Letter Regarding a Revised Schedule for Finalizing the Design for Recirculation Pump Trip for Unit 1
ML17037B621
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/30/1977
From: Rhode G
Niagara Mohawk Power Corp
To: Stello V
Office of Nuclear Reactor Regulation
References
Download: ML17037B621 (4)


Text

DOCKET NUMBER NRC,FORM 195 I2-76)

U.S. NUCLEAR REGULATORY COMMISSION 0- Z Z.O FILE NUMBER NRC DISTRIBUTION FDR RT 50 DOCKET MATERIAL FROM: NIAGARA MOHAWK POWER CORP DATE OF DOCUMENT V. STELLO SYRACUSE, N.Y. -

6 30 G.K. RHODE DATE RECEIVED 7 6 77 QNOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED E TER

.ORIGINAL CI COP Y UNCLASSIFIED S I G,FU F8 g ~ g/ ~ig /8 y 7g DESCRIPTION ENCLOSURE LTR INFORMING OF

(

REVISED SCHEDULE OF FALL, 1878 FOR FINALIZING IHE DESIGN FjlR RECIRCUMXION PiRIP TRIP FOR UNIT Ill.

(1P) /

gg N)KN%

NINE MILE PT fl 1 SAB FOR ACTION/INFORMATION ENVIRH%IENTAL ASSIGNED AD: V, MOORE LTR BRANCH CHIEF:

JECT IINAGER: PROJECT MANAGER:

ICENSING ASSISTANT: LICENSING ASSISTANT:

B~ HARLESS INTERNAL DISTRIBUTION SYSTFMS SAFETY PLANT SY STEMS SITE SAFETY &

HEINEMAN TEDESCO ENVIRON ANALYSIS ROEDER BENAROYA DENTON & MULLER AFF ENG'INEERING IPPOLITO ENVIRO TECH ERNST OPERATING REACTORS BALLARD GBLOOD BAER VAK BUTLER GAMMILL Z CZY GRIMES CHECK SI'ZE ANALYSIS VOLTE R AT&I BUNCH LTZMAN J ~ COLLINS TBERG KREGER EXTERNAL DISTRIBUTION CONTROL NUMBER TIC NSIC 771880066 REG IV J HANCHETT 16 CYS ACRS SENT CAT GO Y

I h et 1! li it

(

II

\+

NIAGARA MOHAWK POWER CORPORATION NIAGARA

~

.y'il!Im~

MOHAWK 300 ERIE BOULEVARO, WEST SYRACUSE. N. Y. 13202 June 30, 1977 egu1atotf, Director of Nuclear Reactor Regulation Attn: Mr. Victor Stello, Director Operating Reactors U. S. Nucleax'egulatory Commission Washington, D. C. 20555 Re: Nine Mile Point Unit 1 Docket No. 50-220 DPR-63

Dear Mr. Stello:

My October 4, 1976 letter indi,cated that design information regarding recirculation pump trip for Unit 1 would be submitted in June 1977. We under'stand that the Nuclear Regulatory Commission is planning to provide guidance 'in August 1977 for recirculation pump trip and the Anticipated Transients Without Scram issue.'n order to incorporate thi,s guidance, we have xevised our schedule for finalizing the 'des'j,gn for recirculation pump trip for Unit 1. As indicated in the >>above-'mentioned letter, a recirculation pump trip is planned fox installation during the next refueling outage, presently scheduled for Fall, 1978.

Six months prior to thiq installati,on, detailed design infor-LIMNI mation and appropriate Technical Specification changes for the recirculation pump trip feature will be provided.

Pepy truly yours, NIAGAIQ MOHAWK POWER CORPORATION erald K. Rhode

., Vj,ce Px'esident - ngineering 7718S0066