Letter Sequence Approval |
---|
|
|
MONTHYEARML16047A2722016-02-10010 February 2016 License Amendment Request: Revise Technical Specification 5.5.11 to Provide a Permanent Extension of the Integrated Leakage Rate (Type a) Test Frequency from Ten to Fifteen Years Project stage: Other ML16082A3712016-03-22022 March 2016 NRR E-mail Capture - Monticello Nuclear Generating Plant - NRC Staff'S Acceptance Review Results for February 10, 2016 License Amendment Request Related to Integrated Leak Rate Type a Testing Project stage: Acceptance Review ML16256A0042016-09-0909 September 2016 NRR E-mail Capture - Request for Additional Information Monticello License Amendment Request for ILRT Extension Project stage: RAI L-MT-16-044, Response to Request for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval2016-10-10010 October 2016 Response to Request for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval Project stage: Response to RAI ML16323A2422016-11-18018 November 2016 NRR E-mail Capture - Monticello ILRT Extension Amendment Request for Additional Information Project stage: RAI L-MT-16-062, Part 1 Response to Probabilistic Risk Assessment Related Requests for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval2016-12-16016 December 2016 Part 1 Response to Probabilistic Risk Assessment Related Requests for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval Project stage: Request L-MT-17-002, Part 2 Response to Probabilistic Risk Assessment (PRA) Related Requests for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50Appendix J Containment Type a Test Interval2017-01-31031 January 2017 Part 2 Response to Probabilistic Risk Assessment (PRA) Related Requests for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50Appendix J Containment Type a Test Interval Project stage: Request L-MT-17-007, Part 3 Response to Probabilistic Risk Assessment (PRA) Related Requests for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval2017-02-0707 February 2017 Part 3 Response to Probabilistic Risk Assessment (PRA) Related Requests for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval Project stage: Request ML17033A0452017-02-0909 February 2017 Summary of the Audit to Support the Review of the Monticello Nuclear Generating Plant License Amendment Request to Extended the Integrated Leak Rate Test Frequency Project stage: Approval L-MT-17-011, Supplement to License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval2017-02-16016 February 2017 Supplement to License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval Project stage: Supplement ML17086A0602017-03-27027 March 2017 NRR E-mail Capture - Request for Additional Information Monticello Nuclear Generating Plant Integrated Leak Rate Test Interval Extension Request Project stage: RAI L-MT-17-022, Response to Second Round PRA Related RAIs for the License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval2017-03-29029 March 2017 Response to Second Round PRA Related RAIs for the License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval Project stage: Request ML17090A2442017-04-0606 April 2017 Summary of February 28, 2017, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on the Integrated Leak Rate Test License Amendment Request for Monticello Nuclear Generating Plant CAC No. MF7359) Project stage: Meeting ML17103A2352017-04-25025 April 2017 Issuance of Amendment Technical Specification 5.5.11 Primary Containment Leakage Rate Testing Program Project stage: Approval 2017-01-31
[Table View] |
|
---|
Category:Audit Report
MONTHYEARML24047A0922024-02-26026 February 2024 Limited-Scope Audit Report for Buried Piping and External Surfaces AMPs ML23214A2412023-08-31031 August 2023 Letter: Aging Management Audit - Monticello Unit 1 - Subsequent License Renewal Application ML22308A1962022-11-10010 November 2022 Regulatory Audit Report Regarding License Amendment Request to Transition to Atrium 11 Fuel ML20328A0382021-01-0808 January 2021 Regulatory Audit Summary License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times RITSTF Initiative 4B ML18130A9212018-05-14014 May 2018 Correction to the Report for the Audit of Lic. Responses to Interim Staff Eval. Open Items Related to U.S. Nuclear Regulatory Commission Order EA-13-109 to Modify Lic. with Regard to Reliable.....Supersedes ML18094A804 ML17096A4432017-04-18018 April 2017 Audit Report Relating to the Flood Hazard Reevaluation Report ML17033A0452017-02-0909 February 2017 Summary of the Audit to Support the Review of the Monticello Nuclear Generating Plant License Amendment Request to Extended the Integrated Leak Rate Test Frequency ML15245A4692015-09-22022 September 2015 Audit of the Licensee'S Management of Regulatory Commitments ML15072A0982015-03-17017 March 2015 Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML12198A5072012-09-0707 September 2012 Audit of Licensee'S Management of Regulatory Commitments ML0920401752009-08-0505 August 2009 Audit of Licensee Commitments and Commitment Management Program ML0612806232006-08-23023 August 2006 Audit Report of Commitment Management System ML0528504612005-10-12012 October 2005 October 12, 2005 - Audit and Review Report for Plant Aging Management Reviews and Programs for Monticello Nuclear Generating Plant ML0520102422004-04-24024 April 2004 U.S. EPA Green Book - Nonattainment Status for Each County by Year from the Monticello Environmental Site Audit 2024-02-26
