ML17037B588
| ML17037B588 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 05/26/1978 |
| From: | Dise D Niagara Mohawk Power Corp |
| To: | Stello V Office of Nuclear Reactor Regulation |
| References | |
| Download: ML17037B588 (4) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM
< RIDS)
DISTRIBUTION FOR INCOMING MATERIAL
~~XO-.
O. ~.
REC:
STELLO V ORG:
DISE D P DOCDATE: 05/26/78 NRC NIAGARA MOHAWK PWR DATE RCVD: 06/05/78 DOCTYPE:
LETTER NOTARIZED:
NO COPIES RECEIVED
SUBJECT:
LTR 1
ENCL 0
RESPONSE
TO NRC REQUEST OF 03/20/78... ADVISING EVALUATION OF THE EFFECT ON SUBJECT FACILITY"S CONTAINMENT OF MULTIPLE SUBSEQUENT ACTUATIONS OF SAFETY/RELIEF VALVES FOI LOWING A POSTULATED ISOLATION EVI=NT WILL BE SUBMITTED ON OR BEFORE 07f31/78.
r PLANT NAME: NINE MILF F'T UNIT REVIEWER INITIAL:
XJM DISTRIBUTOR INITIAL:
DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ++++++++>>+>++>>++
MARK I CONTAINMENT (RELATED INFO ON INDIVIDUALDOCKETS >
< DISTRIBUTION CODE A025)
FOR ACTION:
INTERNAL:
EXTERNAL:
REG FII 'LTR ONLY< 1)
U~~LTR ONLY(i>
CASE~~+LTR ONLY(i)
DEPUTY DIR DPM++LTR ONLY(1>
STRUCTURAL ENG BR4t<LTR ONLY< 1)
PLANT SYSTEMS BR++LTR ONLY(2>
AD FOR PLANT SYSTEMS44LTR ONLY<
ENGINEERING BR~+LTR ONLY(i >
LPDR S
OSWEGO NY++LTR ONLY(i)
TIC+4LTR ONLY(1)
NSIC~~LTR,. ONLY< 1)
NRC PDR44LTR ONLY<i)
GOSSICK
- 8. STAFF+>LTR ONLY(1 >
DIRECTOR DPM4LTR ONLY(i)
I 8c E+%LTR ONLY(2)
GUIBERT+4LTR ONLY(i)
AD FOR OPER TECH>~LTR ONLY(2)
CONTAINMENT SYSTEMS+4LTR ONLY< 1 AD FOR ENG++LTR ONLY(i>
BR CHIEF ORB 53 CHIEF44LTR ONLY (Q)
DISTRIBUTION:
LTR 44 ENCL 0 SIZE:
1P CONTROL NBR:
78156 073 4%0H+4 %%%%%%4M 5%4%%%%%%%% 4%%0Hrfr+%%+
THE END 4 %4 4%NN%4+ H.wr:
l rl
NIAGARAMOHAWKPOWER CORPORATION
,,i,ttlt~,
NIAGARA '~
MOHAWK 300 ERIE BOULEVARD. WEST SYRACUSE, N. Y. I3202 May 26, 1978 Director of Nuclear Reactor Regulation Attn:
Mr. V. Stello, Jr., Director Division of Operating Reactors U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555 1
0 I
Gentlemen:
Re:
Nine Mile Point Unit 1 Docket No. 50-220 DPR-63 Your letter of March 20, 1978 requested an evaluation of the effect on the Nine Mile Point Unit 1 containment of multiple subsequent actuations of safety/relief valves following a postulated isolation event.
Your letter also transmitted criteria for this evaluation.
This evaluation is part of the Mark I Containment Long Term, Program; therefoxe a common approach will be taken.
Due to the generic issues
- involved, we are unable to submit a response in the time frame requested.
- However, an evaluation for Nine Mile Point Unit 1 will be submitted on or before July 31, 1978.
Very truly yours,
.; ~
PPPD" NIAGARA MOHAWK POWER CORPORATION Donald P. Disc Vice President-Engineering MGM/szd 78156007,3
1 I
1)