ML16351A403

From kanterella
Jump to navigation Jump to search
7 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.4.2-1A
ML16351A403
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/24/2016
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16336A263 List: ... further results
References
AEP-NRC-2016-42
Download: ML16351A403 (1)


Text

Isometric Mainsteam From Steam Turbine to Containment Penetration Sleeve for Unit 1 This drawing is to show the High Energy Line Break Locations only and cannot be used for any construction purposes. For detail information and dimensions see Piping Iso.'s.

High Energy Line Break Locations are labeled as shown with Symbol 4"/30" Line Break.

All dimensions & Elevations are Reference only.

REVISED PER 99-UFSAR-1345 AMERICAN ELECTRIC POWER COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN REV. NO.

16.6 2.

FSAR FIG. 14.4.2-1A DWG. NO.

TITLE DESCRIPTION REVISIONS 1.

SH 1 of 1 UNIT 2 30" Line Break 30" Line Break 30" Line Break 30" Line Break 4" Line Break 4" Line Break