ML17037B568
| ML17037B568 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 02/20/1976 |
| From: | Rhode G Niagara Mohawk Power Corp |
| To: | Lear G Office of Nuclear Reactor Regulation |
| References | |
| Download: ML17037B568 (4) | |
Text
U.S. NUCLEAR REGULATORY COMMISSION blRC FORM 195 I2-76)i'RC DISTRIBUTION FDR PART 50 DOCKET MATERIAL DOCKET NUh@E)
FILE NUMBER TO:
G. Lear FRoNI: Niagara Mohawk Power Corp.
- Syracuse, N.Y.
G.K.
Rhode DATE OF DOCUMENT DATE RECEIVED 2 CILETTER QORIGINAL C3COPY ONOTORIZED GIUNC LASSIFIE D PROP INPUT FORM NUMBER OF COPIES RECEIVED 1
DESCRIPTION Ltr. re their*ltr. of 2-6-76...
'A'dvising that a Plant analysis is currently
- underway, Completion date es schedualed for me April 1976...;.
ENCLOSU RE i
'i gg.
Nine Miihe pt 8
1 SAFETY ASSIGNED AD:
BRANCH CHXEF.
PROJECT MANAGER:
C.
S"r.:
FOR ACTION/INFORMATION ASSIGNED AD:
BRANCH CHIEF :
PROJECT MANAGER..
ENVIRO XC Ag~P1 @tan
- DO NOT REMOVE ACKNQ'g'l'LEDGED INTERNALD ISTRl BUTION NRC PDR I&E GOSSXCK & STAFF pDR ~
swe o
IC NS ASLB N0 C FORM 196 I2.76)
EI PROJECT MANAGEMENT BOYD P
COLLXNS HOUSTOil PETERSON MELTZ HELTEMES SKOVHOLT EN XNEER N KNIGHT SIHWEIL PAWLICKI REACTOR SAFETY ROSS NOVAK ROSZTOCZY CHECK AT & I SALTZMAN RUTBERG EXTERNALDISTRIBUTION NATL LAB REG, V-IE LA PDR CONSULTANTS BENAROYA IPPOLITO OPERATING REACTORS STELLO OPERATXNG TECH EISEN'HUT HAO AER CHIPENCER INDIES SITE SAFETY & ENV R ANALYSIS DENTON &
HULLER'ROOKH VEN NATL LAB ULRIKSON(ORNL)
ERNST ALLARD SPAr OGLER SITE TECH GAI91ILL STEPP HULMAN SITE ANALYSIS VOL72IER BUNCH J,
COLLINS KREGER CONTROL NUMBER 1763
t ~
~
~ ~
I
~
gal p8 Pet v
'V Repufatory NIAGARAMOHAWKPOWER CORPORATION
,elm NIAGARA '
MOHAWK 300 ERIE BOULEVARD WEST SYRACUSE. N. Y. 13202 Director of Nuclear Reactor Regula Attention:
Mr. George Lear, Chief Branch 83 U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Re:
February "20, 1976uk~
zq,y D:,,
f/Py
.,'nt Unit 1 DOCKI11D USIIC F
B 319760 Moll Stenos Doe41 Clsk DPR-63 Docke No. 50-220 V
Dear Mr. Lear:
Our February 6, 1976 letter reported that an independent review was underway of information presented by General Electric and Bechtel at a January 28, 1976 meeting with the Commission.
That'review has been completed and confirms the conclusion presented at the meeting.
The continued opera-tion of Nine Mile Point Unit 1 does not present an undue safety hazard to the public, since the containment integrity would be maintained in the event of a Design Basis Accident.
A plant specific analysis, which was rectuested at the January 28 meeting, is currently underway.
Completion is scheduled for mig-April, 1976.
Very truly yours, NIAGARA MOHAWK POWER CORPORATION erald ode Vice Presid nt-Engineering GKH:cp