE SCHROEDER MACCARY KNIGHT PAWLICKI SHAO S TELLO HOUSTON NOVAK ROSS IPPOLITO TEDESCO LONG LAINAS BENAROYA VOLLMER DENTON GRIMES GAMMILL KASTNER BALLARD SPANGLER ENVIRO MULLER DICKER KNIGHTON YOUNGBLOOD REGAN PROJECT LDR HARLESS LIC ASST DIGGS (L)
GEARIN (L)
GOULBOURNE (L)
LEE (L)
MAIGRET (L)
SERVICE (L)
SHEPPARD (E)
SMITH (L)
TEETS (L)
WADE (E)
WILLIAMS (E)
WILSON (L)
S.
REED (L)
A/T IND BRAI'IMAN SALTZKD B.
~MCDONALD
~ DUBE w/Input INFO C. MILES B. KING
~ S ~
CHAPMAN sdsd'
- LOCAL PDR Osw o
> 1 <<DTIE(ABERNATHY)
W - NSIC(BUCHANAN) 1 - ASLB(YORE/SAYRE/
WOODARD/"H" ST.
16 -
CYS ACRS HOLDING N 'Y, EXTERNAL DISTRIBUTION (1) (2X10)-NATIONAL LABS S 1>>ASLBP (E/W Bldg, Rm 529) 1-W.
PENNINGTON, Rm E-201 GT 1-CONSULTANTSS NE&fARK/BLISS/AGBABIAN 1-GERALD ULRIKSON.. ~ ORNL 1-PDR-SAN/LA/NY 1-GERALD LELLOUCHE BROOKHAVEN'AT. LAB 1-AGMED(Ruth Gussman)
HM-B-127, GT.
1-RD..MULLER,.F-309 GT
I r
4 4
C 1
Ai
~
A I
I I
k o
~
+ ~
sw C,
I
~
i9 '<)',f~).< <+39
~,='
y ~
Rejutafory; NIAGARA MOHAWK POWER CORPORATION
)tt) t'IAGARA I'
MOHAWK 300 ERIE BOUI EVARD WEST SYRACUSE, N.Y. l3202 8
February 26, 1974 JQR 8
)eyq~
Office of Plans 5 Schedules Directorate of Licensing United States Atomic Energy Commission washington, D.
C.
20545 50- 220 Gentlemen:
Please find enclosed copies of the following reports for the Nine Mile Point Nuclear Station Unit 81.
1.
Daily Plant Power 2.
Operating Status 3.
Plant Shutdowns 4.
Major Shutdown Forecast It should be noted that reactor critical hours and forced outage hours were not required by the conditions of the initial license, and therefore are not readily available on a cumulative basis.
Very truly yours,
.R. Schneider Vice President Electric Operations RJP:cm cc:
RO:I Enclosures REGISTERED MAIL RETURN RECEIPT REQUEST
,c OOCKHED USAEC 8
1s74~
5
, REGUlATORY PAIL SECTION OoC~ET Cmu(
e
I
'I E
ill
ENCLOSURE A UNIT NMPNS Unit 81 DATE COi~lPLETED BY
'on Superintendent DAILY PLANT POWER OUTPUT NONTll 74 01 DAY AVERAGE DAILY Mfe-net DAY AVERAGE DAILY Mi(e-net 578
~f 582 582 582
%82 579 25 27 28 30 31 581 580 580
~M 580 581 10 12 13 14 15 16 17 19 20 22 23 24
'580 582 580 580
~58
(~
577 576
(~
580 581 Kv.-
.Ut>IT NrA~IE NINE MILE POINT NUCLEAR STATION UNIT N'1 740225 COiIPLETED BY T. J. Perkins - Station Superintendent OPERATING STATUS 1.
REPORTING PERIOD:
740101 TO 740131 GROSS HOURS IN REPORTING PERXOD:
743 hours0.0086 days <br />0.206 hours <br />0.00123 weeks <br />2.827115e-4 months <br /> 2.
CURRENTLY AUTHORIZED POtirER LEVEL ~iilit 1850 MMe-ilET 610 3.
POWER LEVEL TO Ii'HXCIi RESTRICTED (IF ANY):
1770 M4(t) 4.
REASONS FOR RESTRICTIONS (IF ANY):
Unavailabilty of second stage reheater limits maximum steam flow.
THIS MONTH YR-TO-DATE CUIIULATIVE TO DATE 5.
HOURS REACTOR MAS CRITXCAI,.
