ML16344A361

From kanterella
Jump to navigation Jump to search
7 to Updated Final Safety Analysis Report, Chapter 14, Table 14.3.2-5, Safety Injection Flows Used in the SBLOCA Analysis - Injection Phase, Pages 1 - 2
ML16344A361
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/24/2016
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16336A263 List: ... further results
References
AEP-NRC-2016-42
Download: ML16344A361 (2)


Text

INDIANA AND MICHIGAN POWER D. C. COOK NUCLEAR PLANT UPDATED FINAL SAFETY ANALYSIS REPORT Revision: 24.0 Table: 14.3.2-5 Page:

1 of 2 Unit 2 Safety Injection Flows Used in the SBLOCA Analysis - Injection Phase (1 CHG pump, 1 HHSI pump, 1 RHR pump faulted loop CHG flow injects to RCS pressure and faulted loop HHSI / RHR flow spills to containment (0 psia) - 8.75-inch break)

RCS Pressure (psia)

Broken Loop (lbm / sec)

Intact Loops (lbm / sec)

Loop 1 CHG Loop 1 RHR / HHSI Loop 2 Loop 3 Loop 4 14.7 14.1 163.7 155.5 157.6 156.5 34.7 14.1 230.7 142.6 92.1 143.5 54.7 14.0 300.3 132.0 12.2 132.9 74.7 13.9 319.2 110.1 12.2 110.7 94.7 13.9 339.5 85.1 12.1 85.5 114.7 13.8 362.1 54.4 12.0 54.6 134.7 13.7 379.3 28.8 12.0 28.8 154.7 13.7 379.5 28.6 11.9 28.5 174.7 13.6 379.6 28.3 11.9 28.2 194.7 13.6 379.6 28.0 11.8 28.0 214.7 13.5 379.7 27.7 11.8 27.7 234.7 13.4 379.8 27.4 11.7 27.4 254.7 13.4 379.8 27.2 11.7 27.1 274.7 13.3 379.9 26.9 11.6.

26.8 294.7 13.2 379.9 26.6 11.5 26.5 314.7 13.2 380.0 26.3 11.5 26.2 414.7 12.8 380.3 24.7 11.2 24.7 514.7 12.5 380.6 23.1 10.9 23.1 614.7 12.2 386.8 20.8 10.6 20.7 714.7 11.8 387.8 17.6 10.3 17.6 814.7 11.5 388.9 13.9 10.0 13.8 914.7 11.1 390.1 9.7 9.7 9.5 1014.7 10.7 390.1 9.3 9.3 9.2 1114.7 10.3 390.2 9.0 9.0 8.9

INDIANA AND MICHIGAN POWER D. C. COOK NUCLEAR PLANT UPDATED FINAL SAFETY ANALYSIS REPORT Revision: 24.0 Table: 14.3.2-5 Page:

2 of 2 Unit 2 Safety Injection Flows Used in the SBLOCA Analysis - Injection Phase (1 CHG pump, 1 HHSI pump, 1 RHR pump)

(faulted loop CHG flow injects to RCS pressure and faulted loop HHSI / RHR flow spills to containment (0 psia) - 8.75-inch break)

RCS Pressure (psia)

Broken Loop (lbm / sec)

Intact Loops (lbm / sec)

Loop 1 CHG Loop 1 RHR / HHSI Loop 2 Loop 3 Loop 4 1214.7 9.9 390.2 8.6 8.6 8.5 1314.7 9.5 390.2 8.3 8.3 8.1 1414.7 9.0 390.2 7.9 7.9 7.8 1514.7 8.6 390.2 7.5 7.5 7.4 1614.7 8.1 390.2 7.1 7.1 7.0 1714.7 7.6 390.2 6.6 6.6 6.5 1814.7 7.1 390.2 6.2 6.1 6.1 1914.7 5.3 390.2 4.6 4.6 4.6 2014.7 4.7 390.2 4.1 4.1 4.0 2114.7 3.9 390.2 3.5 3.4 3.4 2214.7 3.1 390.2 2.7 2.7 2.6 2314.7 0.0 390.2 0.0 0.0 0.0 2414.7 0.0 390.2 0.0 0.0 0.0