ML17037B605
| ML17037B605 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 01/06/1978 |
| From: | Dise D Niagara Mohawk Power Corp |
| To: | Lear G Office of Nuclear Reactor Regulation |
| References | |
| Download: ML17037B605 (4) | |
Text
I, DISTRIBUTION AFTER ISSUANCE OF OPERATING LICENSE NRC FoRM 195 U.s NUCLEAR REGULATORY COMMI N
{Z-76)
,I
~- ~NRCJ3ISTRIBUTION FDR PART 50 DOCKET MATERIAL DOCK T NUMBER FII.E NUMBER TO:
l@ETTE R QO R IG INAL C!coPY DESCRIPTION Mr. George Lear QNOTORIZEO
@UNCLASSIFIED PROP Niagara Mohawk
- Syracuse, N. Y.
13202 Donald P. Wise INPUT FORM ENCLOSURE DATE OF DOCUMENT 01/06/78 DATE RECEIVED NUMBER OF COPIES RECEIVED
Response
to. NRC' ltr dtd 12/90/77 concerning suppression pool temperature transient analys for'Unit 1...Advising clarificati will be available by 02/15/78...
ns 1p PLANT RaHE'-
NINE MILE POINTIUNIT g 1 jcm 01/11/78 SAFETY BRANCH CHIEF:
7 FOR ACTION/INFORMATION REG F INTERNALDISTR I BUTION MCG UG PDR:
LcJ <
CYS SENT CATE R
EXTERNALDISTRIBUTION CONTROL NUMBE R
\\I 7801100
/
A
Nl V HIIASAIRA HUMQHA~K 0
Donald P. Disc NIAGARAMOHAWKPOWER CORPORATION/300 ERIE BOULEVARDWEST. SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-1511 Vice President Engineering W
%r January 6,
1978 Director of Nuclear Reactor Regulation Attn:
Mr. George Lear, Chief Operating Reactors Branch $ 3 U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555
~E/yQ Ap Jpyi i Sag
,co @4 Rrc bfor~g+sro 5fggI SWWWg Re:
Nine Mile Point Unit 1 Docket No. 50-220 DPR-63 Gentlemen:
In response to your December 9,
1977 letter concerning suppression pool temperature transient analysis for Nine Mile Point Unit 1, our letter of December 23, 1977 indicated that Niagara Mohawk would submit items which require clari-fication by January 6,
1978.
Due to the generic issues involved, General Electric, our reactor supplier, is unable to do this at this time.
By February 15,
- 1978, Niagara Mohawk will identify any items which require clarification in addition to supplying an action plan describing the specific analysis to be performed and its appropriate schedule.
Very truly yours, NIAGARA MOHAWK POWER CORPORATION Donald P. Disc Vice President-Engineering GJG/szd 78O>a0054
I
~
Pif %.. Jl /1 ~ ph Ihffhgh aty V4 1 ~
II
>><J JNJ (Q
gg [p ~9