ML17010A030

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Acceptance Review of Relief Request EN-ISI-16-1 for ANO-2 and IP-3
ML17010A030
Person / Time
Site: Indian Point, Arkansas Nuclear  Entergy icon.png
Issue date: 01/09/2017
From: Watford M
Plant Licensing Branch IV
To: Ford B
Entergy Nuclear Operations
References
MF8905, MF8906
Download: ML17010A030 (2)


Text

1 NRR-PMDAPEm Resource From:

Watford, Margaret Sent:

Monday, January 09, 2017 3:35 PM To:

'bford@entergy.com'; 'wcros90@entergy.com'

Subject:

ANO2 and IP3 - Acceptance Review of Relief Request EN-ISI-16-1 (CAC Nos. MF8905 and MF8906)

Mr. Ford, By letter dated December 1, 2016 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML16337A368), Entergy Nuclear Operations, Inc. (Entergy, the licensee) submitted a relief request (EN-ISI-16-1) for Arkansas Nuclear One, Unit 2 (ANO2) and Indian Point Nuclear Generating Station, Unit 3 (IP3). The licensee has requested to use the 2007 Edition/2008 Addenda of American Society of Mechanical Engineers (ASME)Section XI for the performance of Inservice Inspection (ISI) related activities associated with Entergys repair/replacement, pressure testing, and nondestructive examination programs during the Fourth 10-Year ISI Intervals for ANO2 and IP3. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is November 2017. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me at (301) 415-1233.

Maggie Watford, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Hearing Identifier:

NRR_PMDA Email Number:

3253 Mail Envelope Properties (5d73784cd043448ca4c42729a0f5eaa5)

Subject:

ANO2 and IP3 - Acceptance Review of Relief Request EN-ISI-16-1 (CAC Nos.

MF8905 and MF8906)

Sent Date:

1/9/2017 3:34:36 PM Received Date:

1/9/2017 3:34:36 PM From:

Watford, Margaret Created By:

Margaret.Watford@nrc.gov Recipients:

"'bford@entergy.com'" <bford@entergy.com>

Tracking Status: None

"'wcros90@entergy.com'" <wcros90@entergy.com>

Tracking Status: None Post Office:

HQPWMSMRS04.nrc.gov Files Size Date & Time MESSAGE 3291 1/9/2017 3:34:36 PM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received: