Letter Regarding a 03/01/1977 Letter Concerning the Details of Feedwater Nozzle Ultrasonic Examination Procedures and Indicating That the Examinations Will Be Performed After Cladding Removal Anticipated to Be 04/20/1977
ML17037B635
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/21/1977
From: Rhode G
Niagara Mohawk Power Corp
To: Lear G
Office of Nuclear Reactor Regulation
References
Download: ML17037B635 (4)


Text

'hlRC FO M 195.

(2.761 '~

U.S. NUCLEAR REGULATORY C

'4ISSION DOCK T NUMBER 0

@gal NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL FILE NUMBER TO: Mr. George Lear FROMÃiagara Mohawk Power Corp.

Syracuse, N. Y.

13202 Gerald K. Rhode DATE OF DOCUMENT 03-21-77 DATE RECEIVED 03-25-77 LETTER ZfoRIGINAL OCOPY 0

OTORIZED NCLASSIFIED PROP INPUT FORM NUMBER OF COPIES RECEIVED J

DESCRIPTION Ltr Ref. R.R. Schneider's 03-01-77 1tr...AdyMing Feedwater nozzle ultraaonic examinations will be performed afMv cladding removal anticipated to begin on April 20, 1977 ENCLOSURE

( 1 page

')

, DO NOTREF, PLANT NAB MILE POINT UNIT g 1 gcm.

ACKNOWLEDGED SAFETY ASSIGNED AD:

FOR ACTION/INFORh1ATION C

MA E

L C ASST

- fL)OM]d PROJECT MANAGER LIC ASST INTERNALDISTRIBUTION IREG NRC PDR

-I-& E OELD GOSSICK & STAFF MIPC CASE

'ANAUER HARLESS PROJECT MANAGEMENT BOYD P

COLLINS HOUSTON PETERSON MELTZ HELTEMES SKOVHOLT SYSTEMS SAFETY

-SCHROEDER ENGINEERING MACARRY BOSNAK SIHWEIL PAWL CK REACTOR SAFE ROSS NOVAK ROSZTOCZY

'HECK AT&I SALTZMAN RUTBERG EXTERNALDISTRIBUTION PLANT SYSTEMS TEDES 0 IPPOLITO OPERATING REACTORS

'STELLO OPERATING TECH EISENHUT B

E STESA ERNST BALLARD YOUNGBL0OD SITE TECH GADIILL STEPP HULMAN SITE ANALYSIS VOLLMER BUNCH J

COLLINS KREGER CONTROL NUMBER LPDR

/ TIC.

NSIC:

e o NAT LAB REG V IE LA PDR ULR KSON OR ASLB0 ACRS CYS &QLDXSQ/

NRC FORM 196 I2-76)

CONSULTANTS:

E T 70 ggoQ/y

~

~

'l

+

s I

4 C

~

~

C 8.

II 4

lI

NIAGARAMOHAWKPOWER CORPORATION

<<)111M NIAGARA ~

MOHAWK 300 ERIE BOULEVARD. WEST SYRACUSE. N. Y. 13202 Kllikkii(LNtIIIi'i(III:Ii;NPF.,

March 21, 1977 Director of Nuclear Reactor Regulation Attn:

Mr. George Lear, Chief Operating Reactors Branch g3 U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555 Re:

Nine Mile Point Unit 1 Docket No. 50-220 DPR-63 8

MAR2519Vhl 45~ IOCCe IIIOuGnOC l55ION RiS I<

Dear Mr. Lear:

Mr. R.

R. Schneider's letter of March 1, 1977 stated that the details of our feedwater nozzle ultrasonic exam-ination procedures would be provided to the Nuclear Regulatory Commission by March 21, 1977.

However, we are still studying the adequacy of the procedures to be used in these examinations.

Consequently, it is not possible to submit the required details at this time.

Peedwater nozzle ultrasonic examinations will be performed after cladding removal.

This submittal will be made prior to these examinations, now anticipated to begin on April 20, 1977.

Sincerely, NIAGARA MOHAWK POWER CORPORATION Gerald K. Rho e

Vice President Engineering