. 743 743 Not available 6.
HOURS GENERATOR ON-I.IiNE.
743 743 24,107.8 7.
GROSS THERIIAI. POWER GENERATED (MAI).... 1,304 047 1,304,047 37,667,830 8
GROSS ELECTRICAL POWER GENERATED (MK) 443 j325 443 ~ 325 1 2 ~ 4' 0 ~ 408 9 ~
NET ELECTRICAL POWER GENERATED (NRi).... 430,315 430,315 12,024,807 ll.
PLANT AVAILABILITYFACTOR (2)......,
100 100 64.7 12.
PLANT CAPACITY FACTOR (3)
~
~
~
~
~
~
~
94 9
94.9 52.9 Not available 13.
FORCED OUTAGE RATE (4).
14.
SHUTDO'KS SCIIEDULED TO BEGIN IN NEXT 6 MOiVTHS (STATE TYPE, DATE AiVD DURATION OF.EACH):
Second major refueling outage - from 740315. to,740510 10.
REACTOR AVAILABILITYFACTOR (1) 100 100 Not available 15.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
16.
DATE ACHXEVED PLANTS IN TEST STATUS (PRIOR TO COKIERCXAL OPERATION)
REPORT THE FOLLOWING:
DATE LAST FORECAST CRIT.
(.'AGZTY INITIALELECTRICAL POWER GENERATXOiV COMI.PERCIAL OPERATION
" ".69090 1
691109 691214 Cumulative hours" start 691101 (1)
REACTOR AVAII.ABXLITYFACTOR = HOUIIS REACTOR MAS CRITICAI.
GROSS lrOURS IN REPORTXNG PI RIOD
>>100 (2)
PLANT AVAILABILITYI'ACTOR = IIOURS Gl',NI:PATOR ON-I.XNE
- 100 GROSS HOURS 1N REORTXNG PER10D (3)
PLANT CAPACXTY FACTOR -
NET EI.ECTRTCAI. POWER CI:VI RATED CUI'RlrVTI.Y I.XCI NSED I'OMEI'.EVEI.>>CROSS HOURS IN }O'.PORTING PERIOD A
(4)
FORCED OUTAGE RATE =
FORCED OUIAGI; IIOUPS
- 100 HOVPiS GENERATOR ON-I,I'NI.'
FORCI D OUTAGE HOURS
>>100
SUM LORY:
Station operated with No Shutdowns during the Reporting Period.
1
-.;UNIT NAtX NMPNS Unit 1
- DATE 74 02 25,
'COMPLETED BY T.J. Perkins-Station Superintendent REPORT MONTH 7401 PLANT SHUTDOWNS NO.
DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)
REASON (1)
METHOD OF SHUTTING DO%3 THE REACTOR (2)
COiVANTS (1)
REAS ON:
A-EQUIPMENT FAILURE-,(EXPLAIN).
B-MAINT. OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING<A:<D'ICENSE EXAMINATION F ADMINISTRATIVE G-OPERATIONS. ERROR-(EXPLAIN) r" M1'.THOD:
A-KGxUAL*
B-NAGUAL"SCRAM C-AUTO~KTIC SCRAM-p
8
'4
NMPNS Unit 1
DATE 02 25 CO'PLETED BY T.J. Perkins - Station Superintendent MAJOR SHUTDOMN FORECAST (5-year forecast; report one-tirue only)
PURPOSE(s)
BEGIN DATE END DATE Ma'or Refuelin Outa e
Major Refuelin Outa e
Major Refueling Outage Major Refueling Outage Maj or Refueling Outage 74 03 15 75 03 15 76 03 15 77 03 15 78 03 15 74 05 10 75 04 26 76 04 26 77 04 26 78 04 26
N
AEC TRI"UTXON FOR P
RT 50 DOCKHT 'ERXAL (Ti'LIPOP KRY FOR) I) 2007 CONTROL 110:
Mo. 'Rpt File P/0 PILE:
FRO:I:
Niagara Mohawk Power Corporation
- Syracuse, N.Y. 13202
'r.
