ML16351A403
Jump to navigation
Jump to search
Text
Isometric Mainsteam From Steam Turbine to Containment Penetration Sleeve for Unit 1 This drawing is to show the High Energy Line Break Locations only and cannot be used for any construction purposes. For detail information and dimensions see Piping Iso.'s.
High Energy Line Break Locations are labeled as shown with Symbol 4"/30" Line Break.
All dimensions & Elevations are Reference only.
REVISED PER 99-UFSAR-1345 AMERICAN ELECTRIC POWER COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN REV. NO.
16.6 2.
FSAR FIG. 14.4.2-1A DWG. NO.
TITLE DESCRIPTION REVISIONS 1.
SH 1 of 1 UNIT 2 30" Line Break 30" Line Break 30" Line Break 30" Line Break 4" Line Break 4" Line Break