MONTHYEARML24282A7042024-10-0808 October 2024 NRR E-mail Capture - Acceptance Reviews of Relief Requests Associated with the Fifth Inservice Inspection Interval at Byron and Braidwood Stations ML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24180A0042024-06-28028 June 2024 NRR E-mail Capture - Acceptance Review for Braidwood and Byron - Request for Exemption from 10 CFR 50.46 and Appendix K (L-2024-LLE-0019) ML24180A0032024-06-28028 June 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment for Transition to Framatome Gaia Fuel (L-2024-LLA-0072) ML24176A0182024-06-20020 June 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment to Remove Extraneous Detail Related to Beacon ML24170A3912024-06-18018 June 2024 NRR E-mail Capture - Revision of Estimated Hours to Complete Review of Byron/Braidwood Amendment to Revise TS 3.7.15, 3.7.16, and 4.3.1 (L-2023-LLA-0136) ML24141A2452024-05-20020 May 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment to Delete Technical Specification 5.6.5.b.5 (L-2024-LLA-0055) ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24053A3382024-02-22022 February 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23317A2012023-11-22022 November 2023 (External_Sender) Supplement - Byron Security Rule Exemption Request ISFSI Docket No. Reference ML23321A2012023-11-17017 November 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23305A2992023-11-0101 November 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 2, Relief Request I4R-24 ML23304A0202023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Byron 1 & 2 - Exemption from Security Rule (L-2023-LLE-0027) ML23272A0602023-09-29029 September 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 1, Relief Request I4R-25 ML23187A0092023-07-0606 July 2023 NRR E-mail Capture - NRC Acceptance Review of Byron and Braidwood Request to Adopt TSTF-370 ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML23115A2412023-01-20020 January 2023 NRR E-mail Capture - Preliminary RAIs Related to L-2022-LLA-0131 - Byron, Unit 2, Reinsertion of an Accident Tolerant Fuel Lead Test Assembly ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22284A1022022-10-0606 October 2022 NRR E-mail Capture - NRC Acceptance Review for Byron, Unit 2, License Amendment Request (LAR) to Reinsert an Accident Tolerant Fuel (ATF) Lead Test Assembly (LTA) (L-2022-LLA-0131) ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22189A0602022-07-0707 July 2022 NRR E-mail Capture - Draft RAI for Byron/Braidwood TSTF-501 ML22136A2722022-05-16016 May 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron Adoption of TSTF-501 ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22116A0242022-04-25025 April 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246 ML22105A0722022-04-15015 April 2022 NRR E-mail Capture - Braidwood/Byron Verbal Authorization for Proposed Alternative I4R-15/I4R-21 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22091A0842022-02-24024 February 2022 NRR E-mail Capture - Braidwood and Byron - Withdrawal of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML23089A0152022-01-0505 January 2022 NRR E-mail Capture - NRC Acceptance Review of Byron - Proposed Alternative for Examinations of Categories B-B, B-D, and C-A SG Welds and Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21272A1492021-09-29029 September 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron - Proposed Alternative for Examinations of Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0042021-08-26026 August 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood/Byron/Clinton - Adoption of TSTF-273, Safety Function Determination Program Clarifications ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21203A3112021-07-21021 July 2021 NRR E-mail Capture - Final Byron Permanently Defueled Technical Specifications (PDTS) - Second Round RAI ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21189A1612021-07-0808 July 2021 NRR E-mail Capture - Second Round Request for Additional Information - Byron Permanently Defueled Technical Specification Amendment ML21154A0172021-06-0202 June 2021 NRR E-mail Capture - Acceptance Review of Byron - Proposed Alternative for Exam of Pzr Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Shell Welds ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21123A2442021-05-0303 May 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood/Byron/Ginna - Application to Address the Issues Identified in Westinghouse Documents NSAL-09-5 and NSAL-15-1 (L-2021-LLA-0066) 2024-09-06
[Table view] |
Text
NRR-PMDAPEm Resource From: Wiebe, Joel Sent: Thursday, December 15, 2016 3:18 PM To: Jessica Krejcie
Subject:
Acceptance Review for Byron Relief Request I4R-11 By letter dated November 8, 2016 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML16320A031), Exelon Generation Company, LLC (Exelon), submitted relief request I4R-11, requesting approval of Alternative Requirements for the Repair of Reactor Vessel Head Penetrations. The request is applicable to Byron Station, Unit Nos. 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 120 hours5 days <br />0.714 weeks <br />0.164 months <br /> to complete. The NRC staff expects to complete this review in approximately 4 months, which is March 2017. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information.
If you have any questions, please contact me at (301) 415-6606.
Joel S. Wiebe, Sr. Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 1
Hearing Identifier: NRR_PMDA Email Number: 3218 Mail Envelope Properties (Joel.Wiebe@nrc.gov20161215151800)
Subject:
Acceptance Review for Byron Relief Request I4R-11 Sent Date: 12/15/2016 3:18:01 PM Received Date: 12/15/2016 3:18:00 PM From: Wiebe, Joel Created By: Joel.Wiebe@nrc.gov Recipients:
"Jessica Krejcie" <Jessica.Krejcie@exeloncorp.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2619 12/15/2016 3:18:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: