ML17037B521

From kanterella
Jump to navigation Jump to search
Letter Indicating That the Containment Atmospheric Dilution System Will Not Be Operable Until 10/31/1977
ML17037B521
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/20/1977
From: Rhode G
Niagara Mohawk Power Corp
To: Lear G
Office of Nuclear Reactor Regulation
References
Download: ML17037B521 (4)


Text

U.S. NUCLEAR REGUI ATORY I 'ISSION

&~A i

~e

,C'DISTRIBUTION FDR PART 50 DOCKET MATERIAL NRC FoRM 195

'2-7S) r<I~

'TO Mr. George-Lear-FROM:

Niagara Mohawk Power Corpn

Syracuse, New York Gerald Ki Rhode DISTRIBUTION AFTER ISSUANCE OF OPERATING LICENSE DOC~ET NUMBER

- RXD FILE NUMBER DATE OF DOCUMENT 9/20/77 DATE RE C El V E 0 9/23/77 lglg.ETTER RIGINAL COPY 0 NOTOR I2EO UNC LASS IF I E 0 PROP INPUT FORM NUMBER Of COPIES RECEIVED i

DESCRIPTION gee/

Indicatea that the Containment Atmospheric Dilution'ystem willnot-be-operable until 10/31/77

~ ~ ~ ~ ~

ENCLOSU RE I

I j

pptn'p gtNE: Nine Mile paint Unit Nn ~

1 RZL 9/23/77 (1-P)

SAFETY BRANCH CHIEF:

7 FOR ACTION/INFORMATION INTERNAL0 ISTRIBUTION NRC PDR I

G E (2)

OELD HANAUER CHECK STELLO E ISENHUT SHAO BUTLER GRIIIES J.

COLLI S LPDR:

TIC NSIC 16 CYS ACRS SENT CATE 0 EXTERNALOISTRIBUTION CONTROL NUMBER zr~CSo

-4 Wl Kl

BIER)5,'Ilfgg(f(I ((I:@pe NIAGARAMOHAWKPOWER CORPORATION NIAGARA ~

MOHAWK 300 ERIE BOULEVARD. WEST SYRACUSE, N. Y. I3202 September 20, 1977 Director of Nuclear Reactor Regulation Attn:

Mr. George Lear, Chief Operating Reactors Branch g3 U.. S. Nuclear Regulatory Commission Washington, D.

C.

20555 CD Re:

Nine Mile Point Unit 1 Docket No. 50-220 DPR-63 S -

p p ~ ~.ljI EcE7vEQ SEP g3 797' i hVQg42 2~

CO~I~>IO

. I02,'CI i~

>J4I &ctIog~

~ElgI'O~'entlemen:

My letter of March 8, 1977 indicated that we planned to have the Containment Atmospheric Dilution System operable by September 30, 1977.

However, due to procurement delays with obtaining ASME code cryogenic relief valves and the associated delays in performing pre-operational
tests, the system cannot be operable until October 31, 1977.

In the interim., capability for nitrogen addition and manual venting will be maintained.

Sincerely, NIAGARA MOHAWK POWER CORPORATION G raid Rhode Vice Presiden ngineering MGM/szd gpss 0'

r

'I

'tA'i~

f3o C7

~rn I

~

I t

~

1 II I ~

I

~

I I