[Table view] Category:Letter
MONTHYEARML24283A1192024-10-28028 October 2024 Letter to Shawn Hafen, Re Monticello Subsequent License Renewal Schedule Change L-MT-24-038, Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI2024-10-15015 October 2024 Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI ML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 ML24199A1752024-10-0101 October 2024 Issuance of Amendment No. 212 Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 IR 05000263/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000263/2024011 L-MT-24-025, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2024-09-26026 September 2024 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements L-MT-24-029, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI2024-09-13013 September 2024 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI IR 05000263/20240052024-08-30030 August 2024 Updated Inspection Plan and Follow-Up Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2024005) L-MT-24-028, Response to RCI for RR-017 ISI Impracticality2024-08-28028 August 2024 Response to RCI for RR-017 ISI Impracticality ML24222A1822024-08-27027 August 2024 – Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves 05000263/LER-2024-002, Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure2024-08-27027 August 2024 Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure IR 05000263/20244202024-08-21021 August 2024 Security Baseline Inspection Report 05000263/2024420 - Cover Letter IR 05000263/20240022024-08-14014 August 2024 Integrated Inspection Report 05000263/2024002 ML24218A2282024-08-0505 August 2024 Request for Confirmation of Information for Relief Request RR-017, Inservice Inspection Impracticality During the Fifth Ten-Year Interval ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24215A2992024-07-23023 July 2024 Minnesota State Historic Preservation Office Comments on Monticello SLR Draft EIS ML24198A2372024-07-18018 July 2024 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Monticello Nuclear Generating Plant L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24164A2402024-06-10010 June 2024 Minnesota State Historic Preservation Office- Comments on Draft Monticello SLR Draft EIS L-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 ML24137A2792024-06-0303 June 2024 Audit Summary for License Amendment Request to Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A1782024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-MT-24-015, Response to Request for Additional Information - Alternative Request VR-09 for OMN-172024-05-16016 May 2024 Response to Request for Additional Information - Alternative Request VR-09 for OMN-17 L-MT-24-013, 2023 Annual Radiological Environmental Operating Report2024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24135A1902024-05-14014 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report IR 05000263/20240102024-05-13013 May 2024 Age-Related Degrading Inspection Report 05000263/2024010 ML24128A0042024-05-0909 May 2024 Letter to Minnesota State Historic Preservation Office- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renewal Application ML24127A1472024-05-0909 May 2024 Letter to Mille Lacs Band- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renew. Application L-MT-24-016, 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2024-05-0808 May 2024 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000263/20240012024-04-29029 April 2024 Plan - Integrated Inspection Report 05000263/2024001 ML24115A2902024-04-25025 April 2024 Sec106 Tribal, Jackson-Street, Lonna-Spirit Lake Nation ML24115A2872024-04-25025 April 2024 Sec106 Tribal, Dupuis, Kevin-Fond Du Lac Band of Lake Superior Chippewa ML24115A2932024-04-25025 April 2024 Sec106 Tribal, Johnson, Grant-Prairie Island Indian Community ML24115A3062024-04-25025 April 2024 Sec106 Tribal, Wassana, Reggie-Cheyenne and Arapaho Tribes 05000263/LER-2024-001, Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component2024-04-25025 April 2024 Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component ML24115A3032024-04-25025 April 2024 Sec106 Tribal, Taylor, Louis-Lac Courte Oreilles Band of Lake Superior Chippewa Indians ML24115A3002024-04-25025 April 2024 Sec106 Tribal, Rhodd, Timothy-Iowa Tribe of Kansas and Nebraska ML24115A2972024-04-25025 April 2024 Sec106 Tribal, Miller, Cole-Shakopee Mdewakanton Sioux Community ML24115A2962024-04-25025 April 2024 Sec106 Tribal, Larsen, Robert-Lower Sioux Indian Community ML24115A2952024-04-25025 April 2024 Sec106 Tribal, Kakkak, Gena-Menominee Indian Tribe of Wisconsin ML24115A2982024-04-25025 April 2024 Sec106 Tribal, Reider, Anthony-Flandreau Santee Sioux Tribe ML24115A2912024-04-25025 April 2024 Sec106 Tribal, Jacskon, Sr., Faron-Leech Lake Band of Ojibwe ML24115A3052024-04-25025 April 2024 Sec106 Tribal, Vanzile, Jr., Robert-Sokaogon Chippewa Community ML24115A2992024-04-25025 April 2024 Sec106 Tribal, Renville, J. Garret-Sisseton Wahpeton Oyate of the Lake Travers Reservation ML24115A3022024-04-25025 April 2024 Sec106 Tribal, Stiffarm, Jeffrey-Fort Belknap Indian Community ML24115A3072024-04-25025 April 2024 Sec106 Tribal, Williams, Jr., James-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24115A2892024-04-25025 April 2024 Sec106 Tribal, Fowler, Thomas-St. Croix Chippewa of Wisconsin 2024-09-26
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 9, 2017 Mr. Peter A. Gardner Site Vice President Monticello Nuclear Generating Plant Northern States Power Company - Minnesota (NSPM) 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
MONTICELLO NUCELAR GENERATING PLANT -
SUMMARY
OF THE AUDIT TO SUPPORT THE REVIEW OF THE MONTICELLO NUCLEAR GENERATING PLANT LICENSE AMENDMENT REQUEST TO EXTEND THE INTEGRATED LEAK RATE TEST FREQUENCY (CAC NO. MF7359)
Dear Mr. Gardner:
By letter to the U.S. Nuclear Regulatory Commission (NRC) dated February 10, 2016, Northern States Power Company doing business as Xcel Energy Inc. (Xcel) submitted a license amendment request (LAR) to revise technical specification 5.5.11 to provide a permanent extension of the integrated leakage rate test frequency from 10 to 15 years for the Monticello Nuclear Generating Plant.
To enhance the NRC staff's review of the request, the NRC staff conducted a regulatory audit on October 13 and 14, 2016, related to the probabilistic risk assessment portion of the LAR.
The staff reviewed documents and held discussions with members of Xcel and its contractor, Jensen Hughes. The regulatory audit summary is enclosed.
While the NRC review team did not identify any significant issues during its audit or during the discussions with Xcel and its contractor, the team indicated that the review was ongoing.
If you have any questions, please contact me at (301) 415-3733.
J
~ 1 (unt , enior Project Manager Plant censing ranch Ill Div.is.on of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263
Enclosure:
Regulatory Audit Summary cc w/encl: Distribution via ListServ
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 REGULATORY AUDIT
SUMMARY
RELATED TO LICENSE AMENDMENT REQUEST REGARDING THE INTEGRATED LEAK RATE TEST FREQUENCY NORTHERN STATES POWER COMPANY MONTICELLO NUCLEAR GENERATING PLANT DOCKET NO. 50-263 Date of Audit: October 13-14, 2016 Audit Location: Bethesda North Marriott Hotel & Conference Center 5701 Marinelli Rd, North Bethesda, MD 20852 NRC Audit Team Members:
Robert Kuntz, Project Manager Dan O'Neal, Technical Reviewer Mihaela Biro, Technical Reviewer Martin Stutzke, Technical Reviewer Anders Gilbertson, Technical Reviewer FENOC and Contractor
Participants:
Katherine Brandtjen, Northern States Power Corporation doing business as Xcel Energy Inc. (Xcel)
Rick Loeffler, Xcel Timothy Wellumson, Xcel John Fields, Xcel Steve Hammer, Xcel Rick Zyduck, Xcel Matthew Johnson, Jensen Hughes Rick Anoba, Jensen Hughes Documents Audited:
Presentation slides on Containment Accident Pressure NEDC-33347P Enclosure
Summary of Audit Activities:
The licensee provided a slide presentation overview and technical presentation on containment accident pressure (CAP) for MNGP, and the basis for the CAP approach taken in the license amendment request (LAR). The NRC discussed its assessment of MNGP CAP-related risk using a Semi-Markov model approach described in an NRC report (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12234A561 ). The licensee's CAP risk assessment given in the LAR and CAP related key uncertainties and assumptions, were also covered.
Request for Additional Information:
The audit of the documents resulted in the formation of requests for additional informational (RAls). Subsequent to the audit, the NRC staff issued an RAI based on its review of the LAR and the regulatory audit. The NRC staff's RAI was issued on November 18, 2016 (ADAMS Accession No. ML16323A242).
ML17033A045 *via email/memo dated OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DSS/APLA/BC* NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM NAME RKuntz SRohrer SRosenberg DWrona RKuntz DATE 2/2/17 2/2/17 2/3/17 2/8/17 2/9/17