ML16344A397
Jump to navigation
Jump to search
| ML16344A397 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 10/24/2016 |
| From: | Indiana Michigan Power Co |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16336A263 | List:
|
| References | |
| AEP-NRC-2016-42 | |
| Download: ML16344A397 (1) | |
Text
IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision: 21.2 Table: 14.4.6-5 Page:
1 of 1 UNIT 2 MASS AND ENERGY RELEASE FOR STEAM LINE BREAK IN MAIN STEAM ENCLOSURE LARGE BREAK Time (sec)
Mass/Flow (lbm/sec)
Enthalpy (Btu/lbm) 0 0
1198 0.001 1 6508 1198 0.5 6508 1198 1.5 6124 1199 4.0 5599 1201 4.5 6091 1201 7.0 6091 1201 12.5 5788 1202 13.0 1976 1202 30.0 1158 1204 40.0 994.7 1204 60.0 890.3 1203 74.0 874.9 1205 75.0 866.8 1209 85.0 644.1 1245 95.0 256.2 1276 105.0 29.1 1294 200.0 29.2 1310 400.0 34.6 1312 600.0 34.6 1311 1800.00 34.6 1311 1800.01 0
1311 3600.0 0
1311 1 Full break opening assumed in 0.001 sec.