ML17037B663

From kanterella
Jump to navigation Jump to search
Letter Updating the Refueling Information Contained in the Annual Report of Operation for 01/01/1975 Through 12/31/1975
ML17037B663
Person / Time
Site: Nine Mile Point 
Issue date: 12/06/1976
From: Rhode G
Niagara Mohawk Power Corp
To: Goller K
Office of Nuclear Reactor Regulation
References
Download: ML17037B663 (4)


Text

NRC FORM 195 (2.76)

U.S. NUCLEAR REGULATORY COMMISSION DOCKET NUMBER 50-220 NRC DISTR I13UTION FoB I

T 50 DOCKET MATERIAL FILE NUMBER TO:~ K.R.

GOLLER h

FROM: NIAGARA MOHAWK POWER CORP.

6YRACUSE, N;Y.

G.K.

RHODE DATF. OF DOC V MENT 12-6-76 DATE RECEIVED 12-9-76 CILETTER BIGINAL Q COPY ONOTOBIZEO BUNCLASSIFIED PROP INPUT FORM NUMBER OF COPIES RECEIVED DESCRIPTION LTR. RE.

OUR 6-18-75 LTRR... '.

LTR. UPDATING THE REFUELING INFORMATION TO ANNU REPORT OF OPERATION FOR JANUARY 1, 1975 THRU DECEMBER 31, 1975;....

(

1 SIIRIED CY RECEXVED)

$ 1 PAGE)

ENCLOSURE DDNOT REMOVE

~O~PDGEO PLANT NAME:

NINE MILE PT.

I/

1 SAFETY ASSIGNED AD:

NC PROJECT MANA E

~

L C ASST LEAR FOR ACTION/INFORMATION T~

~ ~

PROJECT MANAGER LIC ASST L

NRC PDR I&E 2

OELD GOSSICK & STAFF MIPC CASE HANAUER HARLESS PROJECT MANAGEMENT BOYD P ~ COLLINS HOUSTON PETERSON MELTZ HELTEIfES SKOV1IOLT INTERNALD SYSTEMS SAFETY HEXNEtfAN

'SCHROEDER ENGINEERING MACARRY IQlIGHT SIINEXL PAMLICK REACTOR SAFE ROSS NOVAK ROSZTOCZY CHECK AT&I SALTZMAN RUTBERG EXTERNAL DISTRIBUTION ISTRl BUTION PLANT SYSTEMS TEDF.SCO EN 0

IPPOLXTO OPERATING REACTORS STELLO OPERATXNG TECH EXSENliUT BVQ,E fFS S TE SAFE E

ERNST BALLARD SPANGLER SITE TECH GAFQfILL STEPP HULIfAN SITE ANALYSIS VOLLlfER BUNCH J.

COLLINS KRF.CI'.R CONTROL NUMBER LPDR'XC:

NSXC:

0 N Y; ASLB:

ACRS CYS m~e/

NRC f'OIIM 196 12.7III NAT~ LAB RFG V.XE LA PDR CONS UI.ThNTS L

BKROI:HAVEN HAT ~H U I S

N 0111@

12355

II -r,,f q

I I -%(P,,

~

+VOVi3jf'j'QTQ gg

~Z73QQI +pq

.I

,) l' i

r lrist~)>06 8 YMNTA~

883A 0<N!~-l.

IIgylfa$48

'Nle CY~

GERALD K. RHODE VICE PRESIDENT Ey NIAGARA MOHAWK POWER CORPORATION l

NIAGARA~

MOHAWK i

300 ERIE SOULEVARD WEST SYRACUSE, N, Y. I3202 SoCErrE Ii 4

December 6,

1976 Director of Nuclear Reactor Regulation Attn:

Mr. Karl R. Goller, Assistant Director Operating Reactors Nuclear Regulatory Commission Washington, D. C.

20550 Re:

Nine Mile Point Unit 1

Docket No. 50-220 DPR-63

Dear Mr. Goller:

This letter updates the refueling information contained in the Nine Mile Point Nuclear Station Annual Report of Operation for January 1, 1975 thru December 31, 1975.

Our present plans provide for a plant shutdown on March 6, 1977 and start-up, following the refueling, on approximately May 29, 1977.

The relo'ad license amendment submittal and supporting information was provided on December 3, 1976 in accordance with the requirements of your June 18, 1975 letter.

Very t ly yours era 0 K. Rhode Vice President-Engineering

/sq

1

~r o o'

o o

N v

p o

f'