ML17006A017
| ML17006A017 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 12/30/2016 |
| From: | Lacal M Arizona Public Service Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| 102-07398-MLL/MAM | |
| Download: ML17006A017 (2) | |
Text
ENCLOSURES CONTAIN SECURITY-RELATED INFORMATION -WITHHOLD UNDER 10 CFR 2.390 Oaps 102-07398-MLL/MAM December 30, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3 Docket No. STN 50-528; 50-529; 50-530 and 72-44 License No. NPF-41; NPF-51; NPF-74 PVNGS Cyber Security Plan, Revision 2 10 CFR 50.54(p)
MARIA L. LACAL Senior Vice President Nuclear Regulatory and Oversight Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7605 Tel 623.393.6491 Pursuant to 10 CFR 50.54(p), Arizona Public Service (APS) hereby submits Revision 2 of the PVNGS Cyber Security Plan (CSP). This revision was implemented on November 23, 2016 and is attached in its entirety in Enclosure 1. Changes, which are largely administrative, are itemized in Enclosure 2.
APS has evaluated the Plan changes in accordance with 10 CFR 50.54(p) and concluded that the revision does not result in a decrease in effectiveness of the Plan.
No commitments are being made to the NRC by this letter.
Should you have questions concerning this matter, please contact Nickolas Sylvester, Cyber Security Department Section Leader, at 623-393-7432.
Sincerely, MLL/MAM
Enclosures:
- 1) PVNGS Cyber Security Plan, Revision 2
- 2) PVNGS Cyber Security.Plan, Rev 2, Description of Changes Report A member of STARS Alliance LLC Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek Enclosures transmitted herewith contain SECURITY-RELATED information.
When separated from enclosures, this transmittal document is decontrolled.
102-07398-MML/MAM ATIN: Document Control Desk U.S. Nuclear Regulatory Commission PVNGS Cyber Security Plan, Revision 2 Page 2 cc:
K. M. Kennedy S. P. Lingam M. M. Watford C. A. Peabody G. E. Werner NRC Region IV Regional Administrator NRC NRR Project Manager for PVNGS NRC NRR Project Manager NRC Senior Resident Inspector for PVNGS NRC Region IV DRS/EB2 Branch Chief A member of STARS Alliance LLC Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek