Letter Regarding the Operation of Nine Mile Point Unit 1 Does Not Present an Undue Safety Hazard to the Public, Since the Containment Integrity Would Be Maintained in the Event of a Design Basis Accident
ML17037B568
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/20/1976
From: Rhode G
Niagara Mohawk Power Corp
To: Lear G
Office of Nuclear Reactor Regulation
References
Download: ML17037B568 (4)


Text

U.S. NUCLEAR REGULATORY COMMISSION blRC FORM 195 I2-76)i'RC DISTRIBUTION FDR PART 50 DOCKET MATERIAL DOCKET NUh@E)

FILE NUMBER TO:

G. Lear FRoNI: Niagara Mohawk Power Corp.

Syracuse, N.Y.

G.K.

Rhode DATE OF DOCUMENT DATE RECEIVED 2 CILETTER QORIGINAL C3COPY ONOTORIZED GIUNC LASSIFIE D PROP INPUT FORM NUMBER OF COPIES RECEIVED 1

DESCRIPTION Ltr. re their*ltr. of 2-6-76...

'A'dvising that a Plant analysis is currently

underway, Completion date es schedualed for me April 1976...;.

ENCLOSU RE i

'i gg.

Nine Miihe pt 8

1 SAFETY ASSIGNED AD:

BRANCH CHXEF.

PROJECT MANAGER:

C.

S"r.:

FOR ACTION/INFORMATION ASSIGNED AD:

BRANCH CHIEF :

PROJECT MANAGER..

ENVIRO XC Ag~P1 @tan

  • DO NOT REMOVE ACKNQ'g'l'LEDGED INTERNALD ISTRl BUTION NRC PDR I&E GOSSXCK & STAFF pDR ~

swe o

IC NS ASLB N0 C FORM 196 I2.76)

EI PROJECT MANAGEMENT BOYD P

COLLXNS HOUSTOil PETERSON MELTZ HELTEMES SKOVHOLT EN XNEER N KNIGHT SIHWEIL PAWLICKI REACTOR SAFETY ROSS NOVAK ROSZTOCZY CHECK AT & I SALTZMAN RUTBERG EXTERNALDISTRIBUTION NATL LAB REG, V-IE LA PDR CONSULTANTS BENAROYA IPPOLITO OPERATING REACTORS STELLO OPERATXNG TECH EISEN'HUT HAO AER CHIPENCER INDIES SITE SAFETY & ENV R ANALYSIS DENTON &

HULLER'ROOKH VEN NATL LAB ULRIKSON(ORNL)

ERNST ALLARD SPAr OGLER SITE TECH GAI91ILL STEPP HULMAN SITE ANALYSIS VOL72IER BUNCH J,

COLLINS KREGER CONTROL NUMBER 1763

t ~

~

~ ~

I

~

gal p8 Pet v

'V Repufatory NIAGARAMOHAWKPOWER CORPORATION

,elm NIAGARA '

MOHAWK 300 ERIE BOULEVARD WEST SYRACUSE. N. Y. 13202 Director of Nuclear Reactor Regula Attention:

Mr. George Lear, Chief Branch 83 U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Re:

February "20, 1976uk~

zq,y D:,,

f/Py

.,'nt Unit 1 DOCKI11D USIIC F

B 319760 Moll Stenos Doe41 Clsk DPR-63 Docke No. 50-220 V

Dear Mr. Lear:

Our February 6, 1976 letter reported that an independent review was underway of information presented by General Electric and Bechtel at a January 28, 1976 meeting with the Commission.

That'review has been completed and confirms the conclusion presented at the meeting.

The continued opera-tion of Nine Mile Point Unit 1 does not present an undue safety hazard to the public, since the containment integrity would be maintained in the event of a Design Basis Accident.

A plant specific analysis, which was rectuested at the January 28 meeting, is currently underway.

Completion is scheduled for mig-April, 1976.

Very truly yours, NIAGARA MOHAWK POWER CORPORATION erald ode Vice Presid nt-Engineering GKH:cp