ML16343B047

From kanterella
Jump to navigation Jump to search
7 to Updated Final Safety Analysis Report, Chapter 14, Table 14.3.1-4A, Minimum HHSI and RHR Combined Injection Flow, Page 1 of 1
ML16343B047
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/24/2016
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16336A263 List: ... further results
References
AEP-NRC-2016-42
Download: ML16343B047 (1)


Text

INDIANA AND MICHIGAN POWER D. C. COOK NUCLEAR PLANT UPDATED FINAL SAFETY ANALYSIS REPORT Revision: 24.0 Table: 14.3.1-4A Page:

1 of 1 UNIT 2 Minimum HHSI and RHR Combined Injection Flow Pressure (psia)

HHSI + RHR Total Injected Flow (gpm) 14.7 3,146.4 34.7 2,483.0 54.7 1,746.9 74.7 1,427.1 94.7 1,062.6 114.7 616.1 134.7 242.7 154.7 239.5 174.7 236.3 194.7 233.0 214.7 229.7 234.7 226.4 254.7 223.0 274.7 219.6 294.7 216.2 314.7 212.7