R.R. Schneider DATE OF DOC 3-7-74 DATE R:"O'D 3-11-74 LTR X
)Ii~!0 RPT CTIIEPi TO:
AEC CLASS UNCLASS XXX PROP INFO ORIG 1 signed X)1PUT CC OTLIER NO CYS REC'D 1
XXX DOC)MT NO:
50-220 DESCPiXPTXON:
Ltr dtd 3-7-74 trans the January, 1974 monthly rpt ant an component operability and avalhbilityii PL NT )IR'K:
Ni Mil P j t gl ENCLOSURES:
ACKNOWLEDGE@,
DO NOT REMOVE FOR ACTION/Xt:FO."'LA~ ICN 3-11-74 JB BUTLLR (L)
W/
Copies CLAKti(L)
W/
Copies GOLLER(L)
W/
Copies
~ IQ>XEL(L)
W/
Copies SCIiRJENCEI<(L)
W/
Copies STOLZ (L)
M/
Copies
-VASSALLO(L)
W/
Copies SCHE'GAEL(L)
W/
Copies ZIEt)A)i!i(L)
M/
Copies DICI~~'R(E)
M/
Copies
)GRIG)iTCN( ) "
'/
Copies YOUNGBLOOD(E)
W/
Copies REGAN(E)
W/
Copies
~ <P.p>Nagee W/g Copies W/
Copies
" M/
Copies REG FlLE PDR OGC>
FLOG~I P 506A
~UK'TZING/STAFF CASE GX/2IBUSSO BOYD
))CORE (L) (BWR)
DEYOUNG(L) (FMR)
SI'OVHOLT (L)
P.
COLLIBS DEiNXSE REG OPR FILE & REGION(3)
HOFiRIS STEELE TECI) FiEVIEM HZNDRXE SCIIRiOEDER MACCAPiY KNXGHT PAWLICI'I SHAO STELLO
)IOUSTOil NOVAK ROSS IPPOLITO TEDESCO.,
LONG LAINAS BEI'lAROYA VOLLMER DENTO'.I GFiX)KS GA~EIXLL
)ASTiiER BALLAPiD SPA?lGLEPi RRVLRO MULLER DICKER IiNIGHTON YOUNGBLCOD REGAN PPOJECT LDR HARLESS LIC ASST DIGGS (L)
GEARIN (L)
GOULBOURIIE (L)
LEE (L)
MAXGRET (L)
REED (L)
SERVICE (L)
SHEPPARD (E)
SMITH (L)
TEETS (L)
MADE (E)
WILLIAMS (E)
WILSON (L)
EXTE?'lAI. D STRXBUTION Xt!TEI'i'.AL DXSTi:XBUTXON A/T I:~
BRAXX;:;:~
SALiZ.'AN B,
HURT PLR!iR
~MCDORALD DUBE w/Input INFO C, MILES B. KltlG m Chapman
.Ziemann~
/s>
~l << LOCAL PDR o
s R'1
- DTXE(ABER!IATIIY)
+1 - NSIC(BUCIL'LNAII) 1 <<.ASLB(YORE/SAYRE/
WOODAPiD/"ii" ST.
1G -
CYS ACRS HOLDING
~
> ~
~ v.
R l.-B & M SWINEBROAD (1) (2X10)-NATXO:lALLAB'S 1-ASLBP(r/M Bld;I;>>m 529)
'-'1, PENiiXiiGTON) iim E-201 1-CONSULTANr' NEMIIARI:/BLU:IE/SGBABIAN
~,', "....;;1-..G RAI,D ULRXRSON..,.ORNL'-P.
R. DAVIS 1
PDR SAN/LA/NY 1-GERALD LELLOUCHE GT BROO)iiiAVEN NAT. LAB 1-AGMED(Ruth Qussma RII-B-127, GT.
"..;-"".;.1-RD
)"JLI,ER., F-309
r Pl
~
~
t I /
P
~
~
II1 r
I IP I
'P.'
II
~,r
~
e
Rjb Cy.
NIAGARA MOHAWK POWER CORPORATION
~>>lI~
NIAGARA ~~
MOMAWK 300 ERIE BOULEVARD WEST SYRACUSE, N.Y. I3202 March 7, 1974 Office of Plans
& Schedules Directorate of Licensing United States Atomic Energy Commission Washington, D. C.
20545 Gentlemen:
l yy~
~<a g'~
EECule IL g yIIgy pg~
ECTION CL@
g 8
5 Please find enclosed copies of the following reports for the Nine Mile Point Nuclear Station Unit 1:
'I 1.
Daily Plant Power 2.
Operating Status 3.
Plant Shutdowns Very truly yours,
\\
R. R. Schneider Vice President - Electric Operations RJP 1
cc: RO:1 Enclosures REGISTERED MAIL RETURN RECEIPT REQUEST P+
oop
l 1't,