Acceptance of Requested Licensing Action Regarding Requests Associated with the Fourth Interval Inservice Testing Program, RP-02, and RP-03
ML17004A047
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 01/04/2017
From: Bhalchandra Vaidya
Plant Licensing Branch III
To: Bryan Hanson
Exelon Generation Co
Vaidya B, DORL/LPLIII, 415-3308
References
CAC MF8494, CAC MF8495, CAC MF8496, CAC MF8497
Download: ML17004A047 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 4, 2017 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)

Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

LASALLE COUNTY STATION, UNITS 1 AND 2, ACCEPTANCE OF REQUESTED LICENSING ACTION REGARDING REQUESTS ASSOCIATED WITH THE FOURTH INTERVAL INSERVICE TESTING PROGRAM, RP-02 AND RP-03 (CAC NOS. MF8494, MF8495, MF8496, AND MF8497)

Dear Mr. Hanson:

By letter dated October 17, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16292A488), Exelon Generation Company, LLC (EGC), Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(1) and z(2), requests the U.S.

Nuclear Regulatory Commission (NRC) approval of the relief requests (RRs) associated with the fourth 10-year interval inservice testing (IST) program for LaSalle County Station (LSCS),

Units 1 and 2. The ISi interval is as follows:

  • RR RP-03, Utilization of ASME [American Society of Mechanical Engineers] Code Case OMN-21, "Alternative Requirements for Adjusting Hydraulic Parameters to Specified Reference Points" - Proposed Alternative In Accordance with 10 CFR 50.55a(z)(1 ),

(CAC Nos. MF8496 and MF8497).

The purpose of this letter is to provide the results of the NRC staff's acceptance review of this RR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to 10 CFR 50.55a(z)(1) and z(2), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of 10 CFR 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable staff to complete its detailed technical review, make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements, and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the

B. C. Hanson 2 detailed technical review, there may be instances in V'v'hich issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the staff's detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 200 hours8.333 days <br />1.19 weeks <br />0.274 months <br /> for CAC Nos. MF8494 an MF8495, and 200 hours8.333 days <br />1.19 weeks <br />0.274 months <br /> for CAC Nos. MF8496 and MF8497 to complete. The NRC staff expects to complete this review in approximately 12 months (October 2017). If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staff's initial review of the application and could change, due to several factors, including requests for additional information and unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me, at (301) 415-3308 Sincerely, Bhalchandra Vaidya, Project Manager Plant Licensing Branch 111 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374 cc: Distribution via ListServ

B. C. Hanson detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the staff's detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 200 hours8.333 days <br />1.19 weeks <br />0.274 months <br /> for CAC Nos. MF8494 an MF8495, and 200 hours8.333 days <br />1.19 weeks <br />0.274 months <br /> for CAC Nos. MF8496 and MF8497 to complete. The NRC staff expects to complete this review in approximately 12 months (October 2017). If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staff's initial review of the application and could change, due to several factors, including requests for additional information and unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me, at (301) 415-3308 Sincerely,

/RAJ Bhalchandra Vaidya, Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-37 4 cc: Distribution via ListServ DISTRIBUTION:

PUBLIC RidsNrrPMLaSalle Resource RidsOgcRp Resource LPL3 R/F RidsRgn3MailCenter Resource J. Billerbeck, NRR RidsNrrDorlLpl3 Resource RidsNrrDeEpnb Resource RidsNrrLASRohrer Resource RidsAcrs_MailCTR Resource ADAMS Accession: ML17004A047 (*) concurrence By Email OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/EPNB/BC NRR/DORL/LPL3/BC NRR/DORL/LPL3/P NAME BVaidya SRohrer DAiiey(*) DWrona BVaidya DATE 01/04/2017 01/03/2017 01/04/2017 01/04/2017 01/04/2017 OFFICIAL RECORD COPY