ML17027A048

From kanterella
Jump to navigation Jump to search
NRR E-mail Capture - LIC-109 Acceptance Review of the St. Lucie 1 & 2 LAR to Relocate Component Cyclic or Transient Limits Program Reqs (MF8966, MF8967)
ML17027A048
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 01/27/2017
From: Perry Buckberg
Plant Licensing Branch II
To: Frehafer K
Florida Power & Light Co
References
MF8966, MF8967
Download: ML17027A048 (3)


Text

NRR-PMDAPEm Resource From: Buckberg, Perry Sent: Friday, January 27, 2017 7:42 AM To: 'Frehafer, Ken' Cc: 'Snyder, Mike'; Beasley, Benjamin

Subject:

LIC-109 Acceptance Review of the St. Lucie 1 & 2 LAR to relocate Component Cyclic or Transient Limits Program reqs (MF8966, MF8967)

Ken, By letter dated November 22, 2016, Florida Power & Light submitted a license amendment request (LAR) for St. Lucie Units 1 & 2. The proposed amendments would relocate the Component Cyclic or Transient Limits Program requirements to the Administrative Controls sections of the St. Lucie Unit 1 and St. Lucie Unit 2 Technical Specifications (TS), and relocate the Component Cyclic or Transient Limits tables detailing the allowable limits from the respective TS to licensee-controlled documents. The purpose of this communication is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR.

The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your LAR and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 160 hours6.667 days <br />0.952 weeks <br />0.219 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which will be in November 2017. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact the St. Lucie Project Manager, Perry Buckberg, at (301) 415-1383.

Thanks, 1

Perry Buckberg Senior Project Manager phone: (301)415-1383 perry.buckberg@nrc.gov U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop O-8G9a Washington, DC, 20555-0001 2

Hearing Identifier: NRR_PMDA Email Number: 3295 Mail Envelope Properties (1ca8aad1af254180920e7f80ded9a828)

Subject:

LIC-109 Acceptance Review of the St. Lucie 1 & 2 LAR to relocate Component Cyclic or Transient Limits Program reqs (MF8966, MF8967)

Sent Date: 1/27/2017 7:42:01 AM Received Date: 1/27/2017 7:42:02 AM From: Buckberg, Perry Created By: Perry.Buckberg@nrc.gov Recipients:

"'Snyder, Mike'" <Mike.Snyder@fpl.com>

Tracking Status: None "Beasley, Benjamin" <Benjamin.Beasley@nrc.gov>

Tracking Status: None

"'Frehafer, Ken'" <Ken.Frehafer@fpl.com>

Tracking Status: None Post Office: HQPWMSMRS02.nrc.gov Files Size Date & Time MESSAGE 3787 1/27/2017 7:42:02